引文
[1]GEIGER D H.The design and construction of two cabledomes for the Korean Olympics[C]∥Proceeding ofIASS-ASCE Osaka,1986:265-272.
[2]GEIGER D H,CAMPBELL D,CHEN D,et al.Designdetails of an elliptical cable dome and a large span cabledome under construction in the United States[C]∥Pro-ceedings of the 1st Oleg Kerensky Memorial Conference,1988:14-17.
[3]LEVY M P.The Georgia dome and beyond achievinglight weight-long span structures[C]∥Proceedings ofIASS-ASCE International Symposium Atlanta,1994:560-562.
[4]尹思明,陆赐麟.索穹顶结构体系发展的回顾与展望(上)[J].工业建筑,2003,33(6):59-61.YIN Si-ming,LU Ci-lin.Review and outlook of devel-opment of cable dome system[J].Industrial Construc-tion,2003,33(6):59-61.
[5]史秋侠,朱智峰,裴敬.无锡太和国际高科技园区科技交流中心钢屋盖索穹顶结构设计[J].建筑结构,2009,39(S):144-148.SHI Qiu-xia,ZHU Zhi-feng,PEI Jing.Cable dome de-sign in the steel structure of international high-tech gar-den in Taihu lake in Wuxi city[J].Building Structure,2009,39(S):144-148.
[6]洪国松,黄利顺,孙锋,等.伊金霍洛旗体育中心大型索穹顶施工技术[J].建筑技术,2011,42(11):1012-1014.HONG Guo-song,HUANG Li-shun,SUN Feng,et al.Construction technique for large cable dome of Ejin Ho-RO Banner sports center[J].Architecture Technology,2011,42(11):1012-1014.
[7]薛素铎,刘伟.劲性支撑穹顶结构[P].中国:201010199154,2010-10-20.
[8]董石麟,罗尧治,赵阳.大跨度空间结构的工程实践与学科发展[J].空间结构,2005,11(4):3-10.DONG Shi-lin,LUO Yao-zhi.ZHAO Yang.Practicalapplication and research advances of long-span structures[J].Spatial Structures,2005,11(4):3-10.
[9]钱若军.张拉结构形状判定述评[J].河海大学科技情报,1990,10(3):44-58.QIAN Ruo-jun.Review of the shape of tensioned struc-ture determination[J].Hohai University Science andTechnology Information,1990,10(3):44-58.
[10]邓华,李本悦,姜群峰.关于索杆张力结构形态问题的认识和讨论[J].空间结构,2003,9(4):39-46.DENG Hua,LI Ben-yue,JIANG Qun-feng.Comprehension and discussion on the form of cable-strut tensile structures[J].Spatial Structures,2003,9(4):39-46.
[11]林寿,杨嗣信.钢结构工程[M].北京:中国建筑工业出版社,2009.
[12]袁行飞,董石麟.索穹顶结构施工控制反分析[J].建筑结构学报,2001,22(2):75-80.YUAN Xing-fei,DONG Shi-lin.Inverse analysis ofconstruction process of cable dome[J].Journal ofBuilding Structures,2001,22(2):75-80.
[13]罗尧治,沈雁彬.索穹顶结构初始状态确定与成形过程分析[J].浙江大学学报(自然科学版),2004,38(19):1321-1327.LUO Yao-zhi,SHEN Yan-bin.Initial configurationdetermination of cable dome structure and analysis ofit’s configuration process[J].Journal of Zhejiang Uni-versity(Engineering Science),2004,38(19):1321-1327.
[14]沈祖炎,张立新.基于非线性有限元的索穹顶施工模拟分析[J].计算力学学报,2002,19(4):466-471.SHEN Zu-yan,ZHANG Li-xin.Simulation of erectionprocedures of cable domes based on nonlinear FEM[J].Chinese Journal of Computational Mechanics,2002,19(4):466-471.
[15]黄呈伟,陶燕,罗小青,等.索穹顶的施工张拉及其模拟计算[J].昆明理工大学学报,2000,25(1):15-18.HUANG Cheng-wei,TAO Yan,LUO Xiao-qing,etal.Simulation of construction process for cable dome[J].Journal of Kunming University of Science andTechnology,2000,25(1):15-18.
[16]陈联盟,董石麟,袁行飞.索穹顶结构施工成形理论分析和试验研究[J].土木工程学报,2006,39(11):33-36.CHEN Lian-meng,DONG Shi-lin,YUAN Xing-fei.Theoretical and experimental study on the constructionof cable domes[J].China Civil Engineering Journal,2006,39(11):33-36.
[17]张建华,张毅刚.索穹顶结构施工全过程分析[J].武汉理工大学学报,2008,30(4):91-94.ZHANG Jian-hua,ZHANG Yi-gang.Constructionprocess analysis of cable dome[J].Journal of WuhanUniversity of Technology,2008,30(4):91-94.
[18]唐建民,沈祖炎.圆形平面轴对称索穹顶结构的施工过程跟踪计算[J].土木工程学报,1998,31(5):24-32.TANG Jian-min,SHEN Zu-yan.The research of com-putation method of construction process simulation foraxial symmetric cable domes with circular plane[J].China Civil Engineering Journal,1998,31(5):24-32.
[19]董石麟,袁行飞,赵宝军,等.索穹顶结构多种预应力张拉施工方法的全过程分析[J].空间结构,2007,13(1):3-14.DONG Shi-lin,YUAN Xing-fei,ZHAO Bao-jun,etal.Construction analysis of cable dome structures pre-tensioned by different schemes[J].Spatial Structures,2007,13(1):3-14.
[20]蔡丽,钱宏亮.倾斜撑杆式索穹顶结构节点及张拉模拟[J].低温建筑技术,2007,(6):50-52.CAI Li,QIAN Hong-liang.Design of joints and simu-lation of tension of inclined strut system of suspendeddome[J].Low Temperature Architecture Technology,2007,(6):50-52.
[21]卓新,王苗夫,董石麟.逐层双环肋环型索穹顶结构与施工成形方法[P].中国:200910153530,2009-9-30.
[22]张博琨,刘晚成.自平衡预应力网壳-索穹顶组合结构的设计与分析[J].沈阳建筑大学学报(自然科学版),2010,26(3):452-457.ZHANG Bo-kun,LIU Wan-cheng.Design and analysisof hybridized structure composed of self-balance pres-tressed latticed shell and cable dome[J].Journal of She-nyang Jianzhu University(Natural Science),2010,26(3):452-457.
[23]吕晶,徐国彬,王月栋.劲柔索张拉穹顶抗火反应非线性有限元分析[J].中国安全科学学报,2003,13(12):63-67.LV Jing,XU Guo-bin,WANG Yue-dong.Nonlinearfinite element analysis of tension-compression cabledome against fire[J].China Safety Science Journal,2003,13(12):63-67.
[24]祁海珅.工程用高强度钢拉杆的研制与应用[J].工业建筑,2005,35(S1):359-361.QI Hai-shen.The manufacture and application of highstrength steel tie rod for engineering[J].IndustrialConstruction,2005,35(S1):359-361.
[25]杨建国,叶建国,祁海珅,等.高强度建筑钢拉杆的应用与研究[J].钢结构,2005,20(5):26-28.YANG Jiang-guo,YE Jian-guo,QI Hai-shen,et al.Technical application and investigation of the highstrength constructional steel tie rod[J].Steel Con-struction,2005,20(5):26-28.
[26]郭正兴,罗斌.大跨空间钢结构预应力施工技术研究与应用[J].施工技术,2011,40(13):101-108.GUO Zheng-xing,LUO Bin.Research and applicationof long-span space steel structure prestress construc-tion technology[J].Construction Technology,2011,40(13):101-108.
[27]周岱.斜拉网格结构的非线性静力、动力和地震响应分析[D].杭州:浙江大学,1997.ZHOU Dai.Analysis of the Nonlinear Static Force,Dynamic and Seismic Response of the Cable-stayedSpatial Latticed Structures[D].Hangzhou:Zhejiang U-niversity,1997.
[28]PELLEGRINO S,CALLADINE C R.Matrix analysisof statically and kinematically indeterminate frame-works[J].International Journal of Solids and Struc-tures,1986,22(4):409-428.
[29]PELLEGRINO S.Analysis of prestressed mechanisms[J].International Journal of Solids and Structures,1990,26(12):1329-1350.