引文
[1]段庆芳.潞安矿区高度集约化生产技术[J].煤,1999,8(1):1-5.Duan Qingfang.Highly intensive techniques of Lu’an mining area[J].Mine,1999,8(1):1-5.
[2]尚海涛.对综采放顶煤技术的认识和思考[J].煤,1997,7(1):1-3.Shang Haitao.Discussion on fully-mechanized sublevel caving min-ing technique[J].Mine,1997,7(1):1-3.
[3]郭金刚.超长综放工作面关键技术与实施效果[J].中国煤炭,2002,28(2):30-32.Guo Jingang.Key techniques and the applications of super-long full-y-mechanized mining panels[J].China Coal,2002,28(2):30-32.
[4]曹胜根,张东升,杜卫新.超长综放工作面开采关键技术[J].矿山压力与顶板管理,2003(4):69-71.Cao Shenggen,Zhang Dongsheng,Du Weixin.Key techniques of su-per-long fully-mechanized mining panels[J].Ground Pressure&Roof Control,2003(4):69-71.
[5]闫少宏,尹希文.大采高综放开采几个理论问题的研究[J].煤炭学报,2008,33(5):481-484.Yan Shaohong,Yin Xiwen.Discussing about the main theoretical problems of long wall with top coal caving[J].Journal of China CoalSociety,2008,33(5):481-484.
[6]张日晨.神东矿区保德煤矿综放开采可行性研究[J].煤炭学报,2008,33(5):489-491.Zhang Richen.Feasibility study of long wall with top coal caving in Baode Coal Mine in Shendong mining area[J].Journal of China Coal Society,2008,33(5):489-491.
[7]杨科,谢广祥.采动裂隙分布及其演化特征的采厚效应[J].煤炭学报,2008,33(10):1092-1096.Yang Ke,Xie Guangxiang.Caving thickness effects on distribution and evolution characteristics of mining induced fracture[J].Journal of China Coal Society,2008,33(10):1092-1096.
[8]闫少宏.特厚煤层大采高综放开采支架外载的理论研究[J].煤炭学报,2009,34(5):590-593.Yan Shaohong.Theory study on the load on support of long wall with top coal caving with great mining height in extra thick coal seam[J].Journal of China Coal Society,2009,34(5):590-593.
[9]张子飞,来兴平.复杂条件下急斜厚煤层高阶段综放开采超前预爆破[J].煤炭学报,2008,33(8):845-849.Zhang Zifei,Lai Xingping.Segment pre-blasting of sublevel caving of steep and thick coal seam under complex conditions[J].Journal of China Coal Society,2008,33(8):845-849.
[10]卢喜山,赵学雷,徐向东,等.准大采高综放设备配套技术研究[J].煤,2006,15(6):6-7.Lu Xishan,Zhao Xuelei,Xu Xiangdong,et al.Kit technique re-search about fully-mechanized coal winning equipment[J].Mine,2006,15(6):6-7.
[11]孔令海,姜福兴,刘杰,等.特厚煤层综放工作面区段煤柱合理宽度的微地震监测[J].煤炭学报,2009,34(7):871-874.Kong Linghai,Jiang Fuxing,Liu Jie,et al.High-precision microseis-mic monitoring system to reasonable width of segment coal pillar in extra-thick coal seam fully mechanized top-coal caving mining[J].Journal of China Coal Society,2009,34(7):871-874.
[12]付玉平,宋选民,邢平伟,等.大采高采场顶板断裂关键块稳定性分析[J].煤炭学报,2009,34(8):1027-1031.Fu Yuping,Song Xuanmin,Xing Pingwei,et al.Stability analysis on main roof key block in large mining height workface[J].Journal of China Coal Society,2009,34(8):1027-1031.
[13]王永秀,毛德兵,齐庆新.数值模拟中煤岩层物理力学参数确定的研究[J].煤炭学报,2003,28(6):593-597.Wang Yongxiu,Mao Debing,Qi Qingxin.Study on determining of the mechanical parameters of rock mass used in numerical simula-tion[J].Journal of China Coal Society,2003,28(6):593-597.
[14]宁宇.大采高综采煤壁片帮冒顶机理与控制技术[J].煤炭学报,2009,34(1):50-52.Ning Yu.Mechanism and control technique of the rib spalling in fully mechanized mining face with great mining height[J].Journal of China Coal Society,2009,34(1):50-52.