引文
[1]Nakashima M,Kato H,Takaoka E.Development of real-time pseudo dynamic testing[J].Earthquake Engineering and Structural Dynamics,1992,21:79-92.
[2]Horiuchi T,Inoue M,Konno T,et al.Real-time hybrid experimental system with actuator delay compensation and its application to a piping system with energy absorber[J].Earthquake Engineering and Structure Dynamics,1999,28(10):1121-1141.
[3]Darby A P,Blakeborough A,Williams D M.Realtime substructure tests using hydraulic actuator[J].Journal of Structural Engineering,1999,125(10):1133-1139.
[4]Wagg D J,Stoten D P.Substructuring of dynamical systems via the adaptive minimal control synthesis algorithm[J].Earthquake Engineering and Structural Dynamics,2001,30(6):865-877.
[5]Darby A P,Blakeborough A,Williams A M S.Improved control algorithm for real time substructure testing[J].Earthquake Engineering and Structural Dynamics,2001,30(3):431-448.
[6]Gawthrop P J,Wallace P J,Wagg M I.Bond-graph based substructuring of dynamical systems[J].Earthquake Engineering and Structural Dynamics,2005,34(6):687-703.
[7]Wallace M I,Sieber J,Neild S A,et al.Stability analysis of real-time dynamic substructuring using delay differential equation of models[J].Earthquake Engineering and Structural Dynamics,2005,34(15):1817-1832.
[8]Bayer V,Dorka U,Füllekrug U,et al.On real-time pseudodynamic substructure testing:algorithm,numerical and experimental results[J].Aerospace Science and Technology,2005,9:223-232.
[9]Wu B,Wang Q,Shing P B,et al.Equivalent force control method for generalized real-time substructure testing with implicit integration[J].Earthquake Engineering and Structural Dynamics,2007,36:11271149.
[10]Bonnet P A,Williams M S,Blakeborough A,et al.Real-time hybrid experiments with Newmark integration,MCSmd outer-loop control and multi-tasking strategies[J].Earthquake Engineering and Structural Dynamics,2001,36(1):119-141.
[11]Wagg D,Neild S,Gawthrop P J.Real-time testing with dynamic substructuring[M].Chapter Real-time Hybrid Testing Techniques.CISM,2008.
[12]Horiuchi T,Konno T.A new method for compensating actuator delay in real-time hybrid experiments.Philosophical Transactions of the Royal Society of London[J].Series A:Mathematical,Physical and Engineering Sciences,2001,359(1786):1893-1909.
[13]Darby A P,Williams D M,Blakeborough A.Stability and delay compensationfor real-time substructure testing[J].Journal of Engineering Mechanics,2002,128(12):1276-1284,2002.
[14]Neild S A,Stoten D P,Drury D,et al.Control issues relating to real-time substructuring experiments using a shaking table[J].Earthquake Engineering and Structural Dynamics,2005,34(9):1171-11192.
[15]Gawthrop P J,Neild S A,Gonzalez-Buelga A,et al.Causality in real time dynamic substructure testing[J].Mechatronics,2009,19(7):1105-1115.
[16]Wu B,Deng L,Yang X.Stability of central difference method for dynamic real-time substructure testing[J].Earthquake Engineering and Structural Dynamics,2009,38(14):1649-1663.
[17]Wu B,Xu G,Wang Q,et al.Operator-splitting method for real-time substructure testing[J].Earthquake Engineering and Structural Dynamics,2006,35(3):293-314.
[18]Wu B,Bao H,Ou J,et al.Stability and accuracy analysis of central difference method for real-time substructure testing[J].Earthquake Engineering and Structural Dynamics,2005,34:705-718.
[19]Bursi O S.Analysis of control techniques and development of numerical methods for heterogeneous simulations with dynamic substructuring[D].Department of Mechanical Engineering,University of Bristol,2007.
[20]Sajeeb R,Roy D,Manohar C S.Numerical aspects of a real-time substructuring technique in structural dynamics[J].International Journal for Numerical Methods in Engineering,2007,72(11):1261-1313.
[21]Shing P B.New approaches to analysis and testing of mechanical and structural systems[M].Chapter Real-time Hybrid Testing Techniques.CISM,2008.
[22]Bonnet P A,Williams M S,Blakeborough A.Evaluation of numerical time integration schemes for realtime hybrid testing[J].Earthquake Engineering and Structural Dynamics,2008,37(13):1467-1490.
[23]Bursi O S,Jia C,Vulcan L,et al.Rosenbrock-based algorithms and subcycling strategies for real-time nonlinear substructure testing[J].Earthquake Engineering and Structural Dynamics,2011,40(1):1-19.
[24]保海娥.实时子结构试验逐步积分方法的稳定性和精度[D].哈尔滨:哈尔滨工业大学,2005.Bao Haie.Stability and accuracy of time stepping integration methods for real-time substructure testing[D].Harbin:Harbin Institute of Technology,2005.
[25]吴斌.保海娥.实时子结构试验Chang方法的稳定性和精度[J].地震工程与工程振动,2006,26(2):41-48.Wu Bin,Bao Haie.Stability and accuracy of chang algorithm for real-time substructure testing[J].Earthquake Engineering and Engineering Vibration,2006,26(2):41-48.(in Chinese)
[26]Chang S Y.Explicit pseudodynamic algorithm with unconditional stability[J].Journal of Engineering Mechanics,2002,128(9):935-947.
[27]Chen C,Ricles J M.Development of direct integration algorithms for structural dynamics using discrete control theory[J].Journal of Engineering Mechanics,2008,134(8):676-683.
[28]Jung R Y,Shing P B,Stauffer E,et al.Performance of a real-time pseudodynamic test system considering nonlinear structural response[J].Earthquake Engineering and Structural Dynamics,2007,36(12):1785-1809.
[29]Nakashima M,Mesaoka N.Real-time On-line test for Mdof systems[J].Earthquake Engineering and Structural Dynamics,1999,28(4):393-420.
[30]Bursi O S,Gonzalez-Buelga A,Vulcan L,et al.Novel coupling Rosenbrock-based algorithms for realtime dynamic substructure testing[J].Earthquake Engineering and Structural Dynamics,2008,37:271288.
[31]Blakeborough A,Williams M S,Darby A P,et al.The development of real-time substructure testing[J].Philosophical Transactions:Mathematical,Physical and Engineering Sciences,2001,359(1786):18691891.
[32]Jia C,Bursi O S,Bonelli A,et al.Novel partitioned time integration methods for DAE systems based on Lstable linearly implicit algorithms[J].International Journal for Numerical Methods in Engineering,2011,87(12):1148-1182.
[33]Pegon P,Pinto A V.Pseudo-dynamic testing with substructuring applications at the ELSA laboratory[J].Earthquake Engineering and Structural Dynamics,2000,29(7):905-925.
[34]Pegon P,Magonette G.Continuous PSD testing with non-linear substructuring:Presentation of a stable parallel inter-field procedure[R].Technical Report I.02.167,E.C.,JRC,ELSA,Ispra,Italy,2002.
[35]Pegon P,Magonette G.Continuous PsD testing with non-linear substructuring:using the operator splitting technique to avoid iterative procedures[R].Technical Report SPI.05.30,E.C.,JRC,ELSA,Ispra,Italy,2005.
[36]Bursi O S,He L,Bonelli A,et al.Novel generalized-αmethods for interfield parallel integration of heterogeneous structural dynamic systems[J].Journal of Computational and Applied Mathematics,2010,234(7):2250-2258.
[37]迟福东.王进廷.金峰.实时耦联动力试验的时滞稳定性分析[J].工程力学,2009,27(9):12-16.Chi Fudong,Wang Jinting,Jin Feng.Delay-dependent stability analysis of real-time dynamic hybrid texting[J].Engineering Mechanics,2009,27(9):1216.(in Chinese)
[38]Nakashima M.Development,potential,and limitations of real-time online(pseudodynamic)test[J].Philosophical Transactions of the Royal Society,2001,359:1851-1867.
[39]Jia C.Monolithic and partitioned Rosenbrock-based time integration methods for dynamic substructure tests[D].Italy:University of Trento,2010.
[40]王进廷,汪强,迟福东,等.振动台实时耦联动力试验系统构建解决方案[J].地震工程与工程振动,2010,30(2):37-43.
[41]Williams M S,Blakeborough A.Laboratory testing of structures under dynamic loads:An introductory review[J].Philosophical Transactions:Mathematical,Physical and Engineering Sciences,2001,359(1786):1651-1669.
[42]Wallace M I,Wagg D J,Neild S A.An adaptive polynomial based forward prediction algorithm for multiactuator real-time dynamic substructuring[C].Proc.Royal Soc.A,2005,461:3807-3826.
[43]Morari M,Zariou E.Robust process control[M].Prentice Hall,1989.
[44]Jung R Y.Development of real-time hybrid system[D].University of Colorado,2005.
[45]Juang J,Minh Q.Identification and control of mechanical system[M].The Press Syndicate of The University of Cambridge,2001.
[46]Sivaselvan M V.A unified view of hybrid seismic simulation algorithms[C].Proceeding.8thU.S.National Conference on Earthquake Engineering,San Francisco,California,2006.
[47]Verma M,Rajasankar J.Improved model for realtime substructuring testing system[J].Engineering Structures,2012,41:258-269.
[48]Chen P,Tsai K.Dual compensation strategy for realtime hybrid testing[J].Earthquake Engineering and Structural Dynamics,2013,42(1):1-23.
[49]Gao X,Castaneda N,Dyke S J.Real time hybrid simulation:from dynamic system,motion control to experimental error[J].Earthquake Engineering and Structural Dynamics,2013,42(6):815-832.