引文
[1]陈淮,李杰.高压电气设备抗震可靠性分析方法[J].世界地震工程,2000,16(2):19-23.CHEN Huai,LI Jie.Seismic reliability analysis of high voltage electrical equipments[J].World Earthquake Engineering,2000,16(2):19-23.
[2]程永锋,朱全军,卢智成.变电站电力设施抗震措施研究现状与发展趋势[J].电网技术,2008,32(22):84-89.CHENG Yongfeng,ZHU Quanjun,LU Zhicheng.Progress and development trend on seismic measures of electric power equipments in transformer substation[J].Power System Technology,2008,32(22):84-89.
[3]杨少勇,赵建国.电力系统地震灾害预防技术综述[J].电网技术,2010,34(8):57-63.YANG Shaoyong,ZHAO Jianguo.An overview on prevention technology of earthquake disaster for power grids[J].Power System Technology,2010,34(8):57-63.
[4]李亚琦,李小军,刘锡荟.电力系统抗震研究概况[J].世界地震工程,2002,18(4):79-84.LI Yaqi,LI Xiaojun,LIU Xihui.A summary on the seismic analysis in the electrical system[J].World Earthquake Engineering,2002,18(4):79-84.
[5]范荣全,曹枚根,卓越,等.高压断路器抗震能力分析及抗震减震措施[J].高压电器,2012,48(3):12-16.FAN Rongquan,CAO Meigen,ZHUO Yue,et al.Analysis on aseismic capacity of high voltage breaker and a seismic measures[J].High Voltage Apparatus,2012,48(3):12-16.
[6]VANZI I.Seismic reliability of electric power networks:methodology and application[J].Structural Safety,1996,18(4):311-327.
[7]THORNBERRY L R,HARDY R.Seismic simulation test program on type CGCB 230 k V disconnect switch[R].Ala:Wyle Laboratories,1997.
[8]于永清,李光范,李鹏,等.四川电网汶川地震电力设施受灾调研分析[J].电网技术,2008,32(11):1-6.YU Yongqing,LI Guangfan,LI Peng,et al.Investigation and analysis of electric equipment damage in Sichuan power grid caused by wenchuan earthquake[J].Power System Technology,2008,32(11):1-6.
[9]XIE Qiang,ZHU Ruiyuan.Damage to electric power grid infrastructure caused by natural disasters in China[J].IEEE Power and Energy Magazine,2011,9(2):28-36.
[10]尤红兵,赵凤新.庐山.7.0级地震及电力设施破坏原因分析[J].电力建设,2013,34(8):100-104.YOU Hongbing,ZHAO Fengxin,LU Shan.M7.0 earthquake in Lushan and damage cause analysis of power facilities[J].Electric Power Construction,2013,34(8):100-104.
[11]林莘,史可鉴,徐建源.特高压HGIS设备抗震性能分析[J].沈阳工业大学学报:(社会科学版),2013,35(2):121-125.LIN Xin,SHI Kejian,XU Jianyuan.Analysis on seismic performance of ultra-high voltage HGIS equipment[J].Journal of Shenyang University of Technology(Social Science Edition),2013,35(2):121-125.
[12]GB/T 13540—2009高压开关设备和控制设备的抗震要求[S].2009.GB/T 13540—2009 Seismic qualification for high voltage switchgear and controlgear[S].2009.
[13]GB/T 2424.25—2000电工电子产品环境试验第三部分:试验导则地震试验方法[S].2000.GB/T 2424.25—2000 Environmental testing for electric and electronic products—Part3:Test guidance—Seismic test methods[S].2000.
[14]GB 50260—2013电力设施抗震设计规范[S].2013.GB 50260—2013 Code for seismic design of electrical installations[S].2013.
[15]李洪泉,高占阳,陈飞.陶板幕墙抗震性能振动台试验研究[J].世界地震工程,2012,28(3):11-14.LI Hongquan,GAO Zhanyang,CHEN Fei.Shaking table test on seismic behavior of ceramic plate curtain wall[J].World Earthquake Engineering,2012,28(3):11-14.
[16]楼丹,武奇.72.5 k V气体绝缘开关设备的抗震计算分析[J].高压电器,2013,49(6):78-80.LOU Dan,WU Ji.Anti-seismic analysis of 72.5 k V gas insulated switchgear[J].High Voltage Apparatus,2013,49(6):78-80.
[17]谢强,王健生,杨雯,等.220 k V断路器抗震性能地震模拟振动台试验[J].电力建设,2011,32(10):10-14.XIE Qiang,WANG Jiansheng,YANG Wen,et al.Shake table test on seismic performance of 220 k V circuit breaker[J].Electric Power Construction,2011,32(10):10-14.
[18]曹枚根,周福霖,谭平,等.地震作用下断路器动力时程分析及阻尼效应研究[J].高压电器,2010,46(7):27-35.!!!C!A O!!Me!ig!en!,Z!H!OU!F!u!lin!,T!AN!!Pi!ng!,e!t a!l.!A!na!lys!is!on!dynamic time-history of circuit breaker and damping ratio effect under earthquake[J].High Voltage Apparatus,2010,46(7):27-35.
[19]柳永玉,王均梅,王晓琪,等.500 k V电流互感器抗震性能分析[J].世界地震工程,2010,26(1):219-223.LIU Yongyu,WANG Junmei,WANG Xiaoqi,et al.Seismic performance analysis of 500 k V current mutual transformer[J].World Earthquake Engineering,2010,26(1):219-223.
[20]赵阳,黄新波,朱海涛,等.智能高压开关柜IED设计[J].陕西电力,2014,42(7):69-74.ZHAO Yang,HUANG Xinbo,ZHU Haitao,et al.Design on intelligent electronic device of high voltage switchgear[J].2014,42(7):69-74.
[21]顾云霞,孙海文,金虎.TEV与超声波法在开关柜局部放电检测中的应用[J].陕西电力,2012,40(12):12-16.GU Yunxia,SUN Haiwen,JIN Hu.Probe into partial discharge detection and location of switchgear based on TEV and ultrasonic wave methods[J].Shaanxi Electric Power2012,40(12):12-16.
[22]ANG A S,PIRES J,VILLAVERDE R,et al.Seismic probabilistic reliability assessment of electric power transmission systems[J].Reliability Engineering and System Safety,1996,51(1):7-12.
[23]IEEE Std 693—2005 Recommended practice for seismic design of substations[S].2005.
[24]张杰,马宏伟.矿用高压开关柜的弧光监测与保护系统[J].电力系统保护与控制,2013,41(11):141-145.ZHANG Jie,MA Hongwei.Online monitoring and protection system for the arc fault of the mining high-voltage switchgear[J].Power System Protection and Control,2013,41(11):141-145