引文
[1]李术才,李树忱,张庆松,等.岩溶裂隙水与不良地质情况超前预报研究[J].岩石力学与工程学报,2007,26(2):217-225.(LI Shu-cai,LI Shu-chen,ZHANG Qing-song,etal.Forecast of karst-fractured groundwater and defectivegeological conditions[J].Chinese Journal of Rock Mechanicsand Engineering,2007,26(2):217-225.(in Chinese))
[2]李术才,薛翊国,张庆松,等.高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J].岩石力学与工程学报,2008,27(7):1297-1307.(LI Shu-cai,XUE Yi-guo,ZHANG Qing-song,et al.Key technology study oncomprehensive prediction and early-warning of geologicalhazards during tunnel construction in high-risk karst areas[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1297-1307.(in Chinese))
[3]底青云,王光杰,安志国,等.南水北调西线千米深长隧洞围岩构造地球物理勘探[J].地球物理学报,2006,49(6):1836-1842.(DI Qing-yun,WANG Guang-jie,AN Zhi-guo,et al.Geophysical exploration of a long deep tunnel on thewest route of South-to-North Water Diversion Project[J].Chinese Journal of Geophysics,2006,49(6):1836-1842.(in Chinese))
[4]刘志刚,刘秀峰.TSP(隧道地震勘探)在隧道隧洞超前预报中的应用与发展[J].岩石力学与工程学报,2003,22(8):1399-1402.(LIU Zhi-gang,LIU Xiu-feng.TSP applicationand development in tunnel lead forecast[J].Chinese Journalof Rock Mechanics and Engineering,2003,22(8):1399-1402.(in Chinese))
[5]苏茂鑫,李术才,薛翊国,等.隧道掌子面前方低阻夹层的瞬变电磁探测研究[J].岩石力学与工程学报,2010(增刊1):2645-2650.(SU Mao-xin,LI Shu-cai,XUE Yi-guo,et al.Research on detection of low resistivity interbed infront of tunnel face of transient electromagnetic method[J].Chinese Journal of Rock Mechanics and Engineering,2010(S1):2645-2650.(in Chinese))
[6]刘斌,李术才,李树忱,等.复信号分析技术在地质雷达预报岩溶裂隙水中的应用研究[J].岩土力学,2009,30(7):2191-2196.(LIU Bin,LI Shu-cai,LI Shu-chen,et al.Application and study on complex signal analysis in theprediction of karst-fractured ground water with GPR[J].Rockand Soil Mechanics,2009,30(7):2191-2196.(in Chinese))
[7]刘斌,李术才,李树忱,等.隧道含水构造直流电阻率法超前探测研究[J].岩土力学,2009,30(10):3093-3101.(LIU Bin,LI Shu-cai,LI Shu-chen,et al.Study of advanceddetection of water-bearing geological structures with DCresistivity method[J].Rock and Soil Mechanics,2009,30(10):3093-3101.(in Chinese))
[8]曲海峰,刘志刚,朱合华.隧道信息化施工中综合地质预报技术[J].岩石力学与工程学报,2006,25(6):1246-1251.(QU Hai-feng,LIU Zhi-gang,ZHU He-hua.Techniqueof synthetic geologic prediction ahead in tunnel informationalconstruction[J].Chinese Journal of Rock Mechanics andEngineering,2006,25(6):1246-1251.(in Chinese))
[9]李天斌,孟陆波,朱劲,等.隧道超前地质预报综合分析方法[J].岩石力学与工程学报,2009,28(12):2429-2436.(LI Tian-bin,MENG Lu-bo,ZHU Jin,et al.Comprehensive analysis method for advanced forecast ofgeology in tunnels[J].Chinese Journal of Rock Mechanicsand Engineering,2009,28(12):2429-2436.(in Chinese))
[10]岳建华,刘树才.矿井直流电法勘探[M].徐州:中国矿业大学出版社,2000.(YUE Jian-hua,LIU Shu-cai.Underground mine electrical prospecting[M].Xuzhou:ChinaUniversity of Mining and Technology Press,2000.(in Chinese))
[11]李学军.煤矿井下定点源梯度法超前探测试验研究[J].煤田地质与勘探,1992,20(4):59-62.(LI Xue-jun.Studyand experiment on heading detecting by fixed electric sourcegradient method in underground mine[J].Coal Geology&Exploration,1992,20(4):59-62.(in Chinese))
[12]程久龙,王玉和,于师建,等.巷道掘进中电阻率法超前探测原理与应用[J].煤田地质与勘探,2000,28(4):60-62.(CHENG Jiu-long,WANG Yu-he,YU Shi-jian,et al.The principle and application of advance surveying inroadway excavation by resistivity method[J].Coal Geology&Exploration 2000,28(4):60-62.(in Chinese))
[13]黄俊革,阮百尧,王家林.坑道直流电阻率法超前探测的快速反演[J].地球物理学报,2007,50(2):619-624.(HUANG Jun-ge,RUAN Bai-yao,WANG Jia-lin.The fastinversion for advanced detection using DC resistivity intunnel[J].Chinese Journal of Geophysics,2007,50(2):619-624.(in Chinese))
[14]阮百尧,邓小康,刘海飞,等.坑道直流电阻率超前聚焦探测新方法研究[J].地球物理学报,2009,52(1):289-296.(RUAN Bai-yao,DENG Xiao-kang,LIU Hai-fei,et al.Research on a new method of advanced focus detection withDC resistivity in tunnel[J].Chinese Journal of Geophysics,2009,52(1):289-296.(in Chinese))
[15]强建科,阮百尧,周俊杰.三维坑道直流聚焦法超前探测的电极组合研究[J].地球物理学报,2010,53(3):695-699.(QIANG Jian-ke,RUAN Bai-yao,ZHOU Jun-jie.Research on the array of electrode of andvanced focusdetection with 3D DC resistivity in tunnel[J].Chinese Journalof Geophysics,2010,53(3):695-699.(in Chinese))
[16]张平松,刘盛东,曹煜.坑道掘进立体电法超前预报技术研究[J].中国煤炭地质,2009,21(2):50-53.(ZHANG Ping-song,LIU Sheng-dong,CAO Yu.A study onstereo electric method advance prediction technology intunnel excavation[J].Coal Geology of China,2009,21(2):50-53.(in Chinese))
[17]强建科,阮百尧,周俊杰,等.煤矿巷道直流三极法超前探测的可行性[J].地球物理学进展,2011,26(1):320-326.(QIANG Jian-ke,RUAN Bai-yao,ZHOU Jun-jie,et a1.Thefeasibility of advanced detection using three-electrodemethod in coal-mine tunnel[J].Progress in Geophysics,2011,26(1):320-326.(in Chinese))
[18]王家映.地球物理反演理论[M].北京:高等教育出版社,2002.(WANG Jia-ying.Inverse theory in geophysics[M].Beijing:Higher Education Press,2002.(in Chinese))
[19]YUTAKA Sasaki.3D resisitivity inversion using thefinite-element method[J].Geophysics,1994,59(11):1839-1848.
[20]ZHANG Jie,RANDALL L Mackie,THEODORE R Madden.3-D resistivity forward modeling and inversion usingconjugate gradients[J].Géotechnique,1994,60(5):1313-1325.
[21]ADAM Pidlisecky,ELDAD Haber,ROSEMARY Knight.RESINVM3D:A 3D resistivity inversion package[J].Geophysics,2007,72(2):H1-H10.
[22]闫永利,陈本池,赵永贵,等.电阻率层析成像非线性反演[J].地球物理学报,2009,52(3):758-764.(YANYong-li,CHEN Ben-chi,ZHAO Yong-gui,et al.Nonlinearinversion for electrical resistivity tomography[J].ChineseJournal of Geophysics,2009,52(3):758-764.(in Chinese))
[23]SINGH U K,TIWARI R K,SINGH S B.One-dimensionalinversion of geo-electrical resistivity sounding data usingartificial neural networks—a case study[J].Computers&Geosciences,2005,31(1):99-108.
[24]李帝铨,王光杰,底青云,等.基于遗传算法的CSAMT最小构造反演[J].地球物理学报,2008,51(4):1234-1245.(LI Di-quan,WANG Guang-jie,DI Qing-yun,et al.The application of genetic algorithm to CSAMT inversion forminimum structure[J].Chinese Journal of Geophysics,2008,51(4):1234-1245.(in Chinese))
[25]刘斌.基于电阻率法与激电法的隧道含水地质构造超前探测与突水灾害实时监测研究[D].济南:山东大学,2010.(LIU Bin.Study on the water-bearing structureadvanced detection and water inrush hazards real-timemonitoring in tunnel based on the electrical resistivity andinduced polarization method[D].Jinan:Shandong University,2010.(in Chinese))
[26]姚磊华,李竞生.综合改进的遗传算法反演三维地下水流模型参数[J].岩石力学与工程学报,2004,23(4):625-630.(YAO Lei-hua,LI Jing-sheng.Parameter identificationof 3D groundwater flow model with improved GeneticAlgorithm[J].Chinese Journal of Rock Mechanics andEngineering,2004,23(4):625-630.(in Chinese))