引文
[1]钱七虎,陈志龙,王玉北,等.地下空间科学开发与利用[M].南京:江苏科学技术出版社,2007:94-95.
[2]戚乐磊,赵鸿铁,梁若筠,等.双层隧道衬砌结构静力分析[J].西安建筑科技大学学报:自然科学版,2002,34(4):333-337.QI Le lei,ZHAO Hong tie,LIANG Ruo jun,et al.Static analysis of double deck tunnel lining[J].Journal of Xi’an University of Architecture&Technology:Natural Science Edition,2002,34(4):333-337.
[3]陈小良,刘元雪,李忠友.双层隧道中隔板的位置优化[J].地下空间与工程学报,2010,6(增2):1625-1628.CHEN Xiao liang,LIU Yuan xue,LI Zhong you.Optimal location research of the baffle plate on the double decked tunnel[J].Chinese Journal ofUnderground Space and Engineering,2010,6(Supp.2):1625-1628.
[4]陈小良,刘元雪,李忠友.双层隧道边墙位置研究[J].后勤工程学院学报,2010,26(6):12-16.CHEN Xiao liang,LIU Yuan xue,LI Zhong you.Research on the location of the lateral wall in the double deck tunnel[J].Journal of LogisticalEngineering University,2010,26(6):12-16.
[5]时亚昕,王明年,李强.单洞双层地铁隧道施工力学行为[J].岩石力学与工程学报,2006,25(增1):2985-2990.SHI Ya xin,WANG Ming nian,LI Qiang.Construction mechanical behavior of metro tunnel with single cavern and double layer[J].Chinese Jour nal of Rock Mechanics and Engineering,2006,25(Supp.1):2985-2990.
[6]牛泽林,李德武,王步云.伏龙坪双层隧道弹塑性有限元分析[J].兰州交通大学学报:自然科学版,2004,23(4):31-33.NIU Ze lin,LI De wu,WANG Bu yun.Analysis of Fulongping double decked tunnel with elasto plastic finite element[J].Journal of Lanzhou Jiao tong University:Natural Sciences,2004,23(4):31-33.
[7]牛泽林,李德武,王步云.伏龙坪双层隧道三维有限元分析[J].中南公路工程,2007,32(3):144-146,175.NIU Ze lin,LI De wu,WANG Bu yun.The analysis of Fu Longping double decked tunnel with 3D finite element[J].Central South Highway Engi neering,2007,32(3):144-146,175.
[8]林皋.地下结构抗震分析综述:上[J].世界地震工程,1990,5(2):1-10.
[9]林皋.地下结构抗震分析综述:下[J].世界地震工程,1990,5(3):1-10,42.
[10]陈磊,陈国兴.近断层强地震动下双层竖向重叠地铁隧道的地震反应[J].防灾减灾工程学报,2008,28(4):399-408.CHEN Lei,CHEN Guo xing.Seismic response of vertically double layered metro tunnels under near fault strong ground motion[J].Journal of Di saster Prevention and Mitigation Engineering,2008,28(4):399-408.
[11]潘建杰,王步云.双层隧道地震反应分析[J].工程设计与建设,2005,37(5):17-20.PAN Jian jie,WANG Bu yun.Seismic response analysis for double layer tunnel[J].Engineering Design and Construction,2005,37(5):17-20.
[12]戚乐磊,王步云,梁若筠,等.双层隧道内力分析[J].甘肃工业大学学报,2002,28(1):95-98.QI Le lei,WANG Bu yun,LIANG Ruo jun,et al.Analysis of internal force of double decked tunnel[J].Journal of Gansu University of Technology,2002,28(1):95-98.
[13]熊良宵,李天斌,刘勇.隧道地震响应数值模拟研究[J].地质力学学报,2007,13(3):255-260.XIONG Liang xiao,LI Tian bin,LIU Yong.Numerical simulation of seismic response at the entrance of the unsymmetrical loading tunnel[J].Journal of Geomechanics,2007,13(3):255-260.
[14]刘波,韩彦辉.FLAC原理、实例与应用指南[M].北京:人民交通出版社,2005:18-21.
[15]胡聿贤.地震工程学[M].北京:地震出版社,2006:91-104.
[16]李海波,刘博,吕涛,等.一种简单的岩体地下洞室地震安全评价方法[J].岩土力学,2009,30(7):1873-1882.LI Hai bo,LIU Bo,LüTao,et al.A simple safety assessment method for underground engineering in rock under seismic loading[J].Rock andSoil Mechanics,2009,30(7):1873-1882.
[17]焦冬雪,刘元雪,陆新.单洞双层隧道围岩力学特性分析[J].地下空间与工程学报,2009,5(增1):1388-1392.JIAO Dong xue,LIU Yuan xue,LU Xin.The mechanical property of surrounding rock about single cavern and double layer tunnel[J].ChineseJournal of Underground Space and Engineering,2009,5(Supp.1):1388-1392.