引文
[1]CIB.Risk assessment and risk communication in civilengineering[R].CIB Report WG32.2001.
[2]Alexius V.Lessons from incidents and failures of damconstructions:Safety,risk and reliability—trends inengineering[R].Malta:IABSE,2001:735-740.
[3]Howard H M.Hwang.Seismic probabilistic riskassessment and seismic margins studies for nuclear powerplants[J].Probabilistic Engineering Mechanics,1988,3(4):170―178.
[4]Lupoil A,Franchin P,Schotanus M.Seismic riskevaluation of RC bridge structures[J].Journal ofEarthquake Engineering and Structural Dynamics,2003,32:1275―1290.
[5]Malla S.Safety and reliability of the cable-system ofcable-stayed bridges under stochastic earthquake loading[D].Bangkok(Thailand):Asian Institute of Technology,1988.
[6]Khan R A,Datta T K,Ahmad S.Seismic risk analysis ofmodified fan type cable stayed bridges[J].EngineeringStructures,2006,28(9):1275―1285.
[7]Mander J B,Dhakal R P,Mashiko N,Solberg K M.Incremental dynamic analysis applied to seismic financialrisk assessment of bridges[J].Engineering Structures,2007,29(10):2662―2672.
[8]陶履彬,李永盛,冯紫良,等.工程风险分析理论与实践:上海崇明越江通道工程风险分析[M].上海:同济大学出版社,2006.Tao Lubin,Li Yongsheng,Feng Ziliang,et al.Project riskanalysis theory and practice:Shanghai Chongmingcross-river channel engineering[M].Shanghai:TongjiUniversity Press,2006.(in Chinese)
[9]乔美丽,杜进生,王开健.大跨连续刚构桥施工期间地震风险分析[J].公路交通科技,2010,27(11):78―82.Qiao Meili,Du Jinsheng,Wang Kaijian.Analysis ofseismic risk for long-span continuous rigid-frame bridgesduring construction[J].Journal of Highway andTransportation Research and Development,2010,27(11):78―82.(in Chinese)
[10]吕大刚,于晓辉,潘峰,等.基于改进云图法的结构概率地震需求分析[J].世界地震工程,2010,26(1):7―15.LuDagang,Yu Xiaohui,Pan Feng,et al.Probabilisticseismic demand analysis of structures based on animproved cloud method[J].World EarthquakeEngineering,2010,26(1):7―15.(in Chinese)
[11]吕大刚,于晓辉,王光远.基于FORM有限元可靠度方法的结构整体概率抗震能力分析[J].工程力学,2012,29(2):1―8.Lu Dagang,Yu Xiaohui,Wang Guangyuan.Globalprobabilistic seismic capacity analysis of structures basedon form finite element reliability method[J].EngineeringMechanics,2012,29(2):1―8.(in Chinese)
[12]沈怀至,金峰,张楚汉.基于性能的重力坝-地基系统地震易损性分析[J].工程力学,2008,25(12):86―92.Shen Huaizhi,Jin Feng,Zhang Chuhan.Erformance-basedeismic fragility analysis of concrete gravity-foundation system[J].Engineering Mechanics,2008,25(12):86―92.(in Chinese)
[13]吴巧云,朱宏平,樊剑.基于性能的钢筋混凝土框架结构地震易损性分析[J].工程力学,2012,29(9):117―125.Wu Qiaoyun,Zhu Hongping,Fan Jian.Performance-based seismic fragility analysis of RC[J].EngineeringMechanics,2012,29(9):117―125.(in Chinese)
[14]黄明刚.钢筋混凝土连续梁桥的地震易损性、危险性及风险分析[D].哈尔滨:哈尔滨工业大学,2009.Huang Mingang.Seismic vulnerability,risk and riskanalysis for Reinforced concrete continuous beam bridge[D].Harbin:Harbin Institute of Technology,2009.(inChinese)
[15]冯清海.特大桥梁地震易损性与风险概率分析[D].上海:同济大学,2008.Feng Qinghai.Seismic vulnerability and risk probabilityanalysis for large bridge[D].Shanghai:Tongji University,2008.(in Chinese)
[16]Mackie K,Stojadinovic B.Seismic demands forperformance-based design of bridges[D].PacificEarthquake Engineering Research Center,University ofCalifornia,Berkeley,2003.
[17]Hoshino N,Takemura A.On reduction of finite samplevariance by extended Latin hypercube sample[J].Bernoulli,2000,6(6):1035―1050.
[18]高小旺,鲍霭斌.地震作用的概率模型及其统计参数[J].地震工程与工程振动,1985,5(1):13―22.Gao Xiaowang,Bao Aibin.Probabilistic model and itsstatistical parameters for seismic load[J].EarthquakeEngineering and Engineering Vibration,1985,5(1):13―22.(in Chinese)
[19]刘恢先,卢荣俭,陈达生,等.修订我旧地震烈度表的一个建议方案[R].中国科学院工程力学研究所地震工程研究报告集(第4集).北京:科学出版社,1981:1―13.Liu Huixian,Lu Rongjian,Chen Dasheng,et al.Aproposal of the amendments to the old seismic intensityscale[J].Earthquake Engineering Research Report ofChinese Academy of Sciences,Institute of EngineeringMechanics(4th)[R].Beijing:Science Press,1981:1―13.(in Chinese)
[20]刘贞荣.关于地震烈度与地震加速度峰值的模糊关系的研究[J].地震工程与工程振动,1982,2(3):29―42.Liu Zhenrong.Computational invstigation on fuzzyrelation between earthquake intensity and peakacceleration of ground motion[J].EarthquakeEngineering and Engineering Vibration,1982,2(3):29―42.(in Chinese)
[21]Menegotto M,Pinto P E.Method of analysis forcyclically loaded reinforced concrete plane framesincluding changes in geometry and non-elastic behaviorof elements under combined normal force and bending[C]//Proceedings of the IABSE Symposium onResistance and Ultimate Deformability of Structures,Lisbon,1973:15―22.
[22]郑文婷.矮塔斜拉桥结构地震风险概率评估[D].福州:福州大学,2011.Zheng Wenting.Seismic probabilistic risk assessment oflower-tower Cable-stayed bridge[D].Fuzhou:FuzhouUniversity,2011.(in Chinese)
[23]Hwang H,Liu J,Chiu Y.Seismic fragility analysis ofhighway bridges[R].Center for Earthquake Research andInformation,the University of Memphis,Memphis(TN),2001.
[24]阮欣.桥梁工程风险评估体系及关键问题研究[D].上海:同济大学,2006.Ruan Xin.Study on bridge engineering risk assessmentsystem and the key issues[D].Shanghai:TongjiUniversity,2006.(in Chinese)