引文
[1]王亚勇,王言诃.汶川大地震建筑震害启示[J].建筑结构,2008,38(7):1―6.Wang Yayong,Wang Yanke.Lessons learnt frombuilding damages in the Wenchuan earthquake[J].Building Structures,2008,38(7):1―6.(in Chinese)
[2]王亚勇.汶川地震建筑震害启示——抗震概念设计[J].建筑结构学报,2008,29(4):20―25.Wang Yayong.Lessons learnt from building damages inthe Wenchuan earthquake——seismic concept design ofbuildings[J].Journal of Building Structures,2008,29(4):20―25.(in Chinese)
[3]清华大学、西南交通大学、北京交通大学土木工程结构专家组.汶川地震建筑震害分析[J].建筑结构学报,2008,29(4):1―9.Civil and Structural Groups of Tsinghua University,Xinan Jiaotong University and Beijing JiaotongUniversity.Analysis on seismic damage of buildings inthe Wenchuan earthquake[J].Journal of BuildingStructures,2008,29(4):1―9.(in Chinese)
[4]叶列平,曲哲,马千里,等.从汶川地震中框架结构震害谈“强柱弱梁”屈服机制的实现[J].建筑结构,2008,38(11):52―59.Ye Lieping,Qu Zhe,Ma Qianli,et al.Study on ensuringthe strong column-weak beam mechanism for RC framesbased on the damage analysis in the WenchuanEarthquake[J].Building Structures,2008,38(11):52―59.(in Chinese)
[5]蒋永生,陈忠范,周绪平,等.整浇梁板的框架节点抗震研究[J].建筑结构学报,1994,25(6):11―16.Jiang Yongsheng,Chen Zhongfan,Zhou Xuping,et al.Aseismic research on RC frame joint of monolithicallycasted slab[J].Journal of Building Structures,1994,25(6):11―16.(in Chinese)
[6]Canbolat B B,Wight J K.Experimental investigation onseismic behavior of eccentric reinforced concretebeam-column-slab connections[J].ACI StructuralJournal,2008,105(2):154―162.
[7]Shiohara H.New model for shear failure of RC interiorbeam-column connections[J].Journal of the StructuralEngineering,ASCE,2001,127(2):152―160.
[8]邢国华,刘伯权,吴涛.钢筋混凝土框架节点受剪承载力简化计算模型[J].建筑结构学报,2011,32(10):130―138.Xing Guohua,Liu Boquan,Wu Tao.Simplified modelfor shear bearing capacity of reinforced concrete framejoints[J].Journal of Building Structures,2011,32(10):130―138.(in Chinese)
[9]Jirsa J O.Shear in joints and other places[J].RecentDevelopments in Lateral Force Transfer in Buildings,SP157-3,ACI,1995,92:59―73.
[10]Hwang S J,Lee H J.Analytical model for predictingshear strengths of interior reinforced concretebeam-column joints for seismic resistance[J].ACIStructural Journal,2000,97(1):35―44.
[11]Hwang S J,Lee H J.Analytical model for predictingshear strengths of exterior reinforced concretebeam-column joints for seismic resistance[J].ACIStructural Journal,1999,96(5):846―857.
[12]Hwang S J,Lee H J.Strength prediction for discontinuityregions by softened strut-and-tie model[J].Journal of theStructural Engineering,ASCE,2002,128(12):1519―1526.
[13]Paulay T,Priestley M N J.Seismic design of reinforcedconcrete and masonry buildings[M].John Wiley&Sons,New York,1992:210―239.
[14]邢国华,刘伯权,吴涛.基于软化拉-压杆模型的钢筋混凝土框架节点受剪分析[J].建筑结构学报,2011,32(5):125―134.Xing Guohua,Liu Boquan,Wu Tao.Shear strength ofreinforced concrete frame joints using softened strut andtie model[J].Journal of Building Structures,2011,32(5):125―134.(in Chinese)
[15]NZS 3101:Part1,The design of concrete structures[S].New Zealand:Wellington,1982.
[16]GB50010-2010,混凝土结构设计规范[S].北京:中国建筑工业出版社,2010.GB 50010-2002,Code for design of concrete structures[S].Beijing:China Architectural&Building Press,2010.(in Chinese)
[17]刘伯权.关于钢筋混凝土框架抗震设计的几个问题[J].西北建筑工程学院学报,1994,11(1):1―3.Liu Boquan.About a few problems in aseismic design ofreinforced concrete frames[J].Journal of NorthwesternInstitute of Architectural Engineering,1994,11(1):1―3.(in Chinese)
[18]框架节点专题研究组.低周反复荷载作用下钢筋混凝土框架梁柱节点核心区抗剪强度的试验研究[J].建筑结构学报,1983,4(6):1―17.Research Group on Frame Joints.Shear strength ofreinforced concrete beam-column joints under lowreversed cyclic loading[J].Journal of BuildingStructures,1983,4(6):1―17.(in Chinese)
[19]赵成文,张殿惠,王天锡,等.反复荷载下高强混凝土框架内节点抗震性能试验研究[J].沈阳建筑工程学院学报,1993,9(3):260―268.Zhao Chengwen,Zhang Dianhui,Wang Tianxi,et al.Experimental study on the aseismic property of thebeam-column joints in high-strength concrete frameunder alternating load[J].Journal of ShenyangArchitectural and Civil Engineering Institute,1993,9(3):260―268.(in Chinese)
[20]傅剑平.钢筋混凝土框架节点抗震性能与设计方法研究[D].重庆:重庆大学,2002.Fu Jianping.Seismic behaviour and design of joints in areinforced concrete frame[D].Chongqing:ChongqingUniversity,2002.(in Chinese)
[21]吕西林,郭子雄,王亚勇.RC框架梁柱组合件抗震性能试验研究[J].建筑结构学报,2001,22(1):2―7.LüXilin,Guo Zixiong,Wang Yayong.Experimentalstudy on seismic behavior of beam-columnsubassemblages in RC frame[J].Journal of BuildingStructures,2001,22(1):2―7.(in Chinese)
[22]余琼,李思明.核心区和柱混凝土强度不等时节点的性能研究[J].同济大学学报(自然科学版),2004,32(12):1583―1588.Yu Qiong,Li Siming.Research on frame s joint thatconcrete strength of core is inferior to that of column[J].Journal of Tongji University(Natural Science),2004,32(12):1583―1588.(in Chinese)
[23]余琼,吕西林,陆洲导.框架节点反复荷载下的受力性能研究[J].同济大学学报(自然科学版),2004,32(10):1376―1381.Yu Qiong,LüXilin,Lu Zhoudao.Research on framesjoint property under low frequency reversed load[J].Journal of Tongji University(Natural Science),2004,32(10):1376―1381.(in Chinese)
[24]Otani S,Kitayama K,Aoyama H.Reinforced concreteinterior beam-column joints under simulated earthquakeloading[C]//Otani S.US-New Zealand-Japan Seminaron Design of Reinforced Concrete Beam-Column Joints.Monterey,Canada,1984:48―62.
[25]Meinheit D F,Jirsa J O.The shear strength of reinforcedconcrete beam-column joints[R].Austin:University ofTexas,1977.
[26]Beckingsale C W.Post elastic behavior of reinforcedconcrete beam-column joints[D].Christchurch,NewZealand:University of Canterbury,1980.
[27]Birss G R.The elastic behavior of earthquake resistantreinforced concrete interior beam-column joints[D].New Zealand:University of Canterbury,1978.
[28]Abrams D P.Scale relations for reinforced concretebeam-column joints[J].ACI Structural Journal,1987,84(6):502―512.