引文
[1]刘广钧.狮子洋隧道过小虎沥水道施工技术[J].现代隧道技术,2012,49(1):126-131Liu Guangjun.Construction Technique for the Shiziyang Tunnel Passing through the Xiaohuli Waterway[J].Modern Tunnelling Tech-nology,2012,49(1):126-131
[2]任建川,陈旭,姜淑香.地下洞室围岩稳定判定分析[J].东北水利水电,2009,27(5):5-6Ren Jianchuan,Chen Xu,Jiang Shuxiang.Stability Analysis about Surrounding Rock of Underground Excavation[J].Water Resources&Hydropower of Northeast China,2009,27(5):5-6
[3]张文新,孙韶峰,刘虹,等.木寨岭隧道高地应力软岩大变形施工技术[J].现代隧道技术,2011,48(2):78-82Zhang Wenxin,Sun Shaofeng,LiuHong,etal.Construction Techniques of Muzhailing Tunnel with High Ground Stresses and Large SoftRock Deformations[J].Modern Tunnelling Technology,2011,48(2):78-82
[4]谢润成,周文,陶莹,王世泽,姚娟,邓辉.有限元分析方法在现今地应力场模拟中的应用[J].石油钻探技术,2008,36(2):60-63Xie Runcheng,Zhou Wen,Tao Ying,Yao Juan,Deng Hui.Application of Finite Element Analysis in the Simulation of the In-situStress Field[J].Petroleum Drilling Techniques,2008,36(2):60-63
[5]朱伯芳著.有限单元法原理与应用[M].北京:中国水利水电出版社,1998Zhu Bofang.The Finite Element Method Theory and Applications[M].Beijing:China WaterPower Press,1998
[6]杨志法,等著.岩土工程反分析原理及应用[M].北京:地震出版社,2002Yang Zhifa,et al.Back Analysis Principle of Geotechnical Engineering and Its Application[M].Beijing:Seismological Press,2002
[7]贾善坡,伍国军.岩土工程非线性优化反演模型在ABAQUS中的应用[J].沈阳建筑大学学报(自然科学版),2010,26(2):225-231Jia Shanpo,Wu Guojun.Nonlinear Optimum Inversion Model of Geotechnical Engineering and Its Application in ABAQUS[J].Journalof Shenyang Jianzhu University(Natural Science),2010,26(2):225-231
[8]朱合华,张晨明,王建秀,丁文其.龙山双连拱隧道动态位移反分析与预测[J].岩石力学与工程学报,2006,25(1):67-73Zhu Hehua,Zhang Chenming,Wang Jianxiu,Ding Wenqi.Dynamic Displacement Back Analysis and Prediction of Longshan Two-Arcade Twin Tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(1):67-73
[9]张川,刘新宇.位移反演分析在城市公路隧道施工中的应用研究[J].岩石力学与工程学报,2003,22(z1):2280-2283Zhang Chuan,Liu Xinyu.Application of Displacement Back Analysis to Construction of City-Highway Tunnel[J].Chinese Journal ofRock Mechanics and Engineering,2003,22(z1):2280-2283
[10]倪绍虎,肖明.基于围岩松动圈的地下工程参数场位移反分析[J].岩石力学与工程学报,2009,28(7):1439-1446Ni Shaohu,Xiao Ming.Displacement Back Analysis of Parameter Field in Underground Engineering based on Excavation DamagedZone of Surrounding Rock[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(7):1439-1446
[11]许建聪.降雨作用下浅埋隧道支护参数正交反演分析[J].地下空间与工程学报,2008,4(5):897-905Xu Jiancong.Orthogonal Back-Analysis of Surrounding Rock Support Parameters for Shallow Buried Tunnel under Rainfall[J].Chi-nese Journal of Underground Space and Engineering,2008,4(5):897-905
[12]何磊,杨斌,王更峰,等.高地应力软岩隧道施工动态控制与优化研究[J].现代隧道技术,2011,48(2):44-48He Lei,Yang Bin,Wang Gengfeng,et al.Research on Construction Dynamic Control and Optimization of a Tunnel in Soft Rock underHigh In-situ Stresses[J].Modern Tunnelling Technology,2011,48(2):44-48
[13]李云鹏,韩常领,唐明明,杨腾骏,司振民.小间距隧道围岩力学参数正交设计反演[J].公路交通科技,2008,25(9):107-111Li Yunpeng,Han Changling,Tang Mingming,Yang Tengjun,Si Zhenmin.Back Analysis on Mechanical Parameters of SurroundingRock of Tunnel with Small Spacing using Orthogonal Design[J].Journal of Highway and Transportation Research and Development,2008,25(9):107-111
[14]王建宇,胡元芳,刘志强,等.高地应力软弱围岩隧道挤压型变形和可让性支护原理[J].现代隧道技术,2012,49(3):9-17Wang Jianyu,Hu Yuanfang,Liu Zhiqiang,etal.Tunneling in Squeezing Ground with Yielding Supports[J].Modern Tunnelling Tech-nology,2012,49(3):9-17