摘要
对崇明越江隧道可行性研究方案工程沿线的不良地质现象分析评价,探讨软土地区不良地质现象对盾构法隧道设计施工的影响及其对策。
The paper analyzes the unfavorable geologic condition along the route of Chongming Tunnel (in feasibility study) and its effect to tunnel's design and construction. It also discusses the countermeasures to the unfavorable geologic condition in soft ground.