引文
[1]王梦恕,杨会军.地下水封岩洞油库设计、施工的基本原则[J].中国工程科学,2008,10(4):11-16.Wang Meng shu,Yang Hui jun.Basic principles for design and construction of underground water sealed hydrocarbon storage rock caverns[J].Engineering Science,2008,10(4):11-16.
[2]刘琦,卢耀如,张凤娥.地下水封储油库库址的水文地质工程地质问题[J].水文地质工程地质,2008,35(4):1-5.Liu Qi,Lu Yao ru,Zhang Feng e.Hydrogeological and engineering geological problems of the site of underground oil storage caverns with water curtain[J].Hydrogeology and Engineering Geology,2008,35(4):1-5.
[3]魏巍.洞室群围岩稳定性数值模拟分析[D].北京:北京交通大学,2010:1-2.
[4]王芝银,李云鹏,郭书太,等.大型地下储油洞粘弹性稳定性分析[J].岩土力学,2005,26(11):1705-1710.Wang Zhi yin,Li Yun peng,Guo Shu tai,et al.Viscoelastic stability analysis of underground petroleum storage caverns[J].Rock and Soil Me chanics,2005,26(11):1705-1710.
[5]范乾权,张赞牢,焦光伟,等.覆土油罐护体的动力模型建立与抗震性能分析[J].后勤工程学院学报,2010,26(1):54-57.Fan Qian quan,Zhang Zan lao,Jiao Guang wei,et al.Dynamic model establishing and anti seismic capability analysis of the buried oil tank wall[J].Journal of Logistical Engineering University,2010,26(1):54-57.
[6]郭青青.水工地下厂房岩体隧洞地震反应的初步分析[D].大连:大连理工大学,2009:1.
[7]张志国,肖明,陈俊涛.大型地下洞室地震灾变过程三维动力有限元模拟[J].岩石力学与工程学报,2011,30(3):509-523.Zhang Zhi guo,Xiao Ming,Chen Jun tao.Simulation of earthquake disaster process of large scale underground caverns using three dimensional dynamic finite element method[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(3):509-523.
[8]刘茂龙.城市地下空间开发中大型地下结构抗震性能的研究[D].广州:广州大学,2011:1.
[9]黄胜,陈卫忠,杨建平,等.地下工程地震动力响应及抗震研究[J].岩石力学与工程学报,2009,28(3):483-490.Huang Sheng,Chen Wei zhong,Yang Jian ping,et al.Research on earthquake induced dynamic respones and aseismic measures for under ground engineering[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(3):483-490.
[10]尤红兵,张郁山,赵风新.地震动峰值速度对地下隧洞内力的影晌研究[J].震灾防御技术,2011,6(2):105-115.You Hong bing,Zhang Yu shan,Zhao Feng xin.Influence of peak ground velocity on the internal force of underground tunnel[J].Technology for Earthquake Disaster Prevention,2011,6(2):105-115.
[11]郑颖人,肖强,叶海林,等.地震隧洞稳定性分析探讨[J].岩石力学与工程学报,2010,29(6):1081-1089.Zheng Ying ren,Xiao Qiang,Ye Hai lin,et al.Study of tunnel stability analysis with seismic load[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1081-1089.
[12]马秀让.油库设计实用手册[M].北京:中国石化出版社,2009:148.
[13]朱婉莉.地下油库工程罐室掘进施工技术[J].企业技术开发,2010,29(12):79-80.Zhu Wan li.Technology of tank chamber excavation during underground oil storage construction[J].Technological Development of Enterprise,2010,29(12):79-80.
[14]熊良宵,李天斌,刘勇.隧道地震响应数值模拟研究[J].地质力学学报,2007,13(3):255-260.Xiong Liang xiao,Li Tian bin,Liu Yong.Numerical simulation of seismic response at the entrance of the unsymmetrical loading tunnel[J].Jour nal of Geomechanics,2007,13(3):255-260.
[15]刘波,韩彦辉.FLAC原理、实例与应用指南[M].北京:人民交通出版社,2005:16.
[16]胡聿贤.地震工程学[M].2版.北京:地震出版社,2006:91-104.
[17]陈育民,徐鼎平.FLAC/FLAC3D基础与工程实例[M].北京:中国水利水电出版社,2008:199.
[18]张裕,刘元雪,王培勇,等.中隔板对单洞双层隧道抗震性能的影响[J].后勤工程学院学报,2012,28(6):1-7.Zhang Yu,Liu Yuan xue,Wang Pei yong,et al.Impact of the baffle plate on earthquake resistance of single hole double decked tunnel[J].Jour nal of Logistical Engineering University,2012,28(6):1-7.