引文
[1]张倬元,王士天,王兰生.工程地质分析原理[M].北京:地质出版社,1994.Zhang Zhuo-yuan,Wang Shi-tian,Wang Lan-sheng.Principle of Engineering Geology Analysis[M].Beijing:Geological Publishing House,1994.
[2]詹文欢,钟建强,丘学林,等.南海及邻域现代构造应力场的数值模拟[J].华南地震,1992,12(3):11-20.Zhan Wen-huan,Zhong Jian-qiang,Qiu Xue-lin,et al.A Numerical Simulation of the Recent Tectonic StressField in South China Sea and Its Adjacent Areas[J].South China Journal of Seismology,1992,12(3):11-20.
[3]曹超,雷怀彦,翁梅洪.构造应力场数值模拟在望儿山金矿中的应用[J].黄金,2008,29(10):12-15.Cao Chao,Lei Huai-yan,Weng Mei-hong.Application of Numerical Simulation for TectonicStress Field in Wang’ershan Gold Mine[J].Gold,2008,29(10):12-15.
[4]王连捷,吴珍汉,王薇,等.青藏高原中段现今构造应力场的数值模拟[J].地质力学学报,2006,12(2):140-149.Wang Lian-jie,Wu Zhen-han,Wang Wei,et al.Numerical Modeling of the Present Tectonic StressField in the Central Qinghai-Tibet Plateau[J].Journalof Geomechanics,2006,12(2):140-149.
[5]陈蜀俊,姚运生,曾佐勋,等.三峡库首区蓄水前后构造应力场三维数值模拟研究[J].岩石力学与工程学报,2005,24(增刊2):5611-5618.Chen Shu-jun,Yao Yun-sheng,Zeng Zuo-xun,et al.Study on Numerical Simulation of Tectonic Stress FieldBefore and After Reservoir Impounding in the HeadArea of the Three Gorges[J].Chinese Journal of RockMechanics and Engineering,2005,24(Sup.2):5611-5618.
[6]陈晓利,陈国光,叶洪.渤海海域现代构造应力场的数值模拟[J].地震地质,2005,27(2):289-297.Chen Xiao-li,Chen Guo-guang,Ye Hong.Amathematical Simulation for the Tectonic Stress Fieldof the Bohai Sea Area[J].Seismology and Geology,2005,27(2):289-297.
[7]刘素梅,徐礼华.丹江口水库区构造应力场的数值模拟[J].岩石力学与工程学报,2004,23(23):4017-4021.Liu Su-mei,Xu Li-hua.Numerical Stimulation ofTectonic Stress Field at Danjiangkou Reservoir Area[J].Chinese Journal of Rock Mechanics andEngineering,2004,23(23):4017-4021.
[8]司荣军,王春秋,程国强.大安山矿后槽构造应力场数值模拟研究[J].岩土力学,2006,27(增刊):167-170.Si Rong-jun,Wang Chun-qiu,Cheng Guo-qiang.Numerical Simulation Study on Tectonic Stress Field ofHoucao Area in Da’anshan Coal Mine[J].Rock andSoil Mechanics,2006,27(Sup.):167-170.
[9]何江达,谢红强,王启智,等.官地水电站坝址区初始地应力场反演分析[J].岩土工程学报,2009,31(2):166-171.He Jiang-da,Xie Hong-qiang,Wang Qi-zhi,et al.Inversion Analysis of Initial Geostress in Dam Site ofGuandi Hydropower Project[J].Chinese Journal ofGeotechnical Engineering,2009,31(2):166-171.
[10]付玉华,王兴明,袁海平.构造应力场边界载荷反演的有限元逆逼法[J].岩土力学,2009,30(6):1850-1855.Fu Yu-hua,Wang Xing-ming,Yuan Hai-ping.FiniteElement Inverse Analysis of Boundary Load forTectonic Stress Field[J].Rock and Soil Mechanics,2009,30(6):1850-1855.
[11]周洪福,聂德新,陈津民.深部破碎岩体变形模量的一种新型试验方法及工程应用[J].吉林大学学报:地球科学版,2010,40(6):1390-1394.Zhou Hong-fu,Nie De-xin,Chen Jin-min.A NewExperimentation Method and an Example ofDeformation Modulus for Deep Cracked Rock Mass[J].Journal of Jilin University:Earth ScienceEdition,2010,40(6):1390-1394.