引文
[1]陶慕轩,聂建国.预应力钢-混凝土连续组合梁的非线性有限元分析[J].土木工程学报,2011,44(2):8-20.TAO Muxuan,NIE Jianguo.Nonlinear Finite ElementAnalysis of Prestressed Continuous Steel ConcreteComposite Beams[J].China Civil Engineering Journal,2011,44(2):8-20.
[2]戚菁菁,蒋丽忠,张传增,等.界面滑移、竖向掀起及剪切变形对钢-混凝土组合连续梁动力性能的影响[J].中南大学学报:自然科学版,2010,41(6):2334-2343.QI Jingjing,JIANG Lizhong,ZHANG Chuanzeng,et al.Effects of Interface Slip,Vertical Uplift and ShearDeformation on Dynamic Behavior of Steel-concreteComposite Continuous Beams[J].Journal of CentralSouth University:Science and Technology Edition,2010,41(6):2334-2343.
[3]王海洋,李亮亮.体外预应力简支梁的动力性能分析[J].公路交通科技,2006,23(1):70-73.WANG Haiyang,LI Liangliang.Dynamic PerformanceAnalysis of Simple Beam with External Prestressing Force[J].Journal of Highway and Transportation Research andDevelopment,2006,23(1):70-73.
[4]吕西林,张杰.钢和混凝土竖向混合结构阻尼特性研究[J].土木工程学报,2012,45(3):10-16.LXilin,ZHANG Jie.Damping Behavior of VerticalStructures with Upper Steel and Lower ConcreteComponents[J].China Civil Engineering Journal,2012,45(3):10-16.
[5]黄本才.组合结构振动的等效阻尼比[J].上海力学,1998,19(2):141-145.HUANG Bencai.Equivalent Damping Ratios of Vibrationin Composite Structures[J].Shanghai Mechanics,1998,19(2):141-145.
[6]朱镜清.关于复阻尼理论的两个基本问题[J].固体力学学报,1992,13(2):113-118.ZHU Jingqing.On the Two Basic Problems of ComplexDamping Theory[J].Acta Mechanica Solida Sinica,1992,13(2):113-118.
[7]OLLGAARD J G,SLUTTER R G,FISHER J W.ShearStrength of Stud Connectors in Lightweight and Normal-Weight Concrete[J].AISC Engineering Journal,1971(4):55-68.
[8]Eurocode 4:ENV1994-2,Design of Composite Steel andConcrete Structures,Part 2:Bridge[S].
[9]OKADA J,YODA T,LEBET J P.A Study of theGrouped Arrangements of Stud Connectors on ShearStrength Behavior[J].Structural Engineering/EarthquakeEngineering,JSCE,2006,23(1):75-89.
[10]SHIM C S,PARK J S,JEON S M,et al.ExperimentalStudy on Group Stud Shear Connection[C]∥LIEW R,CHOO Y S.Proceedings of 5th International Conference onAdvances in Steel Structures.Singapore:[s.n.],2007:932-937.
[11]侯文崎,叶梅新.铁路桥梁群钉组合结构极限承载力和静力行为分析[J].中国铁道科学,2011,32(1):55-61.HOU Wenqi,YE Meixin.Analysis on the UltimateBearing Capacity and the Statical Behavior of theComposite Structures with Grouped Studs in Railway Bridge[J].China Railway Science,2011,32(1):55-61.
[12]ARIYAWARDENA N D,GHALI A.Design of PrecastPrestressed Concrete Members Using External Prestressing[J].PCI Journal,2002,47(2):84-94.
[13]SIVALEEPUNTH C,NIWA J,BUI K D,et al.Predictionof Tendon Stress and Flexural Strength of ExternallyPrestressed Concrete Beams[J].Journal of JSCE(E),2006,62(1):260-273.
[14]李小珍,刘孝寒,刘德军.考虑桩-土相互作用的连续刚构桥车桥耦合振动分析[J].振动与冲击,2011,30(12):54-58.LI Xiaozhen,LIU Xiaohan,LIU Dejun.Coupled VibrationAnalysis of a Railway Continuous Rigid-frame Bridge andVehicles with Soil-structure Interaction[J].Journal ofVibration and Shock,2011,30(12):54-58.
[15]孙利民,张晨南,潘龙,等.桥梁桩土相互作用的集中质量模型及参数确定[J].同济大学学报,2002,30(4):409-415.SUN Limin,ZHANG Chennan.PAN Long,et al.Lumped-mass Model and Its Parameters for DynamicAnalysis of Bridge Pier-pile-soil System[J].Journal ofTongji University,2002,30(4):409-415.
[16]蒋通,田冶见宏.地基-结构动力相互作用分析方法[M].上海:同济大学出版社,2009:180-188.JIANG Tong,TAJIMI H.Analysis Method of Foundation-structure Dynamic Interaction[M].Shanghai:TongjiUniversity Press,2009:180-188.
[17]李威威,刘伟庆,王曙光,等.基于Simulink的桩-土-结构相互作用反应谱分析[J].世界地震工程,2012,28(1):103-111.LI Weiwei,LIU Weiqing,WANG Shuguang,et al.Response Spectrum Analysis of Pile-soil-structureInteraction Based on Simulink[J].World EarthquakeEngineering,2012,28(1):103-111.
[18]JTG/T B02-01—2008,公路桥梁抗震设计细则[S].JTG/T B02-01—2008,Guidelines for Seismic Design ofHighway Bridges[S].