引文
[1]付文光,杨志银.深圳地区基坑工程30年发展综述[J].岩土工程学报,2010,32(增2):562-565.(FU Wen-guang,YANG Zhi-yin.Summaries of Excavation Pit Engineering in Shenzhen in Recent 30 Years[J].Chinese Journal of Geotechnical Engineering,2010,32(Sup.2):562-565.(in Chinese))
[2]董必昌,邱红胜.双排桩对边坡稳定影响分析的仿真研究[J].武汉理工大学学报(交通科学与工程版),2007,31(3):502-505.(DONG Bi-chang,QIU Hong-sheng.Simulation Study on Stability of Slope with Double-row Piles[J].Journal of Wuhan University of Technology(Transportation Science&Engineering),2007,31(3):502-505.(in Chinese))
[3]聂庆科,胡建敏,吴刚.深基坑双排桩支护结构上的变形和土压力研究[J].岩土力学,2008,29(11):3089-3094.(NIE Qing-ke,HU Jian-min,WU Gang.Deformation and Earth Pressure of a Double-row Piles Retaining Structure for Deep Excavation[J].Rock and Soil Mechanics,2008,29(11):3089-3094.(in Chinese))
[4]刘泉声,付建军.考虑桩土效应的双排桩模型及参数研究[J].岩土力学,2011,32(2):481-486.(LIU Quan-sheng,FU Jian-jun.Research on Model and Parameters of Double-row Piles Based on Effect of Pile-soil Contact[J].Rock and Soil Mechanics,2011,32(2):481-486.(in Chinese))
[5]何颐华,杨斌,金宝森,等.双排护坡桩试验与计算的研究[J].建筑结构学报,1996,17(2):58-66.(HE Yi-hua,YANG Bin,JIN Bao-sen,et al.A Study of the Test and Calculation of Double-row Fender Piles[J].Journal of Building Structures,1996,17(2):58-66.(in Chinese))
[6]杜秀忠,杨光华,孙昌利,等.双排桩支护在某水利基坑中的应用[J].岩土工程学报,2012,34(增1):490-494.(DU Xiu-zhong,YANG Guang-hua,SUN Chang-li,et al.Application of Retaining Structure with Double-row Piles in a Hydraulic Excavation[J].Chinese Journal of Geotechnical Engineering,2012,34(Sup.1):490-494.(in Chinese))
[7]孙涛,刘俊岩,刘燕.双排桩支护排距的优化研究[J].岩土工程学报,2012,34(增1):616-620.(SUN Tao,LIU Jun-yan,LIU Yan.Optimal Row Distance of Retaining Structure with Double-row Piles[J].Chinese Journal of Geotechnical Engineering,2012,34(Sup.1):616-620.(in Chinese))
[8]王军,王磊,肖昭然.双排桩支护排距的有限元分析与研究[J].地下空间与工程学报,2005,1(6):1096-1099.(WANG Jun,WANG Lei,XIAO Zhaoran.Analysis of the Interval between Double-row Piles by Finite Element Method[J].Chinese Journal of Underground Space and Engineering,2005,1(6):1096-1099.(in Chinese))
[9]钱同辉,陈芳,程周炳,等.框架式双排抗滑桩结构性能研究[J].长江科学院院报,2011,28(11):91-95.(QIAN Tong-hui,CHEN Fang,CHENG Zhoubing,et al.Analysis on the Performance of Double-row Anti-Slide Frame-Piles[J].Journal of Yangtze River Scientific Research Institute,2011,28(11):91-95.(in Chinese))
[10]杨保全,丘滨,陈先威.双排桩结构特性及桩体位移有限元计算分析[J].长江科学院院报,2009,26(7):52-55.(YANG Bao-quan,QIU Bin,CHEN Xian-wei.Deformation Analysis of Double Row Piles by Finite Element Method[J].Journal of Yangtze River Scientific Research Institute,2009,26(7):52-55.(in Chinese))
[11]史海莹,龚晓南.深基坑悬臂双排桩支护的受力性状研究[J].工业建筑,2009,46(10):67-71.(SHI Hai-ying,GONG Xiao-nan.Study on the Behavior of Cantilever Double-row Plies Supporting Deep Excavation[J].Industrial Construction,2009,46(10):67-71.(in Chinese))
[12]应宏伟,初振环,李冰河,等.双排桩支护结构的计算方法研究及工程应用[J].岩土力学,2007,28(6):1145-1150.(YING Hong-wei,CHU Zhenhuan,LI Bing-he,et al.Study on Calculation Method of Retaining Structure with Double-row Piles and Its Application[J].Rock and Soil Mechanics,2007,28(6):1145-1150.(in Chinese))
[13]白冰,聂庆科,吴刚,等.考虑空间效应的深基坑双排桩支护结构计算模型[J].建筑结构学报,2010,31(8):118-124.(BAI Bing,NIE Qing-ke,WU Gang,et al.A Calculation Model for Double-rowpile Retaining Structures in Deep Foundation Pit Considering 3D Effects[J].Journal of Building Structures,2010,31(8):118-124.(in Chinese))
[14]秦四清,万林海,汤天鹏,等.深基坑工程优化设计[M].北京:地震出版社,1998.(QIN Si-qing,WAN Lin-hai,TANG Tian-peng,et al.Optimizing Design on Deep Excavation[M].Beijing:Seismological Press,1998.(in Chinese))