引文
[1]岩义.建设五大体系创新现代电网运营模式[J].国家电网,2011(3):32-35.YAN Yi.Building five system of innovative modern power systemoperation mode[J].State Gird,2011(3):32-35.
[2]刘振亚.建设坚强智能电网支撑又好又快发展[J].电网与清洁能源,2009,25(9):1-3.LIU Zhen-ya.Build strong smart grid as pillar of sound and rapiddevelopment[J].Power System and Clean Energy,2009,25(9):1-3.
[3]谢开,刘永奇,朱治中,等.面向未来的智能电网[J].中国电力,2008,41(6):19-21.XIE Kai,LIU Yong-qi,ZHU Zhi-zhong,et al.The vision of futuresmart grid[J].Electric Power,2008,41(6):19-21.
[4]孙华东,王琦,卜广全,等.中国智能输电系统发展现状分析及建议[J].电网技术,2010,34(2):1-6.SUN Hua-dong,WANG Qi,BU Guang-quan,et al.Analyses andsuggestions on current development status of smart powertransmission systems in China[J].Power System Technology,2010,34(2):1-6.
[5]张巧玲,李西安.变电站二次典型设计中继电保护技术原则[J].中国电力,2009,42(6):46-50.ZHANG Qiao-ling,LI Xi-an.Protection technology principles fortypical design of substation secondary system[J].Electric Power,2009,42(6):46-50.
[6]崔文佳,吴云,刘志铎.全国电力规划地理信息系统的开发与应用[J].电力信息化,2007,5(1):78-81.CUI Wen-jia,WU Yun,LIU Zhi-duo.National power planninggeographic information system development and application[J].Electric Power Information Technology,2007,5(1):78-81.
[7]阎平,熊晓光,蒋荣安,等.应用高分辨率卫片三维选线平台进行规划选线[J].电力勘测设计,2008(4):2-5.YAN Ping,XIONG Xiao-guang,JIANG Rong-an,et al.Applicationof 3D digital simulative system of high-resolution satellite imagery inprogramming selection of transmission lines[J].Electric PowerSurvey&Design,2008(4):2-5.
[8]吴素良,范建勋,宋丽莉,等.陕西省冰区划分[J].电网技术,2010,34(4):152-157.WU Su-liang,FAN Jian-xun,SONG Li-li,et al.Regional division ofice zone in Shaanxi province based on thickness of ice accretion onconductors[J].Power System Technology,2010,34(4):152-157.
[9]于永清,李光范,李鹏,等.四川电网汶川地震电力设施受灾调研分析[J].电网技术,2008,32(11):72-76.YU Yong-qing,LI Guang-fan,LI Peng,et al.Investigation andanalysis of electric equipment damage in Sichuan power grid causedby Wenchuan earthquake[J].Power System Technology,2008,32(11):72-76.
[10]卢彩霞,徐柱,李木梓,等.Geodatabase模型的数据质量约束机制研究[J].测绘与空间地理信息,2011,34(4):36-39.LU Cai-xia,XU Zhu,LI Mu-zi,et al.Study on data qualitymechanism constraint in the Geodatabase data model[J].Geomatics&Spatial Information Technology,2011,34(4):36-39.
[11]冯晓良,徐学军,胡森,等.基于Geodatabase数据模型和Case工具设计实现配电GIS数据库[J].继电器,2007,35(10):59-63.FENG Xiao-liang,XU Xue-jun,HU Sen,et al.Design andrealization of distribution network data based on Geodatabase andCase tools[J].Relay,2007,35(10):59-63.
[12]李炳生,朱中耀,钱卫兵,等.海拉瓦技术在架空线工程规划中的应用研究[J].电力勘测设计,2008(5):23-27.LI Bing-sheng,ZHU Zhong-yao,QIAN Wei-bing,et al.Applicationof Helava technique on the transmission line engineering plan[J].Electric Power Survey&Design,2008(5):23-27.
[13]高毅,袁敬中,马志伟,等.基于海拉瓦技术的输电线路施工管理数字沙盘系统的开发与应用[J].电网技术,2007,31(21):22-26.GAO Yi,YUAN Jing-zhong,MA Zhi-wei,et al.Development andapplication of Helava technique based 3D digital simulative systemfor construction management of transmission lines[J].PowerSystem Technology,2007,31(21):22-26.
[14]杨海军,邵全琴.GIS空间分析技术在地理数据处理中的应用研究[J].地球信息科学,2007,9(5):70-75.YANG Hai-jun,SHAO Quan-qin.Consideration on GIS spatialanalysis in geospatial data processing[J].Geo-Information Science,2007,9(5):70-75.
[15]葛旭波,张卫东,李炳生,等.数字遥感技术在特高压工程前期选线工作中的应用[J].中国电力,2010,43(2):68-71.GE Xu-bo,ZHANG Wei-dong,LI Bing-sheng,et al.Application ofdigital remote sensing technology in design of UHV transmissionline[J].Electric Power,2010,43(2):68-71.