引文
[1]日本核安全神话破灭,应对危机仅仅建设社会不够[EB/OL].[2011-03-24].http://www.boraid.com/darticle3/list.asp?id=163792#.
[2]日本最大的灾难是灾难常态化[EB/OL].[2011-04-11].http://opinion.huanqiu.com/roll/2011-04/1620000.html.
[3]众专家学者探究日本大地震的影响与警示[EB/OL].[2011-04-11].http://www.ce.cn/cysc/ny/heneng/201104/15/t20110415_20964188.shtml.
[4]NODA M.Disaster and restoration of electricity supply systemby Hanshin-Awaji earthquake[C]//Proceedings of APECSeminar on Earthquake Disaster Management of Energy SupplySystems,September 5-6,2001,Taipei,China.
[5]宋冰,徐倩,曲飞帆.日本核电危机背后[EB/OL].[2011-03-14].http://www.yicai.com/news/2011/03/706831.html.
[6]日本核电事故及大面积停电启示[EB/OL].[2011-04-07].http://epaper.indaa.com.cn/html/201-04/07/content_264592.htm.
[7]日本9.0级地震引发系列灾害[EB/OL].[2011-04-11].http://news.sohu.com/s2011/ribendizhen11/.
[8]福岛事故提醒世界安全利用核能[EB/OL].[2011-03-24].http://www.chinanews.com/ny/2011/03-24/2929343.shtml.
[9]日本电力遭地震重创电荒已经形成[EB/OL].[2011-03-16].http://www.qianhuaweb.com/content/2011-03/16/content_1403729.htm.
[10]薛禹胜,刘强,DONG Zhaoyang,等.关于暂态稳定不确定性分析的评述[J].电力系统自动化,2007,31(14):1-7.XUE Yusheng,LIU Qiang,DONG Zhaoyang,et al.A reviewof non-deterministic analysis for power system transientstability[J].Automation of Electric Power Systems,2007,31(14):1-7.
[11]Japan and future of U.S.nuclear power[EB/OL].[2011-04-11].http://www.cnn.com/2011/OPINION/03/14/romm.japan.nuclear.us/index.html.
[12]王昊昊,罗建裕,徐泰山,等.中国电网自然灾害防御技术现状调查与分析[J].电力系统自动化,2010,34(23):5-10.WANG Haohao,LUO Jianyu,XU Taishan,et al.Questionnaire survey and analysis of natural disaster techniquesof power grids in China[J].Automation of Electric PowerSystems,2010,34(23):5-10.
[13]侯慧,尹项根,游大海,等.国外经验对中国电力系统应急减灾机制的启示[J].电力系统自动化,2008,32(12):89-93.HOU Hui,YIN Xianggen,YOU Dahai,et al.Apocalypse ofoverseas experiences on emergency anti-disaster mechanism forChina power system[J].Automation of Electric PowerSystems,2008,32(12):89-93.
[14]张建华,尚敬福,赵炜炜,等.中国区域电网应急管理机制建设的建议[J].电力系统自动化,2009,33(4):40-44.ZHANG Jianhua,SHANG Jingfu,ZHAO Weiwei,et al.Suggestions on construction of emergency managementmechanism for Chinese regional power system[J].Automationof Electric Power Systems,2009,33(4):40-44.
[15]WG C2.02.04 Technical Brochure:Defense plan againstextreme contingencies[J].Electra,2007(231):47-61.
[16]张伯明,吴素农,蔡斌,等.电网控制中心安全预警和决策支持系统设计[J].电力系统自动化,2006,30(6):1-5.ZHANG Boming,WU Sunong,CAI Bin,et al.Design ofearly warning and security countermeasure system for electricpower control centers[J].Automation of Electric PowerSystems,2006,30(6):1-5.
[17]薛禹胜.综合防御由偶然故障演化为电力灾难——北美“8.14”大停电的警示[J].电力系统自动化,2003,27(18):1-5.XUE Yusheng.The way from a simple contingency to system-wide disaster—lessons from the eastern interconnectionblackout in 2003[J].Automation of Electric Power Systems,2003,27(18):1-5.
[18]薛禹胜.时空协调的大停电防御框架:(一)从孤立防御到综合防御[J].电力系统自动化,2006,30(1):8-16.XUE Yusheng.Space-time cooperative framework fordefending blackouts:PartⅠfrom isolated defense lines tocoordinated defending[J].Automation of Electric PowerSystems,2006,30(1):8-16.
[19]薛禹胜.时空协调的大停电防御框架:(二)广域信息、在线量化分析和自适应优化控制[J].电力系统自动化,2006,30(2):1-10.XUE Yusheng.Space-time cooperative framework fordefending blackouts:PartⅡreliable information,quantitative analyses and adaptive controls[J].Automation ofElectric Power Systems,2006,30(2):1-10.
[20]薛禹胜.时空协调的大停电防御框架:(三)各道防线内部的优化和不同防线之间的协调[J].电力系统自动化,2006,30(3):1-11.XUE Yusheng.Space-time cooperative framework fordefending blackouts:PartⅢoptimization and coordination ofdefense-lines[J].Automation of Electric Power Systems,2006,30(3):1-11.
[21]薛禹胜,李天然,尹霞,等.广义阻塞及市场力的研究框架[J].电力系统自动化,2010,34(21):1-10.XUE Yusheng,LI Tianran,YIN Xia,et al.A researchframework for generalized congestions and market power[J].Automation of Electric Power Systems,2010,34(21):1-10.
[22]XUE Yusheng.Defense schemes against power systemblackouts in China with high load growth[C]//Proceedings ofthe 15th Power System Computation Conference,August 22-26,2005,Liege,Belgium.
[23]XUE Yusheng.Progresses of blackout defense systems inChina[C]//Proceedings of 2008IEEE/PES General Meeting,July 20-24,2008,Pittsburgh,PA,USA.
[24]李碧君,许剑冰,徐泰山,等.大电网安全稳定综合协调防御的工程应用[J].电力系统自动化,2008,32(6):25-30.LI Bijun,XU Jianbing,XU Taishan,et al.Engineeringapplication of integrated and coordinated defense technology oflarge power system security and stability[J].Automation ofElectric Power Systems,2008,32(6):25-30.
[25]薛禹胜,费圣英,卜凡强.极端外部灾害中的停电防御系统构思:(一)挑战与反思[J].电力系统自动化,2008,32(9):1-6.XUE Yusheng,FEI Shengying,BU Fanqiang.Upgrading theblackout defense scheme against extreme disasters:PartⅠnew challenges and reflection[J].Automation of ElectricPower Systems,2008,32(9):1-6.
[26]薛禹胜,费圣英,卜凡强.极端外部灾害中的停电防御系统构思:(二)任务与展望[J].电力系统自动化,2008,32(10):1-5.XUE Yusheng,FEI Shengying,BU Fanqiang.Upgrading theblackout defense scheme against extreme disasters:PartⅡtasks and prospects[J].Automation of Electric PowerSystems,2008,32(10):1-5.
[27]Is nuclear energy worth the risk?[EB/OL].[2011-04-04].http://www.cnn.com/2011/OPINION/04/04/nuclear.debate/index.html.
[28]杨传敏.福岛核危机启示录[EB/OL].[2011-03-23].http://gcontent.oeeee.com/4/65/465636eb4a7ff4b2/Blog/13b/9e473a.html.
[29]法国核电启示录[EB/OL].[2011-03-24].http://finance.ifeng.com/news/hqcj/20110325/3756601.shtml.
[30]李锐,陈颖,梅生伟,等.基于停电风险评估的城市配电网应急预警方法[J].电力系统自动化,2010,34(16):19-23.LI Rui,CHEN Ying,MEI Shengwei,et al.An early warningmethod for emergency response baed on power failure riskanalysis of distribution systems[J].Automation of ElectricPower Systems,2010,34(16):19-23.
[31]AMIN M.Toward self-healing energy infrastructure systems[J].IEEE Computer Applications in Power,2001,14(1):20-29.
[32]肖世杰.构建中国智能电网技术思考[J].电力系统自动化,2009,33(9):1-4.XIAO Shijie.Consideration of technology for constructingChinese smart grid[J].Automation of Electric Power Systems,2009,33(9):1-4.