引文
[1]谢强,张勇,李杰.华东电网500kV任上5237线飑线风致倒塔事故调查分析[J].电网技术,2006,30(10):59-63.Xie Qiang,Zhang Yong,Li Jie.Investigation on tower collapses of500kV Renshang5237transmission line caused by downburst[J].Power System Technology,2006,30(10):59-63(in Chinese).
[2]王洪,柳亦兵,董玉明,等.基于短期振动测量数据的线路振动状态评估方法[J].电网技术,2008,32(12):13-16.Wang Hong,Liu Yibing,Dong Yuming,et al.A method to evaluate vibration state and lifetime of overhead transmission lines based ononsite short-term measured data of aeolian vibration[J].Power System Technology,2008,32(12):13-16(in Chinese).
[3]李正良,肖正直,韩枫,等.1000kV汉江大跨越特高压输电塔线体系气动弹性模型的设计与风洞试验[J].电网技术,2008,32(5):2-5.Li Zhengliang,Xiao Zhengzhi,Han Feng,et al.Aeroelastic model design and wind tunnel tests of1000kv Hanjiang long span transmission line system[J].Power System Technology,2008,32(5):2-5(in Chinese).
[4]王炎.大跨越输电铁塔随机风场的数值模拟[J].国外建材科技,2007,28(4):111-132.Wang Yan.Simulation of stochastic wind field on long-span transmission tower[J].Materials and Technology of Overseas,2007,28(4):111-132(in Chinese).
[5]张冬兵,梁枢果,韩银全,等.高层建筑风场的脉动风速时程模拟[J].兰州理工大学学报,2008,34(3):128-130.Zhang Dongbing,Liang Shuguo,Han Yinquan,et al.Simulation of time history of turbulent wind speed in wind field around high-rises[J].Journal of Lanzhou University of Technology,2008,34(3):128-130(in Chinese).
[6]张勇.输电线路风灾防御的现状与对策[J].华东电力,2006,34(3):29-31.Zhang Yong.Status quo of wind hazard prevetion for transmission lines and counter measures[J].East China Electric Power,2006,34(3):29-31(in Chinese).
[7]李春祥,都敏,韩兵康.基于AR模型模拟超高层建筑的脉动风速时程[J].地震工程与工程振动,2008,28(3):88-90.Li Chunxiang,Du Min,Han Bingkang.Simulation of fluctuating wind speed time series of super-tall buildings based on AR model[J].Journal of Earthquake Engineering and EnineeingVibration,2008,28(3):88-90(in Chinese).
[8]Shinozuka M.Simulation of multivariate and multidimensional random process[J].Journal of the Acoustical society of America,1971,49(1):357-367.
[9]Shinozuka M,Jan C M.Digital simulation of random process and its application[J].Journal of Sound and Vibration,1972,25(1):111-128.
[10]Yang J.Simulation of random envelope processes[J].Journal of Sound and V ibration,1972,25(1):73-85.
[11]Shinozuka M.Digital simulation of random processes in engineering mechanics with the aid of FFT technique stochastic problem in mechanics[M].Waterloo:University of Waterloo Press,1974:277-286.
[12]王耀南,孙春顺,李欣然.用实测风速校正的短期风速仿真研究[J].中国电机工程学报,2008,28(11):94-100.Wang Yaonan,Sun Chunshun,Li Xinran.Short-term wind speed simulation corrected with field measured wind speed[J].Proceedings of the CSEE,2008,28(11):94-100(in Chinese).
[13]孙春顺,王耀南,李欣然.小时风速的向量自回归模型及应用[J].中国电机工程学报,2008,28(14):112-117.Sun Chunshun,Wang Yaonan,Li Xinran.A vector autoregression model of hourly wind speed and its applications in hourly wind speed forecasting[J].Proceedings of the CSEE,2008,28(14):112-117(inChinese).
[14]穆安乐,刘宏昭,张彦斌,等.风力发电机三维阵风谱建模与仿真的向量自回归法[J].中国电机工程学报,2008,28(8):117-120.Mu Anle,Liu Hongzhao,Zhang Yanbin,et al.VAR approach for3-d gust wind spectral modeling and simulation of wind turbine[J].Proceedings of the CSEE,2008,28(8):117-120(in Chinese).
[15]李宏男,任月明,白海峰.输电塔体系风雨激励的动力分析模型[J].中国电机工程学报,2007,27(30):44-48.Li Hongnan,Ren Yueming,Bai Haifeng.Rain-wind-induced dynamic model for transmission tower system[J].Proceedings of the CSEE,2007,27(30):44-48(in Chinese).
[16]柳国环,李宏男.高压输电塔–线体系风致动力响应分析与优化控制[J].中国电机工程学报,2008,28(19):131-137.Liu Guohuan,Li Hongnan.Analysis and optimization control of wind-induced dynamic response for high-voltage transmission tower-line system[J].Proceedings of the CSEE,2008,28(19):131-137(in Chinese).
[17]白海峰,李宏男.大跨越输电塔线体系随机脉动风场模拟研究[J].工程力学,2007,24(7):146-151.Bai Haifeng,Li Hongnan.Simulation stduy of stochastic fluctuating wind field on large spane electricity transmission tower–line system[J].Engineering Mechanics,2007,24(7):146-151(in Chinese).
[18]王济,胡晓.MATLAB在振动信号处理中的应用[M].北京:中国水利水电出版社,2006:49-54.
[19]张育钊,邱应强.一种FFT处理器的地址生成算法[J].华侨大学学报:自然科学版,2008,29(4):543-544.Zhang Yuzhao,Qiu Yingqiang.Address generation algorithm for a FFT processor[J].Journal of Huaqiao University:Natural Science,2008,29(4):543-544(in Chinese).
[20]石辛民,郝整清.基于MATLAB的实用数值计算[M].北京:清华大学出版社,2006:12-75.
[21]潘迪夫,刘辉,李燕飞.基于时间序列分析和卡尔曼滤波算法的风电场风速预测优化模型[J].电网技术,2008,32(7):83-86.Pan Difu,Liu Hui,Li Yanfei.A wind speed forecasting optimization model for wind farms based on time series analysis and Kalman filter algorithm[J].Power System Technology,2008,32(7):83-86(in Chinese).
[22]蔡凯,谭伦农,李春林,等.时间序列与神经网络法相结合的短期风速预测[J].电网技术,2008,32(8):83-90.Cai Kai,Tan Lunnong,Li Chunlin,et al.Short-term wind speed forecasting combing time series and neural network method[J].Power System Technology,2008,32(8):83-90(in Chinese).