引文
[1]中国科学院青藏高原综合科学考察队.西藏地貌[M].北京:科学出版社,1983:2-5.
[2]中国科学院青藏高原综合科学考察队.西藏自然地理[M].北京:科学出版社,1982:47-51.
[3]程尊兰,朱平一,党超.藏东南冰湖溃决泥石流灾害及其发展趋势[J].冰川冻土,2008,30(6):954-959.CHENG Zunlan,ZHU Pingyi,DANG Chao.Hazards ofdebris flow due to glacier-lake outburst in southeasternTibet[J].Journal of Glaciology and Geocryology,2008,30(6):954-959.
[4]钟大赉,丁林.青藏高原的隆起过程及其机制探讨[J].中国科学:D辑,1996,26(4):289-295.ZHONG Dalai,DING Lin.Discussion on the processand mechanism of Tibet Plateau uplift[J].Science inChina:Series D,1996,26(4):289-295.
[5]李廷栋,陈炳蔚,戴维声.青藏高原地质图系[M].广州:广东科技出版社,2010:1.
[6]闻学泽,ALLEN C R,罗灼礼,等.鲜水河全新世断裂带的分段性、几何特征及其地震构造意义[J].地震学报,1989,11(4):362-371.WEN Xueze,ALLEN C R,LUO Zhuoli,et al.Segmentation,geometric features and theirseismotectonic implications for the Holocene Xianshuihefault zone[J].Acta Seismologica Sinica,1989,11(4):362-371.
[7]唐荣昌,韩渭宾.四川活动断裂与地震[M].北京:地震出版社,1993:241-242.
[8]杨永林,苏琴.鲜水河断裂带现今运动特征研究[J].大地测量与地球动力学,2007,27(6):22-27.YANG Yonglin,SU Qin.On present activitycharacteristics of Xianshuihe fault zone[J].Journal ofGeodesy and Geodynamics,2007,27(6):22-27.
[9]池田俊雄.活断層と新神戸駅の基礎[J].応用地質,1971,12(2):77-82.IKEDA T.Active fault and foundation design for ShinKobe railway station structures[J].Applied Geology,1971,12(2):77-82.
[10]杨明,姚令侃,王广军.桩间土拱效应离心模型试验及数值模拟研究[J].岩土力学,2008,29(3):817-822.YANG Ming,YAO Lingkan,WANG Guangjun.Studyof centrifuge model tests and numerical simulation onsoil arching in space of piles[J].Rock and SoilMechanics,2008,29(3):817-822.
[11]崔鹏,何思明,姚令侃,等.汶川地震山地灾害形成机理与风险控制[M].北京:科学出版社,2011:1.
[12]唐超,姚令侃,孙晓丹.穿越断裂带线路地表变形震害模式分析与定线策略[J].铁道标准设计,2011(9):12-16.TANG Chao,YAO Lingkan,SUN Xiaodan.Earthquake surface deformation damage mode analysisand route design strategy for railways crossing faultzone[J].Railway Standard Design,2011(9):12-16.
[13]DAVIS W M.Plains of marine and sub-aerialdenudation[J].Geological Society of AmericaBulletin,1986,10(7):378-398.
[14]姚令侃,黄艺丹,杨庆华.地震触发崩塌滑坡自组织临界性研究[J].四川大学学报:工程科学版,2010,42(5):33-43.YAO Lingkan,HUANG Yidan,YANG Qinghua.Onthe self-organized criticality of landslides triggered byearthquake[J].Journal of Sichuan University:Engineering Science Edition,2010,42(5):33-43.
[15]李勇,黄润秋,DENSMORE A L,等.汶川8.0级地震的基本特征及其研究进展[J].四川大学学报:工程科学版,2009,41(3):7-25.LI Yong,HUANG Runqiu,DENSMORE A L,et al.Basic features and research progresses of WenchuanMs 8.0 earthquake[J].Journal of Sichuan University:Engineering Science Edition,2009,41(3):7-25.
[16]中国地震局地震现场应急工作队.玉树7.1级地震断层地表破裂带和地质灾害调查报告[R/OL].http://www.mlr.gov.cn.
[17]殷跃平,张永双,马寅生,等.青海玉树Ms7.1级地震地质灾害主要特征[J].工程地质学报,2010,18(3):289-296.YIN Yueping,ZHANG Yongshuang,MA Yinsheng,etal.Research on major characteristics of geohazardsinduced by the Yushu Ms7.1 earthquake[J].Journalof Engineering Geology,2010,18(3):289-296.
[18]田连权.四川炉霍地震泥石流[C]∥泥石流(3).重庆:科学技术文献出版社重庆分社,1986:58-66.
[19]中国科学院青藏高原综合科学考察队.西藏冰川[M].北京:科学出版社,1986:15.
[20]邱燕玲,姚令侃,秦伟.汶川地震路基挡墙震害特征分析[J].重庆交通大学学报:自然科学版,2010,29(4):576-581.QIU Yanling,YAO Lingkan,QIN Wei.Characteristicanalysis of the damaged retaining wall in Wenchuanearthquake[J].Journal of Chongqing JiaotongUniversity:Natural Science,2010,29(4):576-581.
[21]中华人民共和国交通运输部.汶川地震公路震害图集[M].北京:人民交通出版社,2009:9-11.
[22]何振宁.铁路地质选线及主要技术原则[C]∥朱颖.复杂艰险山区铁路选线与总体设计论文集.北京:中国铁道出版社,2010:97-102.
[23]朱颖,魏永幸.高烈度地震山区铁路综合选线原则研究[C]∥朱颖.复杂艰险山区铁路选线与总体设计论文集.北京:中国铁道出版社,2010:8-16.
[24]NAKAMURA Y.UrEDAS,urgent earthquakedetection and alarm system,now and future[C]∥Proceeding of 13th World Conference on EarthquakeEngineering.Vancouver:[s.n.]:2004.
[25]朱平一,何子文,汪阳春,等.川藏公路典型山地灾害研究[M].成都:成都科技大学出版社,1999:71.
[26]罗德富,冯清华,朱平一,等.川藏公路南线(西藏境内)山地灾害及防治对策[M].北京:科学出版社,1995:120-135.
[27]程尊兰,田金昌,张正波,等.藏东南冰湖溃决泥石流形成的气候因素与发展趋势[J].地学前缘,2009,16(6):207-214.CHENG Zunlan,TIAN Jinchang,ZHANG Zhengbo,et al.Debris flow induced by glacial-lake break insoutheast Tibet[J].Earth Science Frontiers,2009,16(6):207-214.
[28]丁一汇.中国西部环境演变评估综合报告(第2卷):中国西部环境变化的预测[M].北京:科学出版社,2002:39.
[29]秦大河.中国西部环境演变评估综合报告[M].北京:科学出版社,2002:61-65.
[30]柴贺军,刘汉超,张倬元.中国堵江滑坡发育分布特征[J].山地学报,2002,18(增刊):51-54.CHAI Hejun,LIU Hanchao,ZHANG Zhuoyuan.Thetemporal-spatial distribution of damming landslides inChina[J].Journal of Mountain Science,2002,18(Sup.):51-54.