引文
[1]朱海波,林伯香,徐兆涛,等.起伏地表叠前时间偏移处理流程及其应用研究[J].石油物探,2012,51(5):486-492Zhu H B,Lin B X,Xu Z T,et al.Prestack time mi-gration scheme from rugged topography and its ap-plication[J].Geophysical Prospecting for Petrole-um,2012,51(5):486-492
[2]郝军,杨瑞娟,吴靖,等.复杂地表地震资料静校正问题的处理[J].复杂油气藏,2011,4(3):34-37Hao J,Yang R J,Wu J,et al.Processing of staticcorrection problems of seismic data in the complexsurface[J].Complex Hydrocarbon Reservoirs,2011,4(3):34-37
[3]程玖兵,马在田,陶正喜,等.山前带复杂构造成像方法研究[J].石油地球物理勘探,2006,41(5):525-529Cheng J B,Ma Z T,Tao Z X,et al.Imaging study ofpiedmont complex structures[J].Oil GeophysicalProspecting,2006,41(5):525-529
[4]赵改善.我们需要多大和多快的计算机?[J].勘探地球物理进展,2004,27(1):22-28Zhao G S.How big and fast computers can meet ourneeds?[J].Progress in Exploration Geophysics,2004,27(1):22-28
[5]谌艳春,李守济,姚盛,等.高精度三维叠前时间偏移处理技术在四扣地区的应用[J].石油物探,2005,44(4):370-373Chen Y C,Li S J,Yao S,et al.Application of high-precision 3-D pre-stack time migration in Sikou area[J].Geophysical Prospecting for Petroleum,2005,44(4):370-373
[6]齐俊宁,朱敏,吴彦伟,等.海量数据叠前时间偏移方法[J].天然气工业,2008,28(11):46-48Qi J N,Zhu M,Wu Y W,et al.The method of pres-tack time migration in processing enormous data[J].Natural Gas Industry,2008,28(11):46-48
[7]李伟,顾乃杰,刘振宽,等.三维叠前Kirchhoff深度偏移软件在并行计算机上的实现技术[J].计算机工程与应用,2002,20(4):211-214Li W,Gu N J,Liu Z K,et al.3-D pre-stack Kirchhoffdepth migration and its parallel calculation technique[J].Computer Engineering and Applications,2002,20(4):211-214
[8]Bhardwaj D,Yerneni S,Phadke S.Efficient parallelI/O for seismic imaging in a distributed computingenvironment[J].Proceedings of 3rd Conference andExposition on Petroleum Geophysics,2000,105-108
[9]王华忠,蔡杰雄,孔祥宁,等.适于大规模数据的三维Kirchhoff积分法体偏移实现方案[J].地球物理学报,2010,53(7):1699-1709Wang H Z,Cai J X,Kong X N,et al.An implemen-tation of Kirchhoff integral prestack migration forlarge-scale data[J].Oil Geophysical Prospecting,2010,53(7):1699-1709
[10]王华忠,刘少勇,孔祥宁,等.大规模三维地震数据Kirchhoff叠前深度偏移及其并行实现[J].石油地球物理勘探,2012,47(3):404-410Wang H Z,Liu S Y,Kong X N,et al.3D KirchhoffPSDM for large-scale seismic data and its parallelimplementation strategy[J].Oil Geophysical Pros-pecting,2012,47(3):404-410
[11]王霖,晏海华.一种叠前时间偏移并行模式的流水线改进方法[J].微电子学与计算机,2008,25(10):54-57Wang L,Yan H H.Method of improving perform-ance of Kirchhoff prestack time migration parallelpattern through pipelining[J].Microelectronics&Computer,2008,25(10):54-57
[12]Lumley D E,Claerbout J F,Bevc D.Anti-aliasedKirchhoff 3-D migration[J].Expanded Abstracts of64th Annual Internat SEG Mtg,1994,1282-1285
[13]刘洪,刘国锋,李博,等.基于横向导数的走时计算方法及其在叠前时间偏移中的应用[J].石油物探,2009,48(1):3-10Liu H,Liu G F,Li B,et al.The travel time calcula-tion method via lateral derivative of velocity and itsapplication in pre-stack time migration[J].Geophys-ical Prospecting for Petroleum,2009,48(1):3-10
[14]朱海波,方伍宝,孔祥宁,等.扩展的横向变速叠前时间偏移技术[J].石油物探,2009,48(2):153-156Zhu H B,Fang W B,Kong X N,et al.Extended pre-stack time migration for laterally variable velocity[J].Geophysical Prospecting for Petroleum,2009,48(2):153-156