引文
[1]殷跃平.汶川八级地震滑坡特征分析[J].工程地质学报,2009,(1):29~38.Yin Yueping.Features of landslides triggered by the Wenchuanearthquake.Journal of Engineering Geology,2009,17(1):29~38.
[2]Highland,L.M.,P.Bobrowsky,The Landslide Handbook—AGuide to Understanding Landslides.2008,U.S.Geological SurveyCircular 1325:Reston,Virginia.p.129.
[3]黄润秋,裴向军,李天斌.汶川地震触发大光包巨型滑坡基本特征及形成机理分析[J].工程地质学报,2008,16(6):730~741.Huang Runqiu,Pei Xiangjun,Li Tianbin.The basic characteristicsand formation mechanism of Daguangbao large-scale landslide trig-gered by Wenchuan earthquake.Journal of Engineering Geology,2008,16(6):730~741.
[4]许强,黄润秋.5.12汶川大地震诱发大型崩滑灾害动力特征初探[J].工程地质学报,2008,16(6):721~729.Xu Qiang,Hu Runqiu.Kinetics characteristics of large landslidestriggered by May12th Wenchuan earthquake.Journal of Engineer-ing Geology,2008,16(6):721~729.
[5]Heim,A.,Bergsturz und Menschenleben.Fretz und Wasmuth,Zu¨rich,1932,218.
[6]Kent,P.E.,The transport mechanism in catastrophic rock falls.J.Geol,1966,74:79~83.
[7]Shreve,R.L.,The Blackhawk landslide.Geol.Soc.Am.Spec.Pap.,1968,108:1~47.
[8]Shreve,R.L.,Leakage and fluidisation in air-layer lubricated ava-lanches.Geol.Soc.Am.Bull.,1968b,79:653~658.
[9]Voighta,B.,J.Sousa,Lessons from Ontake-san:A comparative a-nalysis of debris avalanche dynamics Engineering Geology,1994,38(3~4):261~297.
[10]Sassa,K.Access to the dynamics of landslides during earth-quakes by a new cyclic loading high-speed ring shear apparatus.in 6th Int.Symp.Landslides.1992.Christchurch:Balkema,Rotterdam.
[11]Davies,T.R.H.,Spreading of rock avalanche debris by mechani-cal fluidization Rock Mechanics and Rock Engineering,1982,15(1):9~24.
[12]Campbell,C.S.,P.W.Cleary,M.Hopkins,Large-scale landslidesimulations:global deformation,velocities and basal friction.J.Geophys.Res.,1995,100:8267~8273.
[13]胡广韬.滑坡动力学[M].北京:地质出版社,1995.Hu Guangtao.Landslide Dynamics.Beijing:Geology Press,1995.
[14]胡厚田,刘涌江,邢爱国,等.高速远程滑坡流体动力学理论的研究[M].成都:西南交通大学出版社,2003.Hu Houtian,Liu Yongjiang,Xing Aiguo,et al.Study on fluid dy-namics theory of high-speed and long-runout landslide.Chengdu:Southwest Jiaotong University Press,2003.
[15]程谦恭,彭建兵,胡广韬,等.高速岩质滑坡动力学[M].成都:西南交通大学出版社,1999.Cheng Qiangong,Peng Jianbing,Hu Guangtao,et al.High-speedrock landslide dynamics.Chengdu:Southwest Jiaotong UniversityPress,1999.
[16]熊传祥,龚晓南,王成华,高速滑坡临滑变形能突变模型的研究[J].浙江大学学报(工学版),2000,34(4):443~447.Xiong Chuanxiang,Gong Xiaonan,Wang Chenghua.A deforma-tion energy catastrophic model of high-speed landslide before slid-ing.Journal of Zhejiang University(Engineering Science),2000,34(4):443~447.
[17]肖盛燮,周小平,杨海清,等.二维高速滑坡力学模型[J].岩石力学与工程学报,2006,25(3):456~461.Xiao Shengxie,Zhou Xiaoping,Yang Haiqing,et al.Two-dimen-sional mechanical model of high-speed landslides.Chinese Jour-nal of Rock Mechanics and Engineering,2006,25(3):456~461.
[18]刘涌江,胡厚田,白志勇.大型高速滑坡体运动的空气动力学研究[J].西南交通大学学报,2002,37(1):6~9.Liu Yongjiang,Hu Houtian,Bai Zhiyong.Aerodynamic Effect ofLarge-Scale and High-Speed Landslide.Journal of SouthwestJiaotong University,2002,37(1):6~9.
[19]赵晓彦,胡厚田,齐明柱.云南头寨沟大型岩质高速滑坡碰撞模型试验[J].自然灾害学报,2003,12(3):99~103.Zhao Xiaoyan,Hu Houtian,Qi Mingzhu.Model experiment ofhigh-speed collision of landslide rock masses in Touzhai Gully,Yunnan.Journal of Natural Disasters,2003,12(3):99~103.
[20]殷跃平.西藏波密易贡高速巨型滑坡特征及减灾研究[J].水文地质工程地质,2000,(4):8~11.Yin Yueping.Features and hazard mitigation of Yigong rapidhuge landslide,Bomi,Tibet.Hydrogeology and engineering geolo-gy,2000,(4):8~11.
[21]黄润秋,中国西部地区典型岩质滑坡机理研究[J].地球科学进展,2004,19(3):443~450.Huang Runqiu.Mechanism of large scale landslides in westernChina.Advance in earth sciences,2004,19(3):443~450.
[22]刘忠玉,马崇武,苗天德,等.高速滑坡远程预测的块体运动模型[J].岩石力学与工程学报,2000,19(6):742~746.Liu Zhongyu,Ma Chongwu,Miao Tiande,et al.Kinematic blockmodel of long run-out prediction for high-speed landslides.Chi-nese Journal of Rock Mechanics and Engineering,2000,19(6):742~746.
[23]黄润秋,裴向军,张伟锋,等.再论大光包滑坡特征与形成机制[J].工程地质学报,2009,17(6):725~736.Huang Runqiu,Pei Xiangjun,Zhang Weifeng,et al.Further ex-amination on characteristics and formation mechanism of Da-guangbao landslide.Journal of Engineering Geology,2009,17(6):725~736.
[24]王涛,马寅生,龙长兴,等.四川汶川地震断裂活动和次生地质灾害浅析[J].地质通报,2008,27(11):1913~1922.Wang Tao,Ma Yinsheng,Long Changxing,et al.Fault activity ofthe Wenchuan earthquake in Sichuan,China and seismic second-ary geohazards.Geological Bulletin of China,2008,27(11):1913~1922.
[25]张倬元,王士天,王兰生.工程地质分析原理[M].北京:地质出版社,1994.Zhang Zhuoyuan,Wang Shitian,Wang Lansheng.Principles ofengineering geology analysis.Beijing:Geology Press,1994.
[26]Li,X.,Z.Zhou,H.Yu,et al.Strong motion observations and re-cordings from the great Wenchuan Earthquake.Earthquake Engi-neering and Engineering Vibration,2008,7(3):235~246.
[27]中华人民共和国建设部,建筑抗震设计规范(GB 50011-2001)[S].北京:中国建筑科学研究院,2001.The People s Republic of China Ministry of Construction.Codefor Seismic Design of Buildings(GB 50011-2001).Beijing:China Academy of Building Research,2001.
[28]崔芳鹏,胡瑞林,殷跃平,等.地震纵横波时差耦合作用的斜坡崩滑效应研究[J].工程地质学报,2009,17(4):455~462.Cui Fangpeng,Hu Ruilin,Yin Yueping,et al.Numerical simula-tion of slope collapsing and sliding due to single or combined ac-tions of seismic p-and s-waves with time difference.Journal ofEngineering Geology,2009,17(4):455~462.