引文
[1]陈健,张崇德.急倾斜特厚煤层综采放顶煤地质影响因素及应对措施[J].煤炭技术,2004,23(9):90-91.Chen Jian,Zhang Chongde.Geology influence factors and solutions of full-mechanized caving mining steeply-inclined and extremely-thick coal seam[J].Coal Technology,2004,23(9):90-91.
[2]蓝航,齐庆新,潘俊锋,等.我国煤矿冲击地压特点及防治技术分析[J].煤炭科学技术,2011,39(1):11-15.Lan Hang,Qi Qingxin,Pan Junfeng,et al.Analysis on features as well as prevention and control technology of mine strata pressure bumping in China[J].Coal Science and Technology,2011,39(1):11-15.
[3]宋元文.急倾斜水平分段放顶煤开采老顶来压规律探讨[J].煤炭科学技术,1997,25(12):35-38.Song Yuanwen.Basic roof loading rule of full-mechanized caving mining steeply-inclined and extremely-thick coal seam[J].Coal Science and Technology,1997,25(12):35-38.
[4]石平五,高召宁.急斜特厚煤层开采围岩与覆盖层破坏规律[J].煤炭学报,2003,28(1):13-16.Shi Pingwu,Gao Zhaoning.The failure laws of surrounding rocks and overlying bed in the steep special thickness seam mining[J].Journal of China Coal Society,2003,28(1):13-16.
[5]邵小平,石平五.急斜放顶煤开采围岩破坏规律立体模拟研究[J].采矿与安全工程学报,2006,23(1):107-110.Shao Xiaoping,Shi Pingwu.Solid simulation study of failure law of surrounding rock in mining steep seams[J].Journal of Mining&Safety Engineering,2006,23(1):107-110.
[6]邵小平,石平五,贺桂成.急斜放顶煤开采顶板卸载拱结构分析[J].北京科技大学学报,2007,29(5):447-451.Shao Xiaoping,Shi Pingwu,He Guicheng.Analysis on unloaded arch structure of roof in mining steep seams using horizontal section topcoal caving[J].Journal of University of Science and Technology Beijing,2007,29(5):447-451.
[7]邵小平,石平五.急斜煤层大段高开采采空场围岩稳定性[J].辽宁工程技术大学学报(自然科学版),2010,29(3):353-356.Shao Xiaoping,Shi Pingwu.Stability research of surrounding rock at gob area using large section mining in steep seam[J].Journal of Liaoning Technical University(Natural Science),2010,29(3):353-356.
[8]高召宁,石平五.急斜特厚煤层水平分段放顶煤安全开采的研究[J].矿山压力与顶板管理,2005(3):18-20.Gao Zhaoning,Shi Pingwu.Research on safe mining steep special thick seam using horizontal section top-coal caving[J].Underground Pressure and Roof Control,2005(3):18-20.
[9]李建民,章之燕.急倾斜厚煤层水平分段放顶煤开采顶板和顶煤运移规律研究[J].煤矿开采,2006,11(2):49-51.Li Jianmin,Zhang Zhiyan.Movement rule of top roof and top coal in horizontal section caving mining in deeply inclined thick coal seam[J].Coal Mining Technology,2006,11(2):49-51.
[10]孟宪锐,李巍栋,毛怀勇,等.急斜难采煤层水平分层放顶煤开采矿压研究[J].矿山压力与顶板管理,2005(4):86-88.Meng Xianrui,Li Weidong,Mao Huaiyong,et al.Research on underground pressure in mining steeply-inclined seam using horizontal slicing method[J].Underground Pressure and Roof Control,2005(4):86-88.
[11]张嘉凡,石平五,张慧梅.急斜煤层初次破断后基本顶稳定性分析[J].煤炭学报,2009,34(9):1160-1164.Zhang Jiafan,Shi Pingwu,Zhang Huimei.Stability analysis of basic roof after first destruction in the steep seam[J].Journal of China Coal Society,2009,34(9):1160-1164.
[12]张嘉凡,石平五,邵小平.急斜近距煤层联合开采覆岩运移规律模拟[J].采矿与安全工程学报,2009,26(2):234-238.Zhang Jiafan,Shi Pingwu,Shao Xiaoping.Simulation research on movement rules of overlying strata for united mining in steep and close seams[J].Journal of Mining&Safety Engineering,2009,26(2):234-238.
[13]张立杰,柴鑫,来兴平,等.急斜煤层EDZ围岩动态演化规律2D-BLOCK数值追踪模拟[J].西安科技大学学报,2008,28(4):614-617.Zhang Lijie,Chai Xin,Lai Xingping,et al.2D Block based dynamic evolutionary tracking simulation to rockmass fracture upon heavy and steep seam in EDZ[J].Journal of Xi’an University of Science and Technology,2008,28(4):614-617.
[14]赵朔柱.急斜放顶煤工作面的矿压显现和上覆岩层结构[J].矿山压力与顶板管理,1992(1):38-42.Zhao Shuozhu.Underground pressure behavior and overlying strata structure of steeply-inclined top-coal caving face[J].Underground Pressure and Roof Control,1992(1):38-42.
[15]鞠文君,李文洲.急倾斜特厚煤层水平分段开采老顶断裂力学模型[J].煤炭学报,2008,33(6):606-608.Ju Wenjun,Li Wenzhou.Fracture mechanical model of main roof along inclined for fully-mechanized top-coal caving in steep and extra-thick coal seam[J].Journal of China Coal Society,2008,33(6):606-608.
[16]鞠文君,李前,魏东,等.急倾斜特厚煤层水平分层开采矿压特征[J].煤炭学报,2006,31(5):558-561.Ju Wenjun,Li Qian,Wei Dong,et al.Pressure character in caving steep-inclined and extremely thick coal seam with horizontally grouped top-coal drawing mining method[J].Journal of China Coal Society,2006,31(5):558-561.
[17]易永忠,曹建涛,来兴平,等.急斜煤层水平分段综放开采围岩失稳特征分析[J].西安科技大学学报,2009,29(5):505-514.Yi Yongzhong,Cao Jiantao,Lai Xingping,et al.Analysis of instability characteristics of surrounding rock within horizontal section caving face in steep coal seam[J].Journal of Xi’an University of Science and Technology,2009,29(5):505-514.
[18]陈立春.北天山乌鲁木齐转换区构造系晚第四纪活动性[D].北京:中国地震局地质研究所,2011.Chen Lichun.Late quaternary behavior of the active tectonic system in the urmuqi transform region of the north Tianshan[D].Beijing:Institute of Geology,CEA,2011.
[19]李莹甄,沈军,聂晓红,等.乌鲁木齐地区现今构造应力场综合分析[J].地震学报,2011,33(1):15-27.Li Yingzhen,Shen Jun,Nie Xiaohong,et al.Comprehensive analysis on present tectonic stress field in Urumqi region[J].Acta Seismologica Sinica,2011,33(1):15-27.
[20]李宏,谢富仁,王海忠,等.乌鲁木齐市断层附近地应力特征与断层活动性[J].地球物理学报,2012,55(11):3690-3698.Li Hong,Xie Furen,Wang Haizhong,et al.Characteristics of in-situ stress measurements near the fault and fault activity in Urumqi City[J].Chinese Journal of Geophysics,2012,55(11):3690-3698.
[21]齐庆新,李晓璐,赵善坤.煤矿冲击地压应力控制理论与实践[J].煤炭科学技术,2013,41(6):1-5.Qi Qingxin,Li Xiaolu,Zhao Shankun.Theory and practice on stress control of mine pressure bumping[J].Coal Science and Technology,2013,41(6):1-5.
[22]姜福兴,魏全德,姚顺利,等.冲击地压防治关键理论与技术分析[J].煤炭科学技术,2013,41(6):6-9.Jiang Fuxing,Wei Quande,Yao Shunli,et al.Key theory and technical analysis on mine pressure bumping prevention and control[J].Coal Science and Technology,2013,41(6):6-9.