引文
[1]BLISS E C,HERRER A A.Bacardi building—An unusual structure for an unusual building[J].J ACI,1965,62(12):1521-1531.
[2]BABICKI B.Cables support office building[J].Civil Engin ASCE,1971,41(10):64-67.
[3]刘郁馨,吕志涛.单段核筒悬挂结构频率响应分析[J].南京建筑工程学院学报,1999(4):1-9.LIU Y X,LV Z T.Analysis of frequency response for core-tube suspension building in one section hanger[J].J Nanjing Arch Civil Engin Ins,1999(4):1-9.
[4]刘郁馨,吕志涛.多高层悬挂建筑结构及应用[J].工程力学,1999,24(10):468-473.LIU Y X,LV Z T.Multi-story building structure and application of suspension[J].Mechan Eng,1999,24(10):468-473.
[5]刘郁馨,吕志涛,袁发顺.多高层砼悬挂建筑结构及受力性质[J].工程力学,1996,19(3):542-546.LIU Y X,LV Z T,YUAN F S.Multi-story concrete building structure and suspension force nature[J].Mechan Engin,1996,19(3):542-546.
[6]刘郁馨,吕志涛,袁发顺.中央核筒悬挂建筑结构分析[J].南京建筑工程学报,1998(1):1-6.LIU Y X,LV Z T,YUAN F S.Analysis for central core-tube suspended building structures[J].J Nanjing Arch Civil Engin Ins,1998(1):1-6.
[7]周坚,伍孝波.高层建筑悬挂结构体系振动控制[J].北京建筑工程学院学报,2003,19(3):29-34.ZHOU J,WU X B.Vibration control on suspension structure of high-Rise building[J].J Beijing Ins Civil Engin Arch,2003,19(3):29-34.
[8]赵艳秋.悬挂式结构核筒的受力分析[D].南京:后勤工程学院,1988.ZHAO Y Q.Stress analysis of the structure of nuclei suspended barrel[D].Nanjing:Log Engin Univ,1988.
[9]张晖,朱伯龙,苏少军.悬挂结构层间减震控制系统试验及分析[J].建筑结构学报,1997,18(5):20-24.ZHANG H,ZHU B L,SU S J.Reserech on vibration absorption control system of suspension structure[J].J Build Struct,1997,18(5):20-24.
[10]邓志恒,秦荣,谢肖札.悬挂阻尼控制结构体系巨型框架地震响应分析[J].世界地震工程,2001,17(3):30-35.DENG Z H,QING R,XIE X Z.The seismic response analysis of mega-frame with suspension damping control systems[J].WIEE,2001,17(3):30-35.
[11]阮含婷.附加阻尼的悬挂式巨型钢框架支撑体系的静、动力分析[D].镇江:江苏科技大学,2008.RUAN H T.Static and dynamic analysis of additional damping of hanging giant steel frame support system[D].Zhenjiang:Jiangsu Univ Sci Tech,2008.
[12]王春林,吕志涛.核筒悬挂结构的动力特性及参数优化[J].东南大学学报:自然科学版,2007,37(2):1-5.WANG C L,LV Z T.Dynamic behavior and parameter optimization of core-tube suspension structures[J].J Southeast Univ:Nat Sci Edi,2007,37(2):1-5.
[13]叶芳芳.大悬挑悬挂混合结构的施工控制[D].长沙:中南大学,2009.YE F F.Large cantilever construction control suspension hybrid structure[D].Changsha:Cent South Univ,2009.
[14]许立山.CCTV主楼预应力混凝土悬挂柱施工技术[J].施工技术,2010,39(12):23-26.XU L S.Construction technology of prestressed concrete suspension column in CCTV main building[J].Cons Tech,2010,39(12):23-26.
[15]戴立先,魏晓祥,蒋官业,等.贵阳国际会展中心大型不对称筒式悬挂建筑施工应力控制[J].施工技术,2011,40(350):18-21.DAI L X,WEI X X,JIANG G Y,et al.Construction stress control of large symmetric tube suspension building of Guiyang International Conference Center[J].Cons Tech,2011,40(350):18-21.
[16]程媛,张伟才,李金果.某悬挂结构施工模拟分析[J].工程建设与设计,2012(6):168-173.CHENG Y,ZNANG W C,LI J G.Sequential construction analysis of a suspended structure[J].Cons Design Pro,2012(6):168-173.
[17]敖学侣.型钢混凝土大悬挑结构施工全过程模拟分析[D].重庆:重庆大学,2012.AO X L.Large cantilevered steel structure construction concrete analysis of the whole process simulation[D].Chongqing:Chongqing Univ,2012.
[18]李延涛,姚丽婷,苏幼坡,等.核筒-悬挂体结构地震动力反应分析[J].工程抗震与加固改造,2014,36(2):100-106.LI Y T,YAO L T,SU Y P,et al.An analytical study on seismic responses for core-tube with suspension structures[J].Ear Res Engin Retro,2014,36(2):100-106.
[19]刘坚.钢结构高等分析的二阶非弹性理论与应用[M].北京:科学出版社,2012.LIU J.Second order inelastic theory and application of advanced analysis of steel structures[M].Beijing:Science Press,2012.