引文
[1]中国国家标准化管理委员会.GB/T19531.2—2004地震台站观测环境技术要求第2部分:电磁观测[S].北京:中国标准出版社,2004.Standardization Administration of China.GB/T 19531.2—2004 Technical requirement for the observationalenvironment of seismic stations-Part2:Electromagneticobservation[S].Beijing:Standard Press of China,2004(inChinese).
[2]Kappenman J G,Albertson V D.Bracing for thegeomagnetic storms[J].IEEE Spectrum,1990,27(3):27-33.
[3]Pirjola R.Geomagnetically induced currents duringmagnetic storms[J].IEEE Transactions on PlasmaScience,2000,28(6):1867-1873.
[4]Albertson V D,Thorson J M,Claylon R E,et al.Solarinduced currents in power system:cause and effects[J].IEEE Transactions on Power Apparatus and Systems,1973,92(2):471-477.
[5]Kappenman J G.Storm sudden commencement events andassociated geomagnetically induced current risks toground-based systems at low-latitude and midlatitudelocations[J].Space Weather,2003,1(3):1016-1022.
[6]Radasky W A,Kappenman J G.Impacts of geomagneticstorms on EHV and UHV power grids[C]//2010Asia-Pacific International Symposium on ElectromagneticCompatibility.Beijing,China:APEMC,2010:695-698.
[7]Trichtchenko L,Boteler D H.Effects of recentgeomagnetic storms on power systems[C]//7thInternational Symposium on ElectromagneticCompatibility and Electromagnetic Ecology.Saint-Petersburg,Russia:IEEE,2007:265-268.
[8]Trichtchenko L,Boteler D H.Response of power systemsto the temporal characteristics of geomagneticstorms[C]//2006 Canadian Conference on Electrical andComputer Engineering.Ottawa,Canada:CCECE,2006:390-393.
[9]Radasky W,Kappenman J,Gilbert J.An overview of thedevelopment and validation of large power grid modelsfor geomagnetic storms[C]//4th Asia-Pacific Conferenceon Environmental Electromagnetics.Dalian,China:CEEM,2006:25-28.
[10]能源部电力科学研究院.关于500kV线路环境影响的试验研究(电力线路对地震(磁)台站影响的试验研究)[R].北京:中国电力科学研究院,1989.Electric Power Research Institute of Energy Department.Experimental research of environmental impact from500 kV power line(experimental research on seismicstation from power lines)[R].Beijing:China ElectricPower Research Institute,1989(in Chinese).
[11]哈辉,邱鹏程,辛长江,等.格尔木地磁台观测环境测试与分析[J].地震地磁观测与研究,2003,24(5),76-81.Ha Hui,Qiu Pengcheng,Xin Changjiang,et al.Environmental test and analysis on geomagneticobservation in Geermu station[J].Seismological andGeomagnetic Observation and Research,2003,24(5),76-81(in Chinese).
[12]齐磊,崔翔,吴燕.交流输电线路对地震观测台站的最小距离研究[J].高电压技术,2010,36(3):649-656.Qi Lei,Cui Xiang,Wu Yan.Minimum distance betweenAC transmission line and seismic observation station[J].High Voltage Engineering,2010,36(3):649-656(inChinese).
[13]沈红会,周加新,张秀霞,等.直流输电对江苏地磁观测的影响分析[J].地震地磁观测与研究,2005,26(5):65-70.Shen Honghui,Zhou Jiaxin,Zhang Xiuxia,et al.Theinfluence analysis of direct current transmit electricity togeomagnetic observation[J].Seismological andGeomagnetic Observation and Research,2005,26(5):65-70(in Chinese).
[14]沈红会,张秀霞,冯志生,等.减小直流输电对地磁观测影响的几种办法[J].中国地震,2005,21(4),530-535.Shen Honghui,Zhang Xiuxia,Feng Zhisheng,et al.Thecountermeasures to the influence of direct currenttransmitting to geomagnetic observation[J].EarthquakeResearch in China,2005,21(4),530-535(in Chinese).
[15]郝长安,赵伦,倪友忠,等.葛洲坝-南桥直流输电线路对地磁台的影响[J].地震地磁观测与研究,2008,29(5),9-15.Hao Changan,Zhao Lun,Ni Youzhong,et al.Theinfluence of Gezhouba-Nanqiao’s direct currenttransmission line to geomagnetic observatory[J].Seismological and Geomagnetic Observation andResearch,2008,29(5),9-15(in Chinese).
[16]唐波,文远芳,刘红志,等.直流输电线路对地磁场观测的影响[J].高电压技术,2011,37(4),952-960.Tang Bo,Wen Yuanfang,Liu Hongzhi,et al.Influenceof DC transmission line on geomagnetic observation[J].High Voltage Engineering,2011,37(4),952-960(inChinese).
[17]Nurul S A H,Geri G,Ismail M,et al.The hurst exponentsof the geomagnetic horizontal component during quiet andactive periods[C]//International Conference on SpaceScience and Communication.Negeri Sembilan,Malaysia:IEEE,2009:186-190.
[18]胡聿贤.地震工程学[M].北京:地震出版社,2006:8-9.Hu Yuxian.Earthquake Engineering[M].Beijing:Earthquake Press,2006:8-9(in Chinese).
[19]唐波,文远芳,张小武,等.中短波段输电线路无源干扰防护间距求解的关键问题[J].中国电机工程学报,2011,31(19):129-137.Tang Bo,Wen Yuanfang,Zhang Xiaowu,et al.Keyproblems of solving reradiation interference protectingdistance between power transmission line and radiostation at MF and SF[J].Proceedings of the CSEE,2011,31(19),129-137(in Chinese).
[20]The Energy Standards Resources Center.Coordinateconversions and transformations including formulas(part2)-formulas for coordinate operations other than mapprojections[OL].http://www.globalsecurity.org/military/library/policy/army/fm/6-2/appe2.htm#tabe_22,2004.
[21]Tang Bo,Wen Yuanfang,Zhao Zhibin,et al.Computationmodel of the reradiation interference protecting distancebetween radio station and UHV power lines[J].IEEETransactions on Power Delivery,2011,26(2):1092-1100.
[22]唐波,文远芳,赵志斌,等.特高压角钢铁塔无源干扰计算的三维面模型[J].中国电机工程学报,2011,31(4):104-111.Tang Bo,Wen Yuanfang,Zhao Zhibin,et al.Three-dimensional surface computation model of thereradiation interference from UHV angle-steel tower[J].Proceedings of the CSEE,2011,31(4):104-111(inChinese).
[23]于寅.高等工程数学[M].武汉:华中科技大学出版社,2005:47-48.Yu Yin.Advanced engineering mathematics[M].Wuhan:Huazhong University of Technology&Science Press,2005:47-48(in Chinese).
[24]中国地震局监测预报司.地震电磁数字观测技术[M].北京:地震出版社,2002:51-52.Monitoring and Prediction Department of ChinaEarthquake administration.digital observation technologyof seismic electromagnetic[M].Beijing:EarthquakePress,2002:51-52(in Chinese).