引文
[1]ZHANG Zi min,LI Qi.The Current Situation,Issues andTrends of Evacuation Modeling in Emergency[J].ChinaSafety Science Journal,2008,18(10):120-126.(张子民,李琦.应急撤离建模研究的现状、问题与发展趋势[J].中国安全科学学报,2008,18(10):120-126.)
[2]MI NCI ARDI R,SACILE R,SICCARDI F,et al.Opti malPlanning of a Weather Radar Network[J].Journal ofAt mospheric and Oceanic Technology,2003,20(9),1251-1263.
[3]TOREGAS C,SWAIN R,REVELLE C,et al.The Locationof Emergency Service Facilities[J].Operations Research,1971,19(6),1363-1373.
[4]PLANE D R,HENDRICK T E.Mathematical Programmingand the Location of Fire Companies for the Denver FireDepart ment[J].Operations Research,1977,25(4),563-578.
[5]GLEASON J M.A Set Covering Approach to Bus StopLocation[J].Omega,1975,3(5),605-608.
[6]ZHOU Tianying,JI AN Furen.Study on Establishing theSupporting Systemfor Location of the Urgent Refuge[J].Research of Soil and Water Conservation,2001,18(1):17-24.(周天颖,简甫任.紧急避灾场所区位决策支持系统建立之研究[J].水土保持研究,2001,18(1):17-24.)
[7]XIE Shunping,FENG Xuezhi,LU Wei.Algorithm forConstructing Voronoi Area Diagram Based on RoadNetwork Analysis[J].Acta Geodaetica et CartographicaSinica,2010,39(1):88-94(谢顺平,冯学智,鲁伟.基于道路网络分析的Voronoi面域图构建算法[J].测绘学报,2010,39(1):88-94.)
[8]HUANG B,LI U N.Bi-level Programming Approach toOpti mizing a Logistic Distribution Network with BalancingRequirements[J].Transportation Research Record:Journal of the Transportation Research Board,2004,18(9),188-197.
[9]UPCHURCH C,KUBY M,ZOLDAK M,et al.Using GISto Generate Mutually Exclusive Service Areas LinkingTravel on and off a Network[J].Journal of TransportGeography,2004,12(1),23-33.
[10]BOYLE P J,DUNN C E.Redefinition of EnumerationDistrict Cancroids:A Test of Their Accuracy UsingThiessen Polygons[J].Environmental Planning A,1991,23(8):1111-1119.
[11]WANGJian,HU Xiaowei,TONG Jingjing,et al.RoutePlanning of Regional Emergency Evacuation Based onLane Modeling[J].Journal of Traffic and TransportationEngineering,2010,10(2):82-87.(王健,胡晓伟,佟晶晶,等.基于车道建模的区域应急疏散路径规划[J].交通运输工程学报,2010,10(2):82-87.)
[12]TAN Manchun,TANG Songan,XU Jianmin.DynamicDiscrete Traffic Model of Freeway with Multiple Lanes[J].China Journal of Highway and Transport,2002,15(2):91-94.(谭满春,唐松安,徐建闽.多车道高速公路的动态离散交通流模型[J].中国公路学报,2002,15(2):91-94.)
[13]CHENJun,ZHAO Renliang.Spatial Relationsin GIS:ASurvey onIts Key Issues and Research Progress[J].ActaGeodaetica et Cartographica Sinica,1999,28(2):97-102.(陈军,赵仁亮.GIS空间关系的基本问题与研究进展[J].测绘学报,1999,28(2):97-102.)
[14]LI Gang,MA Donghui,SUJingyu,et al.MultiplicativelyWeighted Voronoi Diagrams for Responsibility SpaceRegionalization of Urban Earthquake Emergency Shelters[J].Building Science,2006,22(3):55-59.(李刚,马东辉,苏经宇,等.基于加权Voronoi图的城市地震应急避难场所责任区的划分[J].建筑科学,2006,22(3):55-59.)
[15]SU Youpo,LI U Ruixing.Planning Principles andOutlines of Urban Earthquake Shelters[J].Journal ofCatastrophology,2004,19(1):87-92.(苏幼坡,刘瑞兴.城市地震避难所的规划原则与要点[J].灾害学,2004,19(l):87-92.)
[16]YANG Wenbin,HAN Shi wen,ZHANG Jingjun,et al.Planning Construction of Earthquake Emergency Sheltersand Urban Disaster Reduction[J].Journal of NaturalDisasters,2004,13(1):126-132.(杨文斌,韩世文,张敬军,等.地震应急避灾场所的规划建设与城市防灾[J].自然灾害学报,2004,13(l):126-132.)
[17]YAO Qinglin.On Some Questions of Opti mally SelectingRefuges for Large Earthquake[J].Journal of SeismologicalResearch,1997,19(3):244-248.(姚清林.关于优选城市地震避灾场地的某些问题[J].地震研究,1997,19(3):244-248.)
[18]AURENHAMMER F.Voronoi Diagrams——a Survey ofa Fundamental Geometric Data Structure[J].ACMComputingSurvey,1991,23(3):345-405.