引文
[1]贾敏才,周健,李杰三.地基处理施工振动及其对环境的影响评述[J].地下空间,2004,24(4):500-505.(JIA Mincai,ZHOU Jian,LI Jiesan.Review of foundation construction vibration and its impact on environment[J].Underground Space,2004,24(4):500-505.(in Chinese))
[2]耿光旭,李华平,刘金川.施工振动对环境影响的监测[J].勘察科学技术,2004,(4):54-57.(GENG Guangxu,LI Huaping,LIU Jinchuan.Monitoring of construction vibration to environment[J].Site Investigation Science and Technology,2004,(4):54-57.(in Chinese))
[3]陆伟东,韩晓健,杨放.强夯施工环境振动影响的评价方法[J].南京工业大学学报,2002,24(5):65-68.(LU Weidong,HAN Xiaojian,YANG Fang.Evaluation method of the environmental vibration effects caused by dynamic compaction[J].Journal of Nanjing University of Technology,2002,24(5):65-68.(in Chinese))
[4]杨龙才,王炳龙.强夯施工对环境振动的影响分析[J].华东交通大学学报,2007,24(2):16-20.(YANG Longcai,WANG Binglong.Analysis for environmental vibration effects caused by dynamic compaction[J].Journal of East China Jiaotong University,2007,24(2):16-20.(in Chinese))
[5]左文军,谢立扬.振动压路机引起的环境振动及其危害[J].长安大学学报(自然科学版),2003,23(4):81-84.(ZUO Wenjun,XIE Liyang.Environmental vibration and damage effect caused by vibratory rollers[J].Journal of Chang′an University(Natural Science),2003,23(4):81-84.(in Chinese))
[6]SVINKIN M R.Prediction soil and structure vibrations from impact machines[J].Journal of Geotechnical and Geoenvironmental Engineering,ASCE,2002,128(7):602-612.
[7]黄有兴,胡伟,李晓梅,等.打桩施工振动传播的预测方法[J].杭州大学学报,1997,24(1):31-35.(HUANG Youxing,HU Wei,LI Xiaomei,et al.The prediction method of piling construction vibration propagation[J].Journal of Hangzhou University,1997,24(1):31-35.(in Chinese))
[8]张庆松,李术才,李利平.分岔隧道大拱段围岩稳定性监控与爆破振动效应分析[J].岩石力学与工程学报,2008,27(7):1462-1468.(ZHANG Qingsong,LI Shucai,LI Liping.Study of blasting dynamic effect and site monitoring of large-span shallow part of bifurcated tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1462-1468.(in Chinese))
[9]赵锦桥,李廷春,崔积弘.隧道掘进爆破地震频谱特性分析[J].爆破,2005,22(2):110-115.(ZHAO Jinqiao,LI Tingchun,CUI Jihong.Seismic spectra characterstics of tunnel excavation blasting[J].Blasting,2005,22(2):110-115.(in Chinese))
[10]谢全敏,夏元友,李新平.龙滩水电站蠕变边坡的爆破振动控制研究[J].岩石力学与工程学报,2003,22(11):1929-1930.(XIE Quanmin,XIA Yuanyou,LI Xinping.Study of blasting vibration control of creep mass slope of Longtan Hydropower Station[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(11):1929-1930.(in Chinese))
[11]陈庆,王宏图,胡国忠,等.隧道开挖施工的爆破振动监测与控制技术[J].岩土力学,2005,26(6):964-967.(CHEN Qing,WANG Hongtu,HU Guozhong,et al.Monitoring and controlling technology for blasting vibration induced by tunnel excavation[J].Rock and Soil Mechanics,2005,26(6):964-967.(in Chinese))
[12]严鹏,卢文波,陈明,等.初始地应力场对钻爆开挖过程中围岩振动的影响研究[J].岩石力学与工程学报,2008,27(5):1036-1045.(YAN Peng,LU Wenbo,CHEN Ming,et al.Study of impaction of initial geostress field on vibration of surrounding rock during excavation with drilling and blasting method[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(5):1036-1045.(in Chinese))
[13]谭忠盛,喻渝,王明年,等.大断面浅埋黄土隧道锚杆作用效果的试验研究[J].岩土力学,2008,29(2):491-495.(TAN Zhongsheng,YU Yu,WANG Mingnian,et al.Experimental study of bolt effect on large section shallow-buried loess tunnels[J].Rock and Soil Mechanics,2008,29(2):491-495.(in Chinese))
[14]尤春安.全长黏结式锚杆的受力分析[J].岩石力学与工程学报,2000,19(3):339-341.(YOU Chun′an.Mechanics analysis of fully-grouted anchor[J].Chinese Journal of Rock Mechanics and Engineering,2000,19(3):339-341.(in Chinese))
[15]程良奎,韩军,张培文.岩土锚固工程的长期性能与安全评价[J].岩石力学与工程学报,2008,27(5):865-872.(CHENG Liangkui,HAN Jun,ZHANG Peiwen.Long-term performance and safety assessment of anchorage in geotechnical engineering[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(5):865-872.(in Chinese))
[16]李义,张昌锁,王成.锚杆锚固质量无损检测几个关键问题的研究[J].岩石力学与工程学报,2008,27(1):108-115.(LI Yi,ZHANG Changsuo,WANG Cheng.Study of several key issues in nondestructive detection of bolt bonding integrity[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(1):108-115.(in Chinese))
[17]汪明武,王鹤龄.锚固质量的无损检测技术[J].岩石力学与工程学报,2002,21(1):126-129.(WANG Mingwu,WANG Heling.Nondestructive testing of anchoring quality[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(1):126-129.(in Chinese))
[18]周仲华,姚增,王旭东.敦煌石窟围岩弹性波测试[C]//敦煌研究文集(上).兰州:甘肃民族出版社,1993:368-372.(ZHOU Zhonghua,YAO Zeng,WANG Xudong.Tests of elastic wave in Mogao Grottoes country rocks[C]//Dunhuang Research Selections(Volume1).Lanzhou:Gansu Nationalities Publishing House,1993:368-372.(in Chinese))
[19]姚增,周仲华,郦伟堂.敦煌石窟围岩弹性波动力学特征[C]//敦煌研究文集(上).兰州:甘肃民族出版社,1993:376-380.(YAO Zeng,ZHOU Zhonghua,LI Weitang.Dynamics characteristics of elastic wave in Mogao Grottoes country rocks[C]//Dunhuang Research Selections(Colume1).Lanzhou:Gansu Nationalities Publishing House,1993:376-380.(in Chinese))
[20]殷楚梅,李树林.建筑施工振动环境影响评价[J].云南环境科学,2001,20(增):128-129.(YIN Chumei,LI Shulin.Construction vibration environmental impact assessment[J].Yunnan Environmental Science,2001,20(Supp.):128-129.(in Chinese))
[21]建筑施工场界噪声限制标准(GB12523-90)[OL].http://www.tianyabook.com/(The limits set on the emission of environmental noise within the boundary of a construction site(GB12523-90)[OL].http://www.tianyabook.com/(in Chinese))