引文
[1]李建林,冯起.西北地区泥石流沟形态因素的非线性分析——以兰州市为例.干旱区地理[J],2006,29(5):658~662.Li Jianlin,Feng Qi.Nonlinear Analysis of morphology of debris flowgully in arid and semiarid region in northwestern China:A casestudy in Lanzhou city.Arid Land Geography,2006,29(5):658~662.
[2]李俊才,胡卸文.金沙江向家坝库区泥石流发育状况及其沟谷形态的非线性特征[J].山地学报,2001,19(1):29~32.Li Juncai,Hu Xiewen.Debris howdistribution and nonlinear prop-erty of its gully form in Xiangjiaba Reservoir area Jinsha river.Journal of Mountain Science,2001,19(1):29~32.
[3]蒋忠信,西藏帕隆藏布的泥石流沟谷纵剖面形态统计分析[J].中国地质灾害与防治学报,2001,12(4):41~47.Jiang Zhongxin.A statistical analysis on longitudinal profile shapeof debris flow valley along Palongzangbu river in Tibet.The Chi-nese Journal of Geological Hazard and Control,2001,12(4):41~47.
[4]铁永波,唐川,周春花.基于信息熵理论的泥石流沟谷危险度评价[J].灾害学2005:20(4):43~46.Tie Yongbo,Tang Chuan,Zhou Chunhua.information entropy-based hazard assessment of debris flow gully.Journal of Catastrop-hology,2005,20(4):43~46.
[5]张明,殷跃平,吴树仁,等.高速远程滑坡-碎屑流运动机理研究发展现状与展望[J].工程地质学报,2010,18(6):805~817.Zhang Ming,Yin Yueping,Wu Shuren,et al.Development statusand prospects of studies on kinematics of long runout rock ava-lanches.Journal of Engineering Geology,2010,18(6):805~817.
[6]G.B.Crosta,S.Imposimato,D.G.Roddeman.Numerical modellingof entrainment/deposition in rock and debris~avalanches.Engi-neering Geology[J].2009,109,135~145.
[7]黄润秋,裴向军,李天斌.汶川地震触发大光包巨型滑坡基本特征及形成机理分析[J].工程地质学报,2008,16(6):730~741.Huang Runqiu,Pei Xiangjun,Li Tianbin.Basic characteristics andformation mechanism of the largest scale landslide at Daguangbaooccurred during the Wenchuan earthquake.Journal of EngineeringGeology,2008,16(6):730~741.
[8]唐红梅.危岩拦石墙计算方法研究[J].中国地质灾害与防治学报,2005,16(3):12~15.Tang Hongmei.Research on calculation method of volley-unstablerock retaining wall.The Chinese Journal of Geological Hazard andControl,2005,16(3):12~15.
[9]夏元友,朱瑞赓.黄石市板岩山危岩体防治方案决策分析[J].岩石力学与工程学报,2000,19(4):498~500.Xia Yuanyou,Zhu Ruigeng.Analysis of control decision-making ofunstable rock mass in Banyan Mountain,Huangshi city.ChineseJournal of Rock Mechanics and Engineering,2000,19(4):498~500.
[10]陈洪凯,唐红梅,胡明,等.危岩锚固计算方法研究[J].岩石力学与工程学报,2005,24(8):1,321~1,327.Chen Hongkai,Tang Hongmei,Hu Ming,et al.Research on an-chorage calculation method for unstable rock.Chinese Journal ofRock Mechanics and Engineering,2005,24(8):1,321~1,327.
[11]黄润秋,刘卫华.滚石在平台上的运动特征分析[J].地球科学进展,2008,23(5):517~523.Huang Runqiu,Liu Weihua.Study on the movement characteris-tics of rolling rock block on platform.Advances in Earth Science,2008,23(5):517~523.
[12]Randall W.Jibson,Edwin L.Harp,William Schulz.et al.Largerock avalanches triggered by the M 7.9 Denali Fault,Alaska,earthquake of 3 November 2002[J].Engineering Geology.2006(83):144~160.
[13]Mikos,M.,R.Fazarinc,et al.Sediment production and deliveryfrom recent large landslides and earthquake-induced rock falls inthe Upper Soca River Valley,Slovenia[J].Engineering Geology86(2-3):198~210.
[14]殷跃平,汶川地震地质与滑坡概论[M].北京:地质出版社,2009.Yin Yueping.Grate Wenchuan Earthquake:Seismogeology andLandslides Hazards.Beijing:Geological PublishingHouse,2009.
[15]伍法权,胡瑞林,岳中琦,等.5.12汶川地震地质灾害[M].北京:地质出版社,2009.Wu Faquan,Hu Ruilin,Yue Zhongqi,et al.Wenchuan Earth-quake Geohazards.Beijing:Geological Publishing House,2009.
[16]黄润秋,刘卫华.平台对滚石停积作用试验研究[J].岩石力学与工程学报,2009,28(3):516~524.Huang Runqiu,Liu Weihua.Platform resistant test on rolling rockblocks.Chinese Journal of Rock Mechanics and Engineering,2009,28(3):516~524.
[17]Yoichi Okura,Hikaru Kitahara,Toshiaki Sammori,et al.Theeffects of rockfall volume on runout distance[J].EngineeringGeology,2000,(58):109~124.
[18]何思明,吴永,李新坡.滚石冲击碰撞恢复系数研究[J].岩土力学,2009,30(3):623~627.He Siming,Wu Yong,Li Xinpo,Research on restitution of rockfall.Rock and Soil Mechanics,2009,30(3):623~627.
[19]吕庆,孙红月,翟三扣,等.边坡滚石运动的计算模型[J].自然灾害学报,2003,12(2):9~84.Lv Qing,Sun Hongyue,Zhai Sankou,et a1.Valuation models ofrockfall trajectory.Journal of Natural Disasters,2003,12(2):9~8.