引文
[1]胡聿贤.地震工程学[M].北京:地震出版社,1988:321.(HU Yuxian.Earthquake engineering[M].Beijing:Earthquake Press,1988:321.(inChinese))
[2]王根龙,张军慧,刘红帅.汶川地震北川县城地质灾害调查与初步分析[J].中国地质灾害与防治学报,2009,20(3):47–51.(WANG Genlong,ZHANG Junhui,LIU Hongshuai.Investigationand preliminary analysis of geologic disasters in Beichuan Countyinduced by Wenchuan earthquake[J].The Chinese Journal ofGeological Hazard and Control,2009,20(3):47–51.(in Chinese))
[3]黄润秋,唐川,李勇,等.汶川地震地质灾害研究[M].北京:科学出版社,2009:203–633.(HUANG Runqiu,TANG Chuan,LI Yong,et al.Geohazard assessment of the Wenchuan earthquake[M].Beijing:Science Press,2009:203–633.(in Chinese))
[4]许强,裴向军,黄润秋,等.汶川地震大型滑坡研究[M].北京:科学出版社,2009:53–91.(XU Qiang,PEI Xiangjun,HUANGRunqiu,et al.Large-scale landslides induced by the Wenchuanearthquake[M].Beijing:Science Press,2009:53–91.(in Chinese))
[5]殷跃平,潘桂棠,刘宇平,等.汶川地震地质与滑坡灾害概论[M].北京:地质出版社,2009:60–129.(YIN Yueping,PAN Guitang,LIU Yuping,et al.Great Wenchuan earthquake:seismogeology andlandslide hazards[M].Beijing:Geological Publishing House,2009:60–129.(in Chinese))
[6]中华人民共和国国家标准编写组.GB50111—2006铁路工程抗震设计规范[S].北京:中国计划出版社,2009.(The NationalStandard Compilation Group of the People′s Republic of China.GB 50111—2006 Code for seismic design of railway engineering[S].Beijing:China Planning Press,2009.(in Chinese))
[7]黄润秋.汶川8.0级地震触发崩滑灾害机制及其地质力学模式[J].岩石力学与工程学报,2009,28(6):1239–1249.(HUANG Runqiu.Mechanism and geomechanical modes of landslide hazards triggeredby Wenchuan 8.0 earthquake[J].Chinese Journal of Rock Mechanicsand Engineering,2009,28(6):1 239–1 249.(in Chinese))
[8]LIN M L,WANG K L.Seismic slope behavior in a large-scale shakingtable model test[J].Engineering Geology,2006,86(2/3):118–133.
[9]郑颖人,赵尚毅,李安洪,等.有限元极限分析法及其在边坡中的应用[M].北京:人民交通出版社,2011:224.(ZHENGYingren,ZHAOShangyi,LI Anhong,et al.FEM limit analysis and its application toslope engineering[M].Beijing:China Communications Press,2011:224.(in Chinese))
[10]刘红帅.岩质边坡地震稳定性分析方法研究[博士学位论文][D].哈尔滨:中国地震局工程力学研究所,2006.(LIU Hongshuai.Study ofanalysis method of rock slope seismic stability[Ph.D.Thesis][D].Harbin:Institute of Engineering Mechanics,China Earthquake Administration,2006.(in Chinese))
[11]HACK R,ALKEMA D,KRUSE G,et al.Influence of earthquakes onthe stability of slopes[J].Engineering Geology,2007,91(1):4–15.
[12]刘红帅,唐立强,薄景山,等.确定岩质边坡地震安全系数的新方法[J].哈尔滨工程大学学报,2009,30(9):1007–1011.(LIUHongshuai,TANG Liqiang,BO Jingshan,et al.New method ofdetermining the seismic safety factor of a rock slope[J].Journal ofHarbin Engineering University,2009,30(9):1 007–1 011.(inChinese))
[13]郑颖人,叶海林,黄润秋,等.边坡地震稳定性分析探讨[J].地震工程与工程振动,2010,30(2):173–180.(ZHENG Yingren,YEHailin,HUANG Runqiu,et al.Study on the seismic stability analysisof a slope[J].Earthquake Engineering and Engineering Vibration,2010,30(2):173–180.(in Chinese))
[14]王伟,杨敏,刘德富.基于经济风险分析的边坡稳定性评价[J].同济大学学报:自然科学版,2004,32(12):1603–1607.(WANGWei,YANG Min,LIU Defu.Assessment of slope stability witheconomical risk analysis[J].Journal of Tongji University:NaturalScience,2004,32(12):1 603–1 607.(in Chinese))
[15]中华人民共和国国家标准编写组.GB50330—2002建筑边坡工程技术规范[S].北京:中国建筑工业出版社,2002.(The NationalStandards Compilation Group of People s Republic of China.GB50330—2002 Technical code for building slope engineering[S].Beijing:China Architecture and Building Press,2002.(in Chinese))
[16]刘红帅,杨俊波,薄景山,等.岩土体物理力学参数对岩质滑坡稳定性的影响[J].煤田地质与勘探,2008,36(1):37–40.(LIUHongshuai,YANG Junbo,BO Jingshan,et al.Influences of physicaland mechanical parameters of geomaterial on stability of rock landside[J].Coal Geology and Exploration,2008,36(1):37–40.(in Chinese))
[17]程圣国,方坤河,罗先启,等.三峡库区新生型滑坡滑带土抗剪强度确定概率方法[J].岩石力学与工程学报,2007,26(4):840–845.(CHENG Shengguo,FANG Kunhe,LUO Xianqi,et al.Probabilitymethod to determine shear strength of slide zone clay for neogeniclandslide in Three Gorges reservoir area[J].Chinese Journal of RockMechanics and Engineering,2007,26(4):840–845.(in Chinese))
[18]刘红帅,唐立强,薄景山,等.岩体弹黏塑性显式波动有限元分析[J].煤田地质与勘探,2009,37(1):38–42.(LIU Hongshuai,TANG Liqiang,BO Jingshan,et al.Elastic-viscoplastic analysis ofexplicit FEM for simulating wave motions in rock mass[J].CoalGeology and Exploration,2009,37(1):38–42.(in Chinese))
[19]廖振鹏.工程波动理论导论[M].2版.北京:科学出版社,2002:156–162.(LIAO Zhenpeng.Introduction of wave motion theories inengineering[M].2nd ed.Beijing:Science Press,2002:156–162.(inChinese))
[20]《工程地质手册》编委会.工程地质手册[M].4版.北京:中国建筑工业出版社,2007:165–170.(The Editorial Board of theHandbook of Engineering Geology.Handbook of engineeringgeology[M].4th ed.Beijing:China Architecture and Building Press,2007:165–170.(in Chinese))
[21]李雨润.液化土层中桩基横向动力响应研究[博士学位论文][D].哈尔滨:中国地震局工程力学研究所,2006.(LI Yurun.Study onlateral dynamic response of pile foundation in liquefiable soil[Ph.D.Thesis][D].Harbin:Institute of Engineering Mechanics,China EarthquakeAdministration,2006.(in Chinese))
[22]俞言祥,汪素云.中国东部和西部地区水平向基岩加速度反应谱衰减关系[J].震害防御技术,2006,1(3):206–217.(YU Yanxiang,WANG Suyun.Attenuation relations for horizontal peak groundacceleration and response spectra in eastern and western China[J].Technology for Earthquake Disaster Prevention,2006,1(3):206–217.(in Chinese))
[23]李远耀,殷坤龙,柴波,等.三峡库区滑动带土抗剪强度参数的统计规律研究[J].岩土力学,2008,29(5):1419–1424.(LIYuanyao,YIN Kunlong,CHAI Bo,et al.Study on statistical rule ofshear strength parameters of soil in landslide zone in Three GorgesReservoir area[J].Rock and Soil Mechanics,2008,29(5):1 419–1 424.(in Chinese))
[24]邵龙潭,李红军.土工结构稳定分析——有限元极限平衡法及其应用[M].北京:科学出版社,2011:69.(SHAO Longtan,LI Hongjun.Stability analysis of soil structure—FEM limit analysis and itsapplication[M].Beijing:Science Press,2011:69.(in Chinese))
[25]BRAY J,TRAVASAROU T.Pseudostatic coefficient for use insimplified seismic slope stability evaluation[J].Journal of Geotechnical andGeoenvironmental Engineering,2009,135(9):1 336–1 340.
[26]赵彪,陈洪凯.边坡地震稳定性完全动力分析法[J].重庆交通大学学报:自然科学版,2011,30(增1):580–583.(ZHAO Biao,CHEN Hongkai.Fully dynamic analysis method for seismic stabilityof slope[J].Journal of Chongqing Jiaotong University:NaturalScience,2011,30(Supp.1):580–583.(in Chinese))