引文
[1]王毅才.隧道工程(第二版)[M].北京:人民交通出版社,2006.Wang Yi-Cai.Tunnel engineering(second edition)[M].Beijing:peoples traffic press,2006.
[2]Xu Gan-cheng Zheng Ying-ren etc.Rock engineering applicationsof yield criterion[J].Journal of Geotechnical Engineering,1990,12(2):93-99.
[3]Stephen.D.Butt.Analysis of high frequency microseismicityrecordedgeophsics at an underground hard rock mine[J].Pureand Appllied Geophsics,1997(150):693-704.
[4]刘新荣,祝云华,陈金华,等.高压富水区隧道超前地质预报应用研究[J].地球物理学进展,2008,23(4):1304-1309.Liu Xin-rong,Zhu Yun-hua,ChenJing-hua etc.Research onthe application of advanced geological prediction to the highpressure and rich water in tunnels[J].Progress in Geophysics,2008,23(4):1304-1309.
[5]程辉,底青云,李帝铨.频率信号激励下岩石电性参数研究[J].地球物理学进展,2010,23(3):918-925.Cheng Hui,Di qing-yun,Li Di-quan.frequency signalincentive electrical parameters of rock under study[J].Progress in Geophysics,2010,23(3):918-925.
[6]赵永贵.国内外隧道超前预报技术评析与推介[J].地球物理学进展,2006,46(4):1114-1117.ZHAO Yong-gui.Analysis and recommendation of tunnelprediction techniques at home and abroad[J].Progress inGeophysics,2006,46(4):1114-1117.
[7]肖宽怀,刘浩,孙宇,等.地震CT勘探在昆石公路隧道病害诊断中的应用[J].地球物理学进展,2003,18(3):472-476.Xiao Kuang-huai,Liu Hao,Sun Yu,etc.Seismic tomographyused to examine geological hazar ding the tunnels ofKunming—Shilin highway[J].Progress In Geophysics,2003,18(3):472-476.
[8]李志华.某新建铁路复杂长隧道岩层地质与CSAMT特征[J].地球物理学进展,2005,45(4):632-636.LI Zhi-hua.Geology and CSAMT character of long complexrailway tunnel[J].Progress In Geophysics,2005,45(4):632-636.
[9]王齐仁,杨天春.隧道地质灾害超前预报的地震反射法[J].地球物理学进展,2006,21(2):643-649.Wang Qi-ren,Yang Tian-chun.The seismic reflection methodpredicting tunnel geological hazards[J].Progress InGeophysics,2006,21(2):643-649.
[10]石建勋,刘新荣,刘元锋.隐块体在连拱隧道工程中引起的灾害[J].地球物理学进展,2010,25(6):2199-2203.SHI Jian-xun,LIU Xin-rong,LIU Yuan-feng.Hazardscaused by hidden blocks in multi-arch tunnel[J].Progress inGeophysics,2010,25(6):2199-2203.
[11]孙淑琴,赵义平,林君,等.用地面核磁共振方法评估含水层涌水量的实例[J].地球物理学进展,2009,23(4):1317-1321.Sun Shu-qin,Zhao Yi-ping,Lin Jun etc.With the nuclearmagnetic resonance method evaluate aquifer waterinflow ofexamples[J].Progress in Geophysics,2009,23(4):1317-1321.
[12]邓洪亮,谢向文,郭玉松.南水北调西线隧道中隐伏断层超前预报研究[J].地球物理学进展,2007,45(6):1002-1006.The study of geological forecast to deeply buried tunnel faultin south-north water transfer west route project[J].Progressin Geophysics,2007,45(6):1002-1006.
[13]孙英勋.CSAMT法在高速公路长大深埋隧道勘察中的应用研究[J].地球物理学进展,2005,44(4):1365-1369.SUN Ying-xun.Application of CSAMT electro magneticimage system in survey of deeply-buried long tunnels forexpressways[J].Progress in Geophysics,2005,44(4):1365-1369.
[14]公路隧道设计规范[S].JTG D70-2006,北京:人民交通出版社,2006.Highway tunnel design specification[S].JTG D70-2006,Beijing:peoples traffic press,2006.
[15]铁路隧道设计规范[S].TB10003-2005,北京:中国铁道出版社,2005.Railway tunnel design specification[S].TB 10003-2005,Beijing:China railway press,2005.
[16]刘招伟,何满潮,肖红渠.浅埋大跨连拱隧道施工中变形的监测与控制措施[J].岩土工程学报,2003,25(3):339-343.Liu Zhao-wei,He Man-chao,Xiao Hong-qu.Large spanmultiple-arch tunnel construction of monitoring and controlmeasures of deformation[J].Journal of geotechnicalengineering,2000,871(3):339-343.
[17]周玉宏,赵燕明,程崇国.偏压连拱隧道施工过程的优化研究[J].岩石力学与工程学报,2002,21(5):679-684.Zhou Yu-hong,Zhao Yan-ming,Cheng Chong-guo.Biasmultiple-arch tunnel construction process optimization[J].Journal of rock mechanics and engineering journal,2002,21(5):63-684.
[18]靳晓光,刘伟,郑学贵,等.小净距偏压公路隧道开挖顺序优化[J].公路交通科技,2005,22(08).Jin Xiao-guang,Liu Wei,Zheng Xue-gui etc.Small intervalDE highway tunnel excavation sequence optimization[J].Journal of highway traffic technology,2005,22(8).
[19]Katauhoko Arai etal.Estimation of Nonlinear Constitu-tiveParameters based on Monitored Movement of Subsiol underConsolidatcon.Soils and Foundation.Vol.27,No.1,1987.
[20]Vafacian M.Analysis of soil behavior during excavation ofshallow tunnel[J].Geotechnical engineering,1991,22920:257-267.
[21]郑颖人,赵尚毅,邓楚键,等.有限元极限分析法发展及其在岩土工程中的应用[J].中国工程科学2006,8(12):1120-1128.Zheng Ying-ren,Zhao Shang-yi,Deng Chu-jian,etc.Finiteelement limit analysis method development and application ingeotechnical engineering[J].China Engineering Science,2006,8(12):1120-1128.
[22]赵尚毅,时卫民,郑颖人.边坡稳定性分析的有限元法[J].地下空间,2001,21(5):450-454.Zhao Shang-yi,Shi Wei-min,Zheng Ying-ren.Slope stabilityanalysis of finite element method[J].Underground space,2001,21(5):450-454.
[23]徐干成郑颖人,等.岩石工程中屈服准则应用的研究[J].岩土工程学报,1990,12(2):93-99.Xu Gan-cheng Zheng Ying-ren etc.Rock engineeringapplications of yield criterion[J].Journal of GeotechnicalEngineering,1990,12(2)93-99.
[24]Holmeberg and P Persson.Design of tunnel perimeter blastholepatterns to prevent to prevent rock damage[J].Institution ofMining&Metallurgy,1980,89(6):27-32.
[25]Hoek.E.Big tunnels in bad rock.Journal of Geotechnicaland Geoenvironmental Engineering,vo1 27,n9,September,2001,726-740.
[26]刘元雪,蒋树屏,等.黄土连拱隧道两主洞开挖面合理间距研究[J].现代隧道技术,2006,43(03):6-10.LiuYuan-xue,JiangShuBing etc.multi-arch loess tunnel.Bothmain hole excavated plane reasonable spacing[J].Journal ofmodern technology tunnel,2006,43(03):6-10.