引文
[1]林君.电磁驱动可控震源地震勘探原理及应用[M].北京:科学出版社,2004.Lin Jun,Controlled source electromagnetic driving principleand application of seismic exploration[M].Beijing:SciencePress,2004.
[2]Lin Jun.Development of H igh-Resolution GeoPhysiealInstrumentationfor Engineering and Environmental In-vestigations,InternationalW6rkshoponHigh—Resolution GeoPhysies,1997,Tueson,USA.
[3]张尉.利用小当量人工震源进行区域性深部探测的实验研究[D].浙江大学博士论文,杭州:2008.Zhang Wei,The experiments of using small artifical seismicsource to explore regional deep structure of the earth[D],Univercity of Zhe jiang[Ph.D.thesis],Hangzhou:2008.
[4]W.T.BORNT.A REVIEW OF GEOPH YSICALINSTRUMENTATION[J].GEOPHYSICS,1960,25(1):77-91.
[5]姜弢.基于相控震源的地震波定向方法研究[D].吉林大学博士论文,长春:2006.Jiang Tao.Study on Seismic Beam-forming Method Based onPhased-array Vibrator System[D],University of Jilin[Ph.D.thesis],Changchun:2006.
[6]Seth S.Haines.Design and Application of an ElectromagneticVibrator Seismic Source[J].JEEG,2006,11(1):9-15.
[7]林君,陈祖斌.电磁式大功率浅层地震可控震源系统[P].中国:发明专利,2001.CN01128147,2001.Lin Jun,Chen Zubin.High-power electromagnetic system ofshallow seismic vibrator[P].Chinese Patent:CN01128147.2001.
[8]Denis Mougenot.Land seismic:needs and answers.special topic[J].first break volume 22,February 2004.
[9]林君.地球物理仪器及其发展趋势[J].中国仪器仪表,1995,(5):9-11.Lin Jun.Geophysical instrument and its development trends[J].China Instrumentation,1995,(5):9-11.
[10]孙锋.海洋电磁式可控震源关键技术研究[D].吉林大学博士论文,2009.Sun Feng,Study on Key Technique of Marine Electro-magnetic Vibrator[D],University of Jilin[Ph.D.thesis],2009.
[11]左公宁.陆地电火花震源的特性及其应用[J].勘察科学技术,2003,1(1):55-60.Zuo Gongning,The Propertie’s and Application of The LandElectric Spark Source[J]Site Investigation Science andTechnology,,2003,1(1):55-60.
[12]嵇艳鞠,林君,关珊珊,于生宝,巩源峰.直升机航空TEM中心回线线圈姿态校正的理论研究[J].地球物理学报,2010,Vol.53(1):171-176.Ji Yan-Ju,Lin Jun,Guan Shan-Shan,Yu Sheng-Bao,GongYuan-Feng.Theoretical study of concentric loop coils attitudecorrection in helicopter-borne TEM[J].Chinese J.Geophys.(in Chinese),2010,V53(1):171-176.
[13]朱凯光,林君,韩悦慧,李楠.基于神经网络的时间域直升机电磁数据电导率深度成像[J].地球物理学报,2010Vol.53(3):743-750.Zhu Kaiguang,Lin Jun,Han Yue-Hui,Li Nan.Research onconductivity depth imaging of time domain helicopter-borneelectromagnetic data based on neural network[J].Chinese J.Geophys.(in Chinese),2010,V53(3):743-750.
[14]潘林峰,尚应军,张旭.电火花震源能量传输和释放系统的技术改造与应用[J].石油仪器,2009,23(2):34-38.Pan Linfeng,Shang Yingjun,Zhang xu.Technologicaltransformation of the energy transfer and release system ofthe sparker[J].PI,2009,23(2):34-38.
[15]南文海,丁志淦.可控震源发展中有关问题的探讨[J].物探装备,1999,9(2):26-29.Nan Wenhai,Ding Zhigan.Discussion on the developing ofvibroseis[J].EGP.1999,9(2):26-29.
[16]金念.夯击震源地震勘探关键技术研究[D].吉林大学硕士论文,2006.Jin Nian.Study on the key technology of mini-sosie in seismicprospecting[D].University of Jilin[Master.thesis],2006.
[17]V1BROMETRIC:VIBSIST-20SEISMIC SOURCE OPERA-TING AND MAINTENANCE MANUAL.www.Vibmmetric.com.
[18]王忠仁,高健,耿亮.基于非周期伪随机序列的可控震源信号调制技术[J].吉林大学学报:地球科学版,2009,39(6):1146-1149.Wang Zhong-ren,Gao Jian,Geng Liang.Seismic VibratorSignal Modulating Based on Aperiodic PseudorandomSequence[J].JOURNAL OF JILIN UNIVERSITY(EARTHSCIENCE EDITION),2009,39(6):1146-1149.
[19]J.J.SALLAS.Seismic Vibrator Control and the Down goingP-wave[J].Geophysical Prospecting,1984,49(6):732-740.
[20]葛洪魁,林建民,王宝善,等.编码震源提高地震探测能力的野外实验研究[J].地球物理学报,2006,49(3):864-870.Ge Hong-Kui,Lin Jian-Min,Wang Bao-Shan,et al.A fieldexperiment study of improving the seismic detectability withcoded source[J].Chinese J.Geophys.(in Chinese),2006,49(3):864-870.
[21]蓝加达.可控震源非线性扫描在高分辨率地震采集中的应用[J].石油物探,2008,47(2):208-211.Lan Jiada.Application of vibroseis nonlinear sweep in highresolution seismic data acquisition in S area,Kazakstan[J].GEOPHYSICAL PROSPECTING FOR PETROLEUM,2008,47(2):208-211.
[22]尹昌兰.震源综述[J].中国煤田地质,1989,1(1):79-84.Yi Chang-lan.Vibrator Summary[J].Coal Geology of China,1989,1(1):79-84.
[23]林君.现代地球物理仪器的开发与应用[J].地质装备,2004,5(6):3-7.Lin Jun.Development and Its Applications of MordenGeoscience Instrumentation[J].EQUIPMENT FORGEOTECHNICAL ENGINEERING,2004,5(6):3-7.
[24]Chapman W M L The VIBROSEIS System:A High FrequencyTool[J].SEG,1981,46(12):1657-1666.
[25]Seth S.Haines.Design and Application of an ElectromagneticVibrator Seismic Source[J].JEEG,2006,11(1):9-15.
[26]陈祖斌.电磁式可控震源相位自适应控制及可控震源系统研制[D].吉林大学博士论文,2002.Chen Zubin.Study on Adaptive Control for Electro-dynamicVibroseis Sweeping Phase and the Development of VibroseisMajor[D].University of Jilin[Ph.D.thesis],2002.
[27]张子三.林君.于生宝.陈祖斌.PHV-I可控震源自动控制系统的设计与实现[J].石油化工自动化,2000(6):14-17.Zhang Zi-san,Lin Jun,Yu Sheng-bao,Chen Zu-bin.TheDesign and Implementation of the Automatic Control Systemof PHV-I Portable High-Frequency Vibrator[J].AUTOMATION IN PETRO-CHEMICAL INDUSTRY,2000(6):14-17.
[28]姜弢,林君,相控震源对地震信号信噪比的改善研究[J].地球物理学报,2006,49(6):1819-1825.Jiang Tao,Lin Jun.Boosting signal to noise ratio of seismicsignals using the phased-array vibrator system[J].Chinese J.Geophys.(in Chinese),2006,49(6):1819-1825.
[29]槐永军,武永生.可控震源的相关技术[J].物探装备,2009,19(1):30-32.Huai Yongjun,Wu Yongsheng.Correlation technique ofvibroseis[J].EGP,2009,19(1):30-32.
[30]王俊秋,林君,等.可控震源地震方法在金昌铜镍矿区的应用实验[J].吉林大学学报(自然科学版),2011,41(5):1617-1622.WangJunqiu,LinJun,et al.Experiment and Application ofControlled Vibrator Seismic Method at Jinchang Copper-Nickel Metal Deposit[J].JOURNAL OF JILINUNIVERSITY(NATURAL SCIENCE EDITION),2011,41(5):1617-1622.
[31]陈祖斌,林君,于生宝,张子山.轻便浅层地震可控震源的研制[J].仪器仪表学报,2003,24(3):311-314.Chen Zubin,Lin Jun,Yu Shengbao,Zhang Zishan.TheDevelopment of Portable Shallow Seismic Vibrator[J].CHINESE JOURNAL OF SCIENTIFIC INSTRUMENT,2003,24(3):311-314.
[32]Zubin C,Jun L.Design for vibrator field experiment based-on Vibrator-Earth system[J].Jounrnal of GeoscienceResearch in Northeast Asia,2000,3(1):107-113.
[33]曾鸾,李志勇,高凤珍.大吨位可控震源的应用及效果分析[J].石油物探,2002,41(3):327-333.Zeng Ying,Li Zhiyong,Gao,Fengzhen.Application and effectof the large-tonnage vibroseis[J].GEOPHYSICALPROSPECTING FOR PETROLEUM,2002,41(3):327-333.
[34]邓东,李彩霞.I/O AHV-Ⅳ可控震源液压系统工作原理[J].物探装备,2004,14(3):217-221.Deng Dong,Li Caixia.Working principle of I/O AHV-Ⅳvibroseis hydraulic system[J].EGP,2004,14(3):217-221.
[35]赵永林.NOMAD65可控震源驱动系统介绍[J].物探装备,2006,16(4):249-251.Zhao Yonglin.Introduction of drive system in NOMAD65vibrator[J].EGP,2006,16(4):249-251.
[36]刘长胜,林君.海底表面磁源瞬变电磁响应建模及海水影响分析[J].地球物理学报,2006,49(6):1891-1898.Liu Chang Sheng,Lin Jun.Transient electromagneticresponse modeling of magnetic source on seafloor and theanalysis of seawater effect[J].Chinese J.Geophys.(inChinese),2006,49(6):1891-1898.
[37]Walker D.Harmonic resonance structure and chaotic dynamics inthe Earth-Vibrator system.Geophysical Prospecting,1995,43(4):487-507.
[38]陶知非.世纪之交论可控震源的发展与变化[J].物探装备,2000,10(1):1-6.TaoZhifei.Discussion on development of vibroseis in theexchange of century[J].EGP,2000,10(1):1-6.
[39]刘洪斌,陈如恒.地震勘探震源的历史与发展[J].石油机械,1997,25(8):43-52.Liu Hong-bin,Chen Ru-heng.Development Of seismic sourcefor geophysical exploration[J].China Petroleum Machinery,1997,25(8):43-52.
[40]Gurbuz B M.Upsweep signals with High frequency attenuationand their use in the construction of vibroseis syntheticseismograms[J].Geophysical Prospecting,1982,30(3):432-443.
[41]赵贺强,等.国产可控及源液压系统中气泡油问题的解决[J].物探装备,2001,11(2):111-114,119.Zhao Heqiang,et al.Solution for the problem of hubble oll inChinese-made vibrator hydraulic system[J].EGP,2001,11(2):111-114,119.
[42]CLAUDIO BAGAINI.Low-frequency vibroseis data withmaximum displacement sweeps[J].The Leading Edge,May,2008,pp.582-591.
[43]Wang H T,Zhuang S T,Xue B,et al.Precisely and activelyseismic monitoring[J].Chinese J.Geophys.(in Chinese),2009,52(7):1808-1815.
[44]李军,郝天珧,赵百民.地震与测井数据综合预测裂缝发育带[J].地球物理学进展,2006,21(1):179-183.LI Jun,HAO Tian-yao,ZHAO Bai-min.Syntheticpredication of favorable fracture zone from seismic and logdata[J].Progress in Geophysics(in Chinese),2006,21(1):179-183.
[45]姜弢,林君,陈祖斌.延时参数对地震信号信噪比的改善[J].地球物理学报,2009,52(6):1651-1656.Jiang T,Lin J,Chen Z B.SNR improvement of seismicsignals with different time delays[J].Chinese J.Geophys.(in Chinese),2009,52(6):1651-1656.
[46]陆其鹄,彭克中,易碧金.我国地球物理仪器的发展[J].地球物理学进展,2007,22(4):1332-1337.Lu Q H,Peng K Z,Yi B J.The development of geophysicalinstrumentation in china[J].Progress in Geophysics,2007,22(4):1332-1337.
[47]Michael E.Kalinski.Effect of Vibroseis Arrays on GroundVibrations:A Numerical Study[J].JEEG,2007,12(3):281-287.
[48]M.van der Veen,H.A.Buness,F.Bilker and A.G.Green.Field Comparison of High-frequency Seismic Sourcesfor Imaging Shallow(10-250m)Structures[J].JEEG,2000,5(2):39-56.
[49]林君,王言章,刘长胜.高端地球物理仪器研究及我国产业化现状[J].仪器仪表学报,2010,31(8)(增刊):174-180.Lin J,Wang Y Z,Liu C S.The research progress andindustrialization status in our country of High-technologygeophysical instrumentation[J].Chinese journal of scientificinstrument,2010,31(8)(Supplement):174-180.
[50]庄娟,张佰军,林君.可控震源震动器平板力的传输分析[J]实验技术与实验机,1996,36(3、4):137-138.Zhuang Juan,Zhang Baijun,Lin Jun,Vibrators vibrator forceplate analysis of transmission[J].Test Technology andTesting Machine,1996,36(3、4):137-138.
[51]Chen Zubin.Teng Jiwen.Lin Jun.Zhang Linhang.JiangZhongjin Nonlinear analysis on the coupling process ofelectromagnetic vibrator and earth[J].Science in China(SeriesD:Earth Sciences),2005,48(8):1175-1182.
[52]张子山,林君,于生宝.可控震源线性扫描的优化设计[J].石油仪器,1998,12(3):1-5.Zhang Zishan,LinJun,Yu Shengbao.Vibroseis Optimaldesign of linear sweep[J].Petroleum Instruments,998,12(3):1-5.
[53]孙明,林君,陈祖斌,于生宝.基于DDS技术的chirp信号产生系统[J].佛山科学技术学院学报(自然科学版),2004,22(4):22-24.Sun Ming,LinJun,ChenZubin,Yu Sheng bao.The producingsystem of chirp signal based on DDS[J].JOURNAL OFFOSHAN UNIVERSITY(NATURAL SCIENCEEDITION),2004,22(4):22-24.
[54]Lin Jun.GeoPhysieal Instrumentation in China:A Re-view ofHigher Edueation and Researeh[J].The Leading Edge,1997,16(7):30-33.