引文
[1]殷跃平.汶川八级地震滑坡特征分析[J].工程地质学报,2009,17(1):29-38.YIN Yue-ping.Features of Landslides Triggered by the Wenchuan Earthquake[J].Journal of Engineering Geology,2009,17(1):29-38.
[2]黄润秋,李为乐.“5.12”汶川大地震触发地质灾害的发育分布规律研究[J].岩石力学与工程学报,2008,27(12):2585-2592.HUANG Run-qiu,LI Wei-le.Research on Development and Distribution Rules of Geohazards Induced by Wenchuan Earthquake on 12th May,2008[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(12):2585-2592.
[3]彭建兵,马润勇,范文,等.汶川大震的科学思考[J].地球科学与环境学报,2009,31(1):1-29.PENG Jian-bing,MA Run-yong,FAN Wen,et al.Science Contemplation for Wenchuan Earthquake of 12May,2008[J].Journal of Earth Sciences and Environment,2009,31(1):1-29.
[4]赵洲,侯恩科,王建智.汶川震区陕西省宁强县滑坡灾害危险性分析与评价[J].西安科技大学学报,2012,32(5):548-555.ZHAO Zhou,HOU En-ke,WANG Jian-zhi.Research on Landslide Hazard in Ningqiang County of Wenchuan Earthquake Affected Area[J].Journal of Xi'an University of Science and Technology,2012,32(5):548-555.
[5]苏生瑞,张永双,李松,等.汶川地震引发高速远程滑坡运动机理数值模拟研究——以谢家店子滑坡为例[J].地球科学与环境学报,2010,32(3):277-287.SU Sheng-rui,ZHANG Yong-shuang,LI Song,et al.Numerical Analysis on Motion Mechanism of Highspeed and Long Runout Landslide by Wenchuan Earthquaketaking Xiejiadianzi Landslide as an Example[J].Journal of Earth Sciences and Environment,2010,32(3):277-287.
[6]谢和平,邓建辉,李碧雄.四川芦山地震灾害调查与灾后重建的相关问题分析[J].地球科学与环境学报,2013,35(2):1-7.XIE He-ping,DENG Jian-hui,LI Bi-xiong.Investigation of Lushan Earthquake Disasters and Analysis of Related Problems During Post-quake Reconstruction in Sichuan[J].Journal of Earth Sciences and Environment,2013,35(2):1-7.
[7]陈晓清,崔鹏,游勇,等.4·20芦山地震次生山地灾害与减灾对策[J].地学前缘,2013,20(3):29-34.CHEN Xiao-qing,CUI Peng,YOU Yong,et al.Secondary Mountain Disasters Induced by the 4·20 Lushan Earthquake and Disaster Mitigation[J].Earth Science Frontiers,2013,20(3):29-34.
[8]王运生,全清,罗永红,等.四川芦山Ms7.0级地震的地质环境影响分析[J].地球科学与环境学报,2013,35(2):92-98.WANG Yun-sheng,QUAN Qing,LUO Yong-hong,et al.Geological Environmental Influence of Lushan Ms7.0Earthquake in Sichuan[J].Journal of Earth Sciences and Environment,2013,35(2):92-98.
[9]兰恒星,周成虎,高星,等.四川雅安芦山地震灾区次生地质灾害评估及对策建议[J].地理科学进展,2013,32(4):499-504.LAN Heng-xing,ZHOU Cheng-hu,GAO Xing,et al.Secondary Geological Hazard Assessment and Hazard Mitigation Countermeasures in Lushan,Ya'an Earthquake,Sichuan Province[J].Progress in Geography,2013,32(4):499-504.
[10]李军,曾鹦,李妍峰.基于汶川地震的震后交通受损评估研究[J].管理评论,2008,20(12):35-40.LI Jun,ZENG Ying,LI Yan-feng.Study on the Assessment of Post-earthquake Traffic Damage Based on Wenchuan Earthquake[J].Management Review,2008,20(12):35-40.
[11]张孝伦,张瑜洁.汶川地震公路抢修与保畅主要措施[J].武汉工业学院学报,2009,28(1):80-84.ZHANG Xiao-lun,ZHANG Yu-jie.Main Measures of the Repair and Keeping Expedite of the Post-earthquake Road in Wenchuan[J].Journal of Wuhan Polytechnic University,2009,28(1):80-84.
[12]刘金龙,林均岐,刘如山,等.芦山“4·20”地震公路交通系统震害调查分析[J].自然灾害学报,2013,22(3):18-23.LIU Jin-long,LIN Jun-qi,LIU Ru-shan,et al.Investigation and Analysis of Seismic Damage of Highway System in Lushan“4·20”Earthquake[J].Journal of Natural Disasters,2013,22(3):18-23.
[13]康亚明,杨明成,胡艳香,等.基于重度增加法的边坡稳定性三维有限元分析[J].建筑科学与工程学报,2006,23(4):49-53.KANG Ya-ming,YANG Ming-cheng,HU Yan-xiang,et al.3-D FEM Analysis of Slope Stability Based on Gravity Increase Method[J].Journal of Architecture and Civil Engineering,2006,23(4):49-53.
[14]李家春,崔世富,田伟平.公路边坡降雨侵蚀特征及土的崩解试验[J].长安大学学报:自然科学版,2007,27(1):23-26,49.LI Jia-chun,CUI Shi-fu,TIAN Wei-ping.Erosion Characteristic of Road Slope and Test of Soil Disintegration[J].Journal of Chang'an University:Natural Science Edition,2007,27(1):23-26,49.
[15]赵红,折学森,卢和全,等.边坡滚石破坏及防护技术研究[J].中国公路学报,2013,26(3):65-69.ZHAO Hong,SHE Xue-sen,LU He-quan,et al.Re-search on Rolling Stone Damage of Slope and Protective Technique[J].China Journal of Highway and Transport,2013,26(3):65-69.
[16]黄高花,王飞,杨勤科.陕西北部山丘区公路开挖边坡侵蚀调查与评价[J].长安大学学报:自然科学版,2006,26(2):31-33.HUANG Gao-hua,WANG Fei,YANG Qin-ke.Evaluation of Cutting-slope Erosion of Highway in North Shaanxi[J].Journal of Chang'an University:Natural Science Edition,2006,26(2):31-33.
[17]付宏渊,曾铃,蒋中明,等.降雨条件下公路边坡暂态饱和区发展规律[J].中国公路学报,2012,25(3):59-64.FU Hong-yuan,ZENG Ling,JIANG Zhong-ming,et al.Developing Law of Transient Saturated Areas of Highway Slope Under Rainfall Conditions[J].China Journal of Highway and Transport,2012,25(3):59-64.
[18]柳厚祥,廖雪,李宁,等.公路边坡稳定性分析的二维变分方法[J].中国公路学报,2007,20(4):7-11.LIU Hou-xiang,LIAO Xue,LI Ning,et al.2-D Variational Method of Highway Slope Stability Analysis[J].China Journal of Highway and Transport,2007,20(4):7-11.
[19]徐世强,折学森,王思长.高速公路坡面滚石自由飞落分析模型[J].交通运输工程学报,2011,11(2):14-17.XU Shi-qiang,SHE Xue-sen,WANG Si-chang.Free Rolling Model of Stone on Expressway Slope[J].Journal of Traffic and Transportation Engineering,2011,11(2):14-17.
[20]徐则民.基于失稳机制的岩质路基边坡加固方案优化[J].中国公路学报,2008,21(6):7-13.XU Ze-min.Optimization of Reinforced Project of Rock Slopes Based on Instability Mechanisms[J].China Journal of Highway and Transport,2008,21(6):7-13.
[21]陈鹏,徐博侯.顺层岩质路堑边坡稳定性数值极限分析[J].交通运输工程学报,2012,12(2):38-45.CHEN Peng,XU Bo-hou.Numerical Limit Analysis of Stability for Bedding Rock Cutting Slope[J].Journal of Traffic and Transportation Engineering,2012,12(2):38-45.
[22]王思长,折学森,李毅,等.基于尖点突变理论的岩质边坡稳定性分析[J].交通运输工程学报,2010,10(3):23-27.WANG Si-chang,SHE Xue-sen,LI Yi,et al.Stability Analysis of Rock Slope Based on Cusp CatastropheTheory[J].Journal of Traffic and Transportation Engineering,2010,10(3):23-27.
[23]田伟平,马保成,舒淼.山区沿河公路路基水毁灾害易损性评价[J].自然灾害学报,2011,20(5):125-130.TIAN Wei-ping,MA Bao-cheng,SHU Miao.Vulnerability Assessment of Subgrade Flood-damage of Highway Along River in Mountainous Areas[J].Journal of Natural Disasters,2011,20(5):125-130.
[24]齐信,唐川,陈州丰,等.地质灾害风险评价研究[J].自然灾害学报,2012,21(5):33-40.QI Xin,TANG Chuan,CHEN Zhou-feng,et al.Research of Geohazards Risk Assessment[J].Journal of Natural Disasters,2012,21(5):33-40.
[25]陈远川,陈洪凯.山区沿河公路地质风险形成机制[J].灾害学,2012,27(3):6-11.CHEN Yuan-chuan,CHEN Hong-kai.Formation Mechanism of Geological Risk of Mountainous Highway Along River[J].Journal of Catastrophology,2012,27(3):6-11.
[26]郭跃,朱芳,赵卫权,等.自然灾害社会易损性评价指标体系框架的构建[J].灾害学,2010,25(4):68-72.GUO Yue,ZHU Fang,ZHAO Wei-quan,et al.Construction of Framework of Evaluation Index System of Social Vulnerability to Natural Disasters[J].Journal of Catastrophology,2010,25(4):68-72.
[27]UNDRO.Mitigating Natural Disasters:Phenomena,Effects and Options:A Manual for Policy Makers and Planners[R].New York:UNDRO,1991.
[28]ALEXANDER D.Natural Disasters:A Framework for Research and Teaching[J].Disasters,1991,15(3):209-226.
[29]LIAM FINN W D.Geotechnical Aspects of the Estimation and Mitigation of Earthquake Risk[M]∥TUCKER B E,ERDIK M,HWANG C N.Issues in Urban Earthquake Risk.Dordrecht:Kluwer,1993:35-77.
[30]BULL W B,KING J,KONG F C,et al.Lichen Dating of Coseismic Landslide Hazards in Alpine Mountains[J].Geomorphology,1994,10(1/2/3/4):253-264.
[31]STOFFEL M.A Review of Studies Dealing with Tree Rings and Rockfall Activity:The Role of Dendrogeomorphology in Natural Hazard Research[J].Natural Hazards,2006,39:51-70.
[32]ROMEO R,FLORIS M,VENERI F.Area-scale Landslide Hazard and Risk Assessment[J].Environmental Geology,2006,51(1):1-13.
[33]KEEPER D K.Landslides Caused by Earthquakes[J].GSA Bulletin,1984,95(4):406-421.
[34]JIBSON R W,HARP E L,MICHAEL J A.A Method for Producing Digital Probabilistic Seismic Landslide Hazard Maps:An Example from the Los Angeles,California Area[R].Denver:US Geological Survey,1998.
[35]孔纪名,韩培峰,张引.基于地球多传感器网络信息的潜在滑坡判识模型[J].地球科学与环境学报,2013,35(1):97-102.KONG Ji-ming,HAN Pei-feng,ZHANG Yin.Potential Landslide Discrimination Model Based on Information of Earth Multi-sensor Net[J].Journal of Earth Sciences and Environment,2013,35(1):97-102.
[36]李家春,田伟平,陈建壮.公路边坡水毁灾害等级快速评估方法[J].长安大学学报:自然科学版,2006,26(2):27-30.LI Jia-chun,TIAN Wei-ping,CHEN Jian-zhuang.Rapid Assessment of Highway Slope Disaster Caused by Rainfall[J].Journal of Chang'an University:Natural Science Edition,2006,26(2):27-30.
[37]颜可珍,廖华容.基于突变理论的路基边坡冲刷稳定性评价[J].长安大学学报:自然科学版,2011,31(2):29-32,41.YAN Ke-zhen,LIAO Hua-rong.Assessment of Scouring Stability on Subgrade Slope Based on Catastrophe Theory[J].Journal of Chang'an University:Natural Science Edition,2011,31(2):29-32,41.
[38]胡瑞林,范林峰,王珊珊,等.滑坡风险评价的理论与方法研究[J].工程地质学报,2013,21(1):76-84.HU Rui-lin,FAN Lin-feng,WANG Shan-shan,et al.Theory and Method for Landslide Risk Assessmentcurrent Status and Future Development[J].Journal of Engineering Geology,2013,21(1):76-84.
[39]唐波,刘希林,尚志海.城市灾害易损性及其评价指标[J].灾害学,2012,27(4):6-11.TANG Bo,LIU Xi-lin,SHANG Zhi-hai.Vulnerability of Urban Disasters and Its Evaluation Index[J].Journal of Catastrophology,2012,27(4):6-11.
[40]唐波,刘希林,李元.珠江三角洲城市群灾害易损性时空格局差异分析[J].经济地理,2013,33(1):72-78.TANG Bo,LIU Xi-lin,LI Yuan.Hazard Vulnerability Analysis of the Spatial Temporal Pattern Differences in Pearl River Delta Urban Agglomerations[J].Economic Geography,2013,33(1):72-78.
[41]吴越,刘东升,陆新,等.承灾体易损性评估模型与滑坡灾害风险度指标[J].岩土力学,2011,32(8):2487-2492.WU Yue,LIU Dong-sheng,LU Xin,et al.Vulnerability Assessment Model for Hazard Bearing Body and Landslide Risk Index[J].Rock and Soil Mechanics,2011,32(8):2487-2492.
[42]陈新宇,卢新中,王琛.昆明市地质灾害易损性模糊综合评价[J].安全与环境工程,2012,19(2):54-57.CHEN Xin-yu,LU Xin-zhong,WANG Chen.Fuzzy Comprehensive Evaluation for the Geological Disaster Vulnerability of Kunming City[J].Safety and Environmental Engineering,2012,19(2):54-57.
[43]王雁林,郝俊卿,赵法锁,等.汶川地震陕西重灾区地质灾害风险区划探讨[J].灾害学,2011,26(4):35-39.WANG Yan-lin,HAO Jun-qing,ZHAO Fa-suo,et al.A Discussion on Regional Risk Zoning of Geological Hazard in the Worst-hit Area of the Wenchuan Earthquake in Shaanxi Province[J].Journal of Catastrophology,2011,26(4):35-39.
[44]高华喜,殷坤龙.基于GIS的滑坡灾害风险空间预测[J].自然灾害学报,2011,20(1):31-36.GAO Hua-xi,YIN Kun-long.GIS-based Spatial Prediction of Landslide Hazard Risk[J].Journal of Natu-ral Disasters,2011,20(1):31-36.
[45]张永兴,陈云,文海家,等.边坡灾害风险评估系统研究及应用[J].重庆建筑大学学报,2008,30(1):30-33.ZHANG Yong-xing,CHEN Yun,WEN Hai-jia,et al.The Research of Landslide Hazard Assessment System[J].Journal of Chongqing Jianzhu University,2008,30(1):30-33.
[46]张雷,顾文红,王晓雪,等.高等级公路边坡工程风险因子识别及评估[J].地下空间与工程学报,2007,3(7):1265-1268.ZHANG Lei,GU Wen-hong,WANG Xiao-xue,et al.Risk Factors Identification and Evaluation for Slopes in Highway Engineering[J].Chinese Journal of Underground Space and Engineering,2007,3(7):1265-1268.
[47]张勇慧,李红旭,盛谦,等.山区公路岩质边坡危险源安全性评价研究[J].公路,2010(2):55-59.ZHANG Yong-hui,LI Hong-xu,SHENG Qian,et al.A Study on Safety Assessment of Rock Slope Hazard of Mountain Highway[J].Highway,2010(2):55-59.
[48]JTG D20—2006,公路路线设计规范[S].JTG D20—2006,Design Specification for Highway Alignment[S].