海上油田绥中36—1时移地震可行性研究的动态分析方法(英文)
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
绥中36—1作为中海油主力注水生产、疏松砂岩稠油油田,提高采收率成为当前的主要技术方向。时移地震作为提高采收率的主要地球物理手段,使之成为主要的研究方向。本文阐述了我们利用已有的生产数据、油藏认识的可行研究,即利用动态及历史拟合的油藏模型,分析油藏可能时移地震响应,寻找时移地震响应在时空的分布特征。一方面可以分析在本地区应用时移地震技术的可行性;另一方面对第二次甚至第三次采集时移地震数据的时机进行分析。经过分析认为绥中36—1的时移地震响应除受到疏松储层的影响外,将受油藏脱气的影响。并认为生产10年后采集时移地震数据有相当的可行性。
Field SZ36-1 is a water-flooded heavy oil reservoir with high porosity and unconsolidated sand. The recovery rate is low so that it becomes a challenge for production. Time-lapse seismic data is studied to improve the oil recovery for this field. This feasibility study analyzes the possible time-lapse seismic attribute spatial distribution using dynamic data and the reservoir model to determine the optimum time to acquire a new seismic survey. Based on the study, it is found that the time-lapse seismic response for this unconsolidated sand has a strong signature due to solution gas when the reservoir pressure is below the bubble point. This indicates that acquiring a new survey after 10 years of production is appropriate for a time-lapse seismic application.
引文
Flemings, P. B., Burkhart, T., Hoover, A. R., and Hicks, P. J., 1997, Impedance change in the K40 sand, South Timbalier 295, offshore Louisiana: Applications to 4-D seismic analysis: 67th Ann. Internat. Mtg., Soc. Expl. Geophys., Expanded Abstracts,914 – 916.
    Huang, Xur., 2001a, Integration of time-lapse seismic with production d a t a : A t o o l f o r r e s e r v o i r engineering: The Leading Edge, 20 (11), 1148 – 1153.
    Huang, Xur., Will, R., Khan, M., and Stanley, L., 2001b, Integration of time-lapse seismic and production data in a Gulf of Mexico gas field: The Leading Edge, 20 (3), 278 – 289.
    Huang, Xur., Meister, L., and Workman, R., 1997, Reservoir characterization by integration of time-lapse and production data: Paper SPE 38695, SPE Annual Technical Conference and Exhibition, San Antonio, TX.
    Jack, I., 1997, Time-lapse seismic i n r e s e r v o i r m a n a g e m e n t : Distinguished Instructor Short Course Notes, Soc. Expl. Geophys., pp. 282.
    Jenkins, S. D., Waite, M. W., and Bee, M. F., 1997, Time-lapse monitoring of the Duri steamflood: A pilot and case study: The Leading Edge, 16 (9), 1267 – 1273.
    Lumley, D. E., Behrens, R. A., and Wang, Z., 1997, Assessing the Technical Risk of a 4D Seismic Project: 67th Ann. Internat. Mtg., Soc. Expl. Geophys., Expanded Abstracts, 894 – 897.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心