引文
[1]李贵乾,郑罡,高波.基于OpenSees的钢筋混凝土桥墩拟静力试验数值分析[J].世界地震工程,2011,27(3):110~114Li Gui-qian,Zheng Gang,Gao Bo.Numerical Analysis for Pseudo-static Tests of Reinforced Concrete Bridge Columns Based on OpenSees[J].Worled Earthquake Engineering,2011,27(3):110~114(in Chinese)
[2]解琳琳,叶献国,种迅,等.钢筋混凝土柱低周反复试验数值分析的参数研究[J].土木工程学报,2012,45(S1):273~277Xie Lin-lin,Ye Xian-guo,Chong Xun,et al.Parameter Research on Numerical Analysis of Low-cyclic Loading Test of RC Columns[J].China Civil Engineering Journal,2012,45(S1):273~277(in Chinese)
[3]Augusto Gomes J A.Nonlinear Cyclic Stress-strain Relationship of Reinforcing Bars Including Buckling[J].Engineering Structures,1997,19(10):822~826
[4]Rajesh Prasad Dhakal K M.Modeling for Postyield Buckling of Reinforcingment[J].Journal of Structural Engineering,2002,128(9):1139~1147
[5]陆新征,叶列平,潘鹏,等.钢筋混凝土框架结构拟静力倒塌试验研究及数值模拟竞赛Ⅱ:关键构件试验[J].建筑结构,2012,42(11):23~26Lu Xin-zheng,Ye Lie-ping,Pan Peng,et al.Pseudostatic Collapse Experiments and Numerical Prediction Competition of RC Frame StructureⅡ:Key Elements Experiment[J].Building Structure,2012,42(11):23~26(in Chinese)
[6]Dudley Charles Kent R P.Flexural Members with Confined Concrete[J].Journal of the Structural Division,1971,97(7):1969~1990
[7]刘立军,贾明明,于晓辉.箍筋约束混凝土的本构关系研究[J].工业建筑,2012,42(S1):188~191Liu Li-jun,Jia Ming-ming,Yu Xiao-hui.Study of Constitutive Relations for Steel-hoop-confined Concrete Material[J].Industrial Construction,2012,42(S1):188~191(in Chinese)
[8]孙治国,王东升,郭讯,等.汶川大地震绵竹市回澜立交桥震害调查[J].地震工程与工程振动,2009,29(4):132~138Sun Zhi-guo,Wang Dong-sheng,Guo Xun,et al.Damage Investigation of Huilan Interchange in Mianzhu after Wenchuan Earthquake[J].Journal of Earthquake Engineering and Engineering Vibration,2009,29(4):132~138(in Chinese)
[9]王东升,孙治国,郭迅,等.汶川地震桥梁震害经验及抗震研究若干新进展[J].公路交通科技,2011,28(10):44~53Wang Dong-sheng,Sun Zhi-guo,Guo Xun,et al.Lessons Learned from Wenchuan Seismic Damage and Recent Research on Seismic Design of Highway Bridges[J].Journal of Highway and Transportation Research and Development,2011,28(10):44~53(in Chinese)
[10]夏修身,陈兴冲,王常峰,等.桥梁震害分析与合理抗震体系研究[J].工程抗震与加固改造,2011,33(6):132~136Xia Xiu-shen,Chen Xing-chong,Wang Chang-feng,et al.Bridge Damage Analysis and Reasonable Seismic Systems[J].Earthquake Resistant Engineering and Retrofitting,2011,33(6):132~136(in Chinese)
[11]李贵乾.钢筋混凝土桥墩抗震性能试验研究及数值分析[D].重庆:重庆交通大学,2010Li Gui-qian.Experimental Study and Numerical Analysis on Seismic Performance of Reingorced Concrete Bridge Columns[D].Chongqing:Chongqing Jiaotong University,2010(in Chinese)
[12]杨玄.钢筋混凝土桥墩地震损伤分析与模型研究[D].重庆:重庆交通大学,2011Yang Xuan.Seismic Damage Analysis of Reinforced Concrete Bridge Pier with Model Research[D].Chongqing:Chongqing Jiaotong University,2011(in Chinese)
[13]李贵乾,郑罡,王军.圆形钢筋混凝土桥墩抗震性能(Ⅱ):试验结果评估[J].重庆交通大学学报(自然科学版),2011,30(6):1270~1274Li Gui-qian,Zheng Gang,Wang Jun.Seismic Performance of Circular Reinforced Concrete Bridge Columns(Ⅱ):Evaluation of Experimental Results[J].Journal of Chongqing Jiaotong University(Natural Science),2011,30(6):1270~1274(in Chinese)
[14]孙治国.钢筋混凝土桥墩抗震变形能力研究[D].哈尔滨:中国地震局工程力学研究所,2012Sun Zhi-guo.Research on the Seismic Deformation Capacity of RC Bridge Columns[D].Harbin:Institute of Engineering Mechanics,China Earthquake Administration,2012(in Chinese)
[15]司炳君,孙治国,杜修力,等.钢筋混凝土桥墩地震弯剪破坏机理与震后快速修复技术研究[J].土木工程学报,2011,44(7):90~99Si Bing-jun,Sun Zhi-guo,Du Xiu-li,et al.Study on the Flexural-shear Damage Mechanisms and Rapid Repair Techniques for Earthquale Damage Bridge Piers[J].China Civil Engineering Journal,2011,44(7):90~99(in Chinese)
[16]杜修力,陈明琦,韩强.钢筋混凝土空心桥墩抗震性能试验研究[J].振动与冲击,2011,30(11):254~259Du Xiu-li,Chen Ming-qi,Han Qiang.Experimental Evaluation of Seismic Performance of Reinforced Concrete Hollow Bridge Columss[J].Journal of Vibration and Shock,2011,30(11):254~259(in Chinese)
[17]Sheikh S A,S D V,Khoury S S.Confinement of Highstrength Concrete Columns[J].ACI Struct J,1994,91(1):100~111
[18]Sheikh S A,K S S.Confined Concrete Columns with Stubs[J].ACI Struct J,1993,90(4):414~431
[19]司炳君,孙治国,任晓丹,等.钢筋混凝土桥墩滞回性能的有限元模拟分析[J].哈尔滨工业大学学报,2009,41(12):105~109Si Bing-jun,Sun Zhi-guo,Ren Xiao-dan,et al.Finte Element Analysis of the Hysteretic Behavior of Rcbridge Piers[J].Journal of Harbin Institute of Technolegy,2009,41(12):105~109(in Chinese)
[20]李正,李忠献.基于梁柱单元的钢筋混凝土桥墩地震损伤分析[J].天津大学学报,2011,44(3):189~195Li Zheng,Li Zhong-xian.Seismic Damage Analysis of Reinforced Concrete Bridge Piers Based on Beam-column Elements[J].Journal of Tianjin University,2011,44(3):189~195(in Chinese)
[21]艾庆华,王东升,向敏.基于纤维单元的钢筋混凝土桥墩地震损伤评价[J].计算力学学报,2011,28(5):737~742Ai Qing-hua,Wang Dong-sheng,Xiang Min.Seismic Damage Evaluation of Rcbridge Columns Based on Fiber Elements[J].Chinese Journal of Computational Mechanics,2011,28(5):737~742(in Chinese)