引文
[1]朱正国,孙明路,朱永全,等.超小净距隧道爆破振动现场监测及动力响应分析研究[J].岩土力学,2012,33(12):3 747–3 752.(ZHU Zhengguo,SUN Minglu,ZHU Yongquan,et al.Field monitoring on blasting vibration and dynamic response of ultra-small spacing tunnels[J].Rock and Soil Mechanics,2012,33(12):3 747–3 752.(in Chinese))
[2]赵明生,梁开水,李本伟.段药量对爆破振动信号时频特性的影响研究[J].振动与冲击,2012,31(7):85–88.(ZHAO Mingsheng,LIANG Kaishui,LI Benwei.Influence of deck charge on time-frequency characteristics of a blasting vibration signal[J].Journal of Vibration and Shock,2012,31(7):85–88.(in Chinese))
[3]傅洪贤,赵勇,谢晋水,等.隧道爆破近区爆破振动测试研究[J].岩石力学与工程学报,2011,30(2):335–340.(FU Hongxian,ZHAO Yong,XIE Jinshui,et al.Study of blasting vibration test of area near tunnel blasting source[J].Chinese Journal of Mechanics and Engineering,2011,30(2):335–340.(in Chinese))
[4]龚建伍,夏才初,郑志东,等.鹤上三车道小净距隧道爆破振动测试与分析[J].岩石力学与工程学报,2007,26(9):1 882–1 887.(GONG Jianwu,XIA Caichu,ZHENG Zhidong,et al.Measurement and analysis of blasting vibration in Heshang three-lane tunnels with small clear-space[J].Chinese Journal of Mechanics and Engineering,2007,26(9):1 882–1 887.(in Chinese))
[5]陈庆,王宏图,胡国忠,等.隧道开挖施工的爆破振动监测与控制技术[J].岩土力学,2005,26(6):964–967.(CHEN Qing,WANG Hongtu,HU Guozhong,et al.Monitoring and controlling technology for blasting vibration induced by tunnel excavation[J].Rock and Soil Mechanics,2005,26(6):964–967.(in Chinese))
[6]朱泽兵,张永兴,刘新荣,等.特大断面车站隧道爆破开挖对地表建筑物的影响[J].重庆大学学报,2010,33(2):110–116.(ZHU Zebing,ZHANG Yongxing,LIU Xinrong,et al.Influence of blasting vibration on adjacent buildings of station tunnel[J].Journal of Chongqing University,2010,33(2):110–116.(in Chinese))
[7]许登根.穿越火车站候车厅的浅埋隧道控制爆破[J].爆破,2004,21(4):22–24.(XU Denggen.Controlled blasting for shallow-buried tunnel under the waiting room in a railway station[J].Blasting,2004,21(4):22–24.(in Chinese))
[8]傅洪贤,沈周,赵勇,等.隧道电子雷管爆破降振技术试验研究[J].岩石力学与工程学报,2012,31(3):597–603.(FU Hongxian,SHEN Zhou,ZHAO Yong,et al.Experimental study of decreasing vibration technology of tunnel blasting with digital detonator[J].Chinese Journal of Mechanics and Engineering,2012,31(3):597–603.(in Chinese))
[9]HUANG N E,SHEN Z,LONG S R.A new view of nonlinear water waves-Hilbert spectrum[J].Annual Reviews of Fluid Mechanics,1999,31(1):417–457.
[10]HUANG N E,SHEN Z,LONG S R,et al.The empirical mode decomposition and the Hilbert spectrum for nonlinear and nonstationary time series analysis[C]//Proceedings of the Royal Society of London A.[S.l.]:The Royal Society,1998:903–995.
[11]徐振洋,杨军,陈占扬.高精度雷管逐孔起爆地震信号的精确时频分析[J].煤炭学报,2013,38(增2):331–335.(XU Zhenyang,YANG Jun,CHEN Zhanyang.Precise time-frequency analysis on seismic signal by hole initiation using high-precision detonators[J].Journal of China Coal Society,2013,38(Supp.2):331–335.(in Chinese))
[12]张义平,李夕兵,赵国彦,等.基爆破震动信号的时频分析[J].岩土工程学报,2005,27(12):1 473–1 477.(ZHANG Yiping,LI Xibing,ZHAO Guoyan,et al.Time-frequency analysis of blasting vibration signals[J].Chinese Journal of Geotechnical Engineering,2005,27(12):1 473–1 477.(in Chinese))
[13]凌同华,李夕兵.爆破振动信号不同频带的能量分布规律[J].中南大学学报:自然科学版,2004,35(2):310–315.(LING Tonghua,LI Xibing.Laws of energy distribution in different frequency bands for blast vibration signals[J].Journal of Central South University:Natural Science,2004,35(2):310–315.(in Chinese))
[14]范作鹏,钱守一,李启月.微差爆破实际延迟时间识别方法比较与优选[J].矿冶工程,2012,32(3):4–8.(FAN Zuopeng,QIAN Shouyi,LI Qiyue.Comparison and optimization of methods for real delay time identification in millisecond blasting[J].Mining and Metallurgical Engineering,2012,32(3):4–8.(in Chinese))
[15]钱守一,李启月.微差爆破实际延迟时间的HHT瞬时能量识别法[J].矿业研究与开发,2012,32(2):113–116.(QIAN Shouyi,LI Qiyue.HHT instantaneous energy method to identify of delay time in millisecond blasting[J].Mining Research and Development,2012,32(2):113–116.(in Chinese))
[16]张义平,李夕兵,赵国彦.爆破微差延时的EMD识别法[J].地下空间与工程学报,2006,2(3):488–490.(ZHANG Yiping,LI Xibing,ZHAO Guoyan.The method of using EMD to identify time of delay in millisecond blasting[J].Chinese Journal of Underground Space and Engineering,2006,2(3):488–490.(in Chinese))