引文
[1]陈德裕,温克昌,蔡洋.形成全国联合电力系统的时机和需要解决的问题[J].中国电机工程学报,1995,15(3):145-149.Chen Deyu,Wen Kechang,Cai Yang.Time and problems to construct the nation-wide interconnected power system in china[J].Proceedings of the CSEE,1995,15(3):145-149(in Chinese).
[2]王韶,周家启.双回平行输电线路可靠性模型[J].中国电机工程学报,2003,23(9):53-56.Wang Shao,Zhou Jiaqi.A reliability evaluation model for two transmission lines in parallel[J].Proceedings of the CSEE,2003,23(9):53-56(in Chinese).
[3]刘健,程红丽,毕鹏翔.配电网的简化模型[J].中国电机工程学报,2003,21(12):77-82.Liu Jian,Cheng Hongli,Bi Pengxiang.A simplified model for distribution system[J].Proceedings of the CSEE,2003,21(12):77-82(in Chinese).
[4]宋之平.从可持续发展的战略高度重新审视热电联产[J].中国电机工程学报,1998,18(4):225-230.Song Zhiping.Rediscovering the combined heat and power in terms of the sustainable development[J].Proceedings of the CSEE,1998,18(4):225-230(in Chinese).
[5]陈国庆,孙才新,张志劲,等.计及风速影响的500kV同杆双回线路绕击耐雷性能计算模型研究[J].中国电机工程学报,2003,23(5):108-112.Chen Guoqing,Sun Caixin,Zhang Zhijin,et al.Study on the calculation model of lightning protection performance of shielding failure for500kV double circuit transmission line[J].Proceedings of the CSEE,2003,23(5):108-112(in Chinese).
[6]汤振飞,唐国庆,于尔铿,等.电力市场输电定价[J].中国电机工程学报,2001,21(10):91-95.Tang Zhenfei,Tang Guoqing,Yu Erkeng,et al.Power market transmission pricing[J].Proceedings of the CSEE,2001,21(10):91-95(in Chinese).
[7]项立人.应该加快我国特高压输电前期工作研究[J].电网技术,1999,20(2):54-58.Xiang Liren.Speed up earlier UHV transmission research in China[J].Power System Technology,1999,20(2):54-58(in Chinese).
[8]李宏男,陆鸣,王前信.大跨越自立式高压输电塔电缆体系的简化抗震计算[J].地震工程与工程震动,1990,10(2):73-87.Li Hongnan,Lu Ming,Wang Qianxin.Simplified aseismic calculation of high voltage system consisting of long span transmission lines and their supporting towers[J].Earthquake Engineering and Engineering Vibration,1990,10(2):73-87(in Chinese).
[9]李宏男,王前信.大跨越输电塔体系的动力特性[J].土木工程学报,1997,30(5):28-36.Li Hongnan,Wang Qianxin.Dynamic characteristics of long-span transmission lines and their supporting towers[J].China Civil Engineering Journal,1997,30(5):28-36(in Chinese).
[10]李宏男,石文龙,贾连光.导线对输电塔体系纵向振动的影响界限及简化抗震计算方法[J].振动与冲击,2004,23(2):1-8.Li Hongnan,Shi Wenlong,Jia Lianguang.Limitations of effects of lines on in-plane vibrations of transmission towers and simplified seismic calculation method[J].Journal of Vibration and Shock,2004,23(2):1-8(in Chinese).
[11]岳茂光,王东升,李宏男,等.近断层地震动作用下输电塔-导线体系反应分析[J].地震工程与工程振动,2005,25(4):116-125.Yue Maoguang,Wang Dongsheng,Li Hongnan,et al.Response of power transmission tower-cable system subjected to near-fault ground motions[J].Earthquake Engineering and Engineering Vibration,2005,25(4):116-125(in Chinese).
[12]石文龙,李宏男,贾连光.输电塔-导线耦联体系模型的振动台试验研究[J].工程力学,2006,23(5):89-93.Shi Wenlong,Li Hongnan,Jia Lianguang.Shaking table test of coupled system of transmission lines and towers[J].Engineering Mechanics,2006,23(5):89-93(in Chinese).
[13]Ronaldo C B,Rosangela S R,Michele S P.et al.Dynamic behavior and stability of transmission line towers under wind forces[J].J.Wind Eng.Ind.Aerodyn,2003,91(8):1051-1067.
[14]Kikuchi N,Matsuzaki Y,Yukino T,et al.Aerodynamic drag of new-design electric power wire in a heavy rainfall and wind[J].J.Wind Eng.Ind.Aerodyn,2003,91(1):41-51.
[15]Li Hongnan,Bai Haifeng.High-voltage transmission tower-line system subjected to disaster loads[J].Progress In Natural Science,2006,16(9):899-911.
[16]Simiu E,Scanlan R H.Wind effects on structures[M].New York:John Wiley and Sons,1996.
[17]Shinozuka M,Jan C M.Digital simulation of random processes and its applications[J].Sound Vib,1972,25(1):111-128.
[18]王之宏.风荷载的模拟研究[J].建筑结构学报,1994,15(1):44-52.Wang Zhihong.Simulation of Wind Loading[J].Journal of building structures,1994,15(1):44-52(in Chinese).
[19]盛裴轩,毛节泰,李建国,等.大气物理学[M].北京:北京大学出版社,2003.
[20]贡力.黄土高原降雨雨滴动能的侵蚀计算[J].兰州交通大学学报(自然科学版),2005,24(4):43-45.Gong Li.Erosion calculation of raindrops'kinetic energy of loess plateau's rainfall[J].Journal of Lanzhou Jiaotong University(Natural Sciences),2005,24(4):43-45(in Chinese).