引文
[1]中华人民共和国交通运输部.JTG/T B02-01—2008公路桥梁抗震设计细则[S].北京:人民交通出版社,2008.
[2]中华人民共和国住房和城乡建设部.CJJ-166—2011城市桥梁抗震设计规范[S].北京:中国建筑工业出版社,2011.
[3]中华人民共和国住房和城乡建设部.GB 50111—2006铁路工程抗震设计规范[S].北京:中国计划出版社,2009.
[4]范立础,胡世德,叶爱君.大跨度桥梁抗震设计[M].北京:人民交通出版社,2001.
[5]卓杨,刘兹胜,吴锋,等.水平受荷桩桩-土作用的有限元分析[J].地下空间与工程学报,2009,5(S2):1554-1556,1561.ZHUO Yang,LIU Zi-sheng,WU Feng,et al.Finite Element Analysis on Pile-soil Interaction of Pile under Horizontal Load[J].Chinese Journal of Underground Space and Engineering,2009,5(S2):1554-1556,1561.
[6]龚纬,戚冬艳.桩基础简化模型在桥梁抗震中的应用[J].铁道工程学报,2008,25(10):20-24.GONG Wei,QI Dong-yan.Application of Simplified Model of the Pile Foundation in Earthquake Resistance of Bridge[J].Journal of Railway Engineering Society,2008,25(10):20-24.
[7]刘伟岸,叶爱君,王斌斌.大跨度桥梁桩基抗震简化模式的分析与探讨[J].结构工程师,2007,23(11):51-56.LIU Wei-an,YE Ai-jun,WANG Bin-bin.Discussion on Seismic Simplified Modes of Pile Foundation in Long-span Bridges[J].Structural Engineers,2007,23(11):51-56.
[8]刘钊,谭皓,文武松,等.连续刚构桥的群桩基础计算模型研究[J].桥梁建设,2005,35(6):1-4.LIU Zhao,TAN Hao,WEN Wu-song,et al.Research of Calculation Models for Group Pile Foundation of Continuous Rigid Frame Bridge[J].Bridge Construction,2005,35(6):1-4.
[9]周海林,冷伍明,刘宝琛.群桩基础桥墩的自振特性计算[J].中国铁道科学,2001,22(3):51-55.ZHOU Hai-lin,LENG Wu-ming,LIU Bao-chen.Computation of Dynamic Behavior of Bridge Pier Supported by Group Piles[J].China Railway Science,2001,22(3):51-55.
[10]周敉,王君杰,袁万城,等.基于精细有限元分析的猎德大桥抗震性能评价[J].同济大学学报:自然科学版,2008,36(2):143-148.ZHOU Mi,WANG Jun-jie,YUAN Wan-cheng,et al.Seismic Performance Assessment of Liede Bridge Based on Detailed Finite Element Analysis[J].Journal of Tongji University:Natural Science,2008,36(2):143-148.
[11]李小珍,刘孝寒,刘德军,等.考虑桩-土相互作用的连续刚构桥车桥耦合振动分析[J].振动与冲击,2011,30(12):54-58.LI Xiao-zhen,LIU Xiao-han,LIU De-jun,et al.Coupled Vibration Analysis of a Railway Continuous Rigid-frame Bridge and Vehicles with Soil-structure Interaction[J].Journal of Vibration and Shock,2011,30(12):54-58.
[12]邓育林,彭天波,李建中,等.大跨度三塔悬索桥动力特性及抗震性能研究[J].振动与冲击,2008,27(9):105-110.DENG Yu-lin,PENG Tian-bo,LI Jian-zhong,et al.Study on Dynamic Characteristic and Seismic Performance of a Long-span Triple-tower Suspension Bridge[J].Journal of Vibration and Shock,2008,27(9):105-110.
[13]边学成.高速列车荷载作用下高架桥和地基振动分析[J].振动工程学报,2006,19(4):438-445.BIAN Xue-cheng.Analysis of Viaduct-ground Vibration due to High-speed Train Moving Loads[J].Journal of Vibration Engineering,2006,19(4):438-445.
[14]LUO X,MURONO Y,TANAMURA S.Seismic Performance Assessment of Existing Pile Group Foundation[J].QR of RTRI,2001,42(3):136-142.
[15]TAKASE N,IKEGAME M,TANAMURA S,et al.Seismic Design of Pile Foundation[J].QR of RTRI,1999,40(3):152-157.
[16]KAPPOS A J,SEXTOS A G.Effect of Foundation Type and Compliance on Seismic Response of RC Bridges[J].Journal of Bridge Engineering,ASCE,2001,6(2):120-130.
[17]焦驰宇,张恺,张连普,等.考虑支座摩擦和墩柱损伤的桥梁用液体粘滞阻尼器参数确定方法[J].振动与冲击,2013,32(6):127-131.JIAO Chi-yu,ZHANG Kai,ZHANG Lian-pu,et al.Parameter Determination Method for Fluid Viscous Damper Used in Bridges Considering Bearing Friction and Pier Damage[J].Journal of Vibration and Shock,2013,32(6):127-131.
[18]韩鹏,王君杰,何剑,等.高架桥梁抗震设计的弹塑性反应谱法[J].哈尔滨工程大学学报,2013,34(4):1-8.HAN Peng,WANG Jun-jie,HE Jian,et al.Elasto-plastic Response Spectrum Analysis in the Seismic Design of Viaducts[J].Journal of Harbin Engineering University,2013,34(4):1-8.
[19]陈兴冲,朱晞.有限元通用程序中耦联弹簧的处理方法[J].兰州铁道学院学报,1998,17(4):1-3.CHEN Xing-chong,ZHU Xi.Simulating Method for the Coupled Spring in the Common FEM Program[J].Journal of Lanzhou Railway Institute,1998,17(4):1-3.
[20]李克钏.基础工程[M].北京:中国铁道出版社,1995.
[21]中华人民共和国铁道部.TB 10002.5—2005铁路桥涵地基和基础设计规范[S].北京:中国铁道出版社,2005.