引文
[1]钱鸣高,缪协兴.采场上覆岩层结构的形态与受力分析[J].岩石力学与工程学报,1995,14(2):97–106.(QIAN Ming-gao,MIAO Xie-xing.Theoretical analysis on the structure form and stability of overlying strata in longwall mining[J].Chinese Journal of Rock Mechanics and Engineering,1995,14(2):97–106.(in Chinese))
[2]王家臣.关于综放开采技术安全问题的几点认识[J].中国安全生产科学技术,2005,5(1):21–25.(WANG Jia-chen.Some opinions on the safety production of the longwall top-coal caving[J].China Occupational Safety and Health Management System Certification,2005,5(1):21–25.(in Chinese))
[3]姜福兴,宋振祺,宋扬.老顶的基本结构形式[J].岩石力学与工程学报,1993,12(4):366–379.(JIANG Fu-xing,SONG Zhen-qi,SONG Yang.Basic structure forms of main roof[J].Chinese Journal of Rock Mechanics and Engineering,1993,12(4):366–379.(in Chinese))
[4]吴健,张勇.综放采场支架——围岩关系的新概念[J].煤炭学报,2001,26(4):350–355.(WU Jian,ZHANG Yong.The new concept of relationship between support and surrounding rockin longwall top coal caving faces[J].Journal of Chinese Coal Society,1993,12(4):366–379.(in Chinese))
[5]曹胜根,钱鸣高,刘长友,等.采场支架——围岩关系新研究[J].煤炭学报,1998,23(6):575–579.(CAO Sheng-gen,QIAN Ming-gao,LIU Chang-you,et al.New research about support and surrounding rock relationship in working face[J].Journal of China Coal Society,1998,23(6):575–579.(in Chinese))
[6]姜福兴.放顶煤采场的顶板结构及其支架围岩关系探讨[J].世界煤炭技术,1994,12:32–34.(JIANG Fu-xing.A study on microseismic monitoring of rock burst in coal mine[J].Chinese Journal of World Coal Technology,1994,12:32–34.(in Chinese))
[7]杨淑华,姜福兴.综采放顶煤支架受力与顶板结构的关系探讨[J].岩石力学与工程学报,1999,18(3):287–290.(YANG Shu-hua,.JIANG Fu-xing,Research on the relationship between sublevel caving support load and roof structure[J].Chinese Journal of Geophysics,1999,18(3):287–290.(in Chinese))
[8]史红,姜福兴.综放采场初压阶段顶板稳定性与顶煤放出率关系探讨[J].岩土工程学报,2005,27(4):414–417.(SHI Hong,JIANG Fu-xing.Study on relationship between roof stability and recovery ratio of top coal at first weight period in fully-mechanized sublevel caving face[J].Chinese Jounal of Geotechnical Engineering,2005,27(4):414–417.(in Chinese))
[9]史红,姜福兴,汪华君.综放采场周期来压阶段顶板稳定性与顶煤放出率关系探讨[J].岩石力学与工程学报,2005,24(23):4233–4238.(SHI Hong,JIANG Fu-xing.Study on relationship between roof stability ratio during cyclic weighting in fully-mechanized sublevel caving face[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(23):4233–4238.(in Chinese))
[10]缪协兴,钱鸣高.综放采场围岩——支架整体力学模型及分析[J].煤,1998,7(6):1–13.(MIAO Xie-xing,QIAN Ming-gao.The interger mechanical model of support and strata in fully-mechanized sublevel caving face[J].China Journal of Coal,1998,7(6):1–13.(in Chinese))
[11]毛德兵,康立军.综放开采支架阻力不唯一性原因分析[J].煤炭科学技术,2003,31(11):29–31.(MAO De-bing,KANG Li-jun.Reasons analysis of different working resistances of top coal caving power supports in the same seam[J].Coal Science and Technology,2003,31(11):29–31.(in Chinese))
[12]高明仕,窦林名,张农,等.岩土介质中冲击震动波传播规律的微震试验研究[J].岩石力学与工程学报,2007,26(7):1365–1371.(GAO Ming-shi,DOU Lin-ming,ZHANG Nong,et al.Experiment study on earthquake tremor for transmitting law of rockburst in geomaterials[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(7):1365–1371.(in Chinese))
[13]潘一山,赵扬锋,官福海,等.矿震监测定位系统的研究及应用[J].岩石力学与工程学报,2007,26(5):1002–1011.(PAN Yi-shen,ZHAO Yang-feng,GUAN Fu-hai,et al.Study on rockburst monitoring and orientation system and its application[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(5):1002–1011.(in Chinese))
[14]唐礼忠,杨承祥,潘长良.大规模深井开采微震监测系统站网布置优化[J].岩石力学与工程学报,2006,25(10):2036–2042.(TANG Li-zhong,YANG Cheng-xiang,PAN Chang-liang.Optimization of microseismic monitoring network for large-scale deep well mining[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(10):2036–2042.in Chinese))
[15]李庶林,尹贤刚,郑文达,等.凡口铅锌矿多通道微震监测系统及其应用研究[J].岩石力学与工程学报,2005,24(12):2048–2053.(LI Shu-lin,YIN Xian-gang,ZHENG Wen-da,et al.Research on multi-channel microseismic monitoring system and its application to Fankou lead-zinc mine[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(12):2048–2053.(in Chinese))
[16]杨天鸿,唐春安,谭志宏,等.岩体破坏突水模型研究现状及突水预测预报研究发展趋势[J].岩石力学与工程学报,2007,26(2):268–277.(YANG Tian-hong,TANG Chun-an,TAN Zhi-hong,et al.State of the art of inrush models in rock mass failure and developing trend for prediction and forecast of ground water inrush[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(2):268–277.(in Chinese))
[17]CALVEZ Le,TANNER J H.Using induced microseismicity to monitor hydraulic fracture treatment:A tool to improve completion techniques and reservoir management[C]//SPE Eastern Regional Meeting 2006:Revitalizing Appalachia,2006:234–242.
[18]KAISER P,FORTIER.Contribution to the valuation micro-seismic monitoring data recorded from treatment well results based on 20 hydro-fracturing jobs recorded from treatment well[C]//11th ADIPEC:Abu Dhabi International Petroleum Exhibition and Conference-Conference Proceedings,2004:343–349.
[19]姜福兴,杨淑华,成云海,等.煤矿冲击地压的微地震监测研究[J].地球物理学报,2006,49(5):1511–1516.(JIANG Fu-xing,YANG Shu-hua,CHENG Yun-hai,et al.A study on microseismic monitoring of rock burst in coal mine[J].Chinese Journal of Geophysics,2006,49(5):1511–1516.(in Chinese))
[20]姜福兴,XUN Luo,杨淑华.采场覆岩空间破裂与采动应力场的微震探测研究[J].岩土工程学报,2003,25(1):23–25.(JIANG Fu-xing,XUN Luo,YANG Shu-hua.Microseismic monitoring study on spatial structure of overlying strata and mining pressure field in longwall face[J].Chinese Journal of Geotechnical Engineering,2003,25(1):23–25.(in Chinese))
[21]LUO X,HATHERLY P.Understanding of high gas emissions at Appin Colliery through microseismic monitoring[C]//Proc Int Mining Tech'98 Symp Chingqing China,1998:74–79.