引文
[1]肖明.地下洞室施工开挖三维动态过程数值模拟分析[J].岩土工程学报,2000,22(4):422-426.(XIAO Ming.Three-dimensional numerical model of construction process for underground opening[J].Chinese Journal of Geotechnical Engineering,2000,22(4):422-426.(in Chinese))
[2]朱维申,李术才,陈卫忠,等.清江水布垭工程地下厂房围岩锚固方案优化研究[J].岩石力学与工程学报,2003,22(增1):2 127-2 131.(ZHU Weisheng,LI Shucai,CHEN Weizhong,et al.Optimazation of reinforcing scheme for underground powerhouse of Shuibuya project on Qingjiang River[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(Supp.1):2 127-2 131.(in Chinese))
[3]王克忠,蔡美峰.西龙池地下洞室围岩的现场监测及其稳定性分析[J].岩石力学与工程学报,2005,24(增2):5 956-5 960.(WANG Kezhong,CAI Meifeng.In-situ monitoring and stability analysis of surrounding rock mass of Xilongchi underground cavern[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(Supp.2):5 956-5 960.(in Chinese))
[4]张志强,李宁,陈方方,等.不同分布距离的软弱夹层对洞室稳定性的影响研究[J].岩土力学,2007,28(7):1 363-1 368.(ZHANG Zhiqiang,LI Ning,CHEN Fangfang,et al.A study of influence of weak interlayers distributed at different intervals on opening stability[J].Rock and Soil Mechanics,2007,28(7):1 363-1 368.(in Chinese))
[5]王克忠,李仲奎.抽水蓄能电站地下洞室群层状围岩稳定性综合分析研究[J].水力发电学报,2008,27(5):68-72.(WANG Kezhong,LI Zhongkui.Comprehensive stability analysis on layer rock around subterranean chambers of pumped storage hydropower station[J].Journal of Hydroelectric Engineering,2008,27(5):68-72.(in Chinese))
[6]丁秀丽,董志宏,卢波,等.陡倾角沉积岩地层中大型地下厂房开挖围岩变形失稳特征和反馈分析[J].岩石力学与工程学报,2008,27(10):2 019-2 026.(DING Xiuli,DONG Zhihong,LU Bo,et al.Deformation characteristics and feedback analysis of surrounding rock of large underground powerhouses excavated in steeply dipped sedimentary rock strate[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2 019-2 026.(in Chinese))
[7]张占荣,盛谦,冷先伦,等.岩滩水电站地下厂房洞室群围岩稳定性分析[J].金属矿山,2008,(6):20-23.(ZHANG Zhanrong,SHENG Qian,LENG Xianlun,et al.Stability analysis of surrounding rock of underground powerhouse group in Yantan hydropower station[J].Metal Mine,2008,(6):20-23.(in Chinese))
[8]瞿万波,刘新荣,傅晏,等.洞桩法大断面群洞交叉隧道初衬数值模拟[J].岩土力学,2009,30(9):2 799-2 805.(QU Wanbo,LIU Xinrong,FU Yan,et al.Numerical simulation of preliminary lining of large section crossing tunnels constructed with PBA method[J].Rock and Soil Mechanics,2009,30(9):2 799-2 805.(in Chinese))
[9]江权,冯夏庭,向天兵.基于强度折减原理的地下洞室群整体安全系数计算方法探讨[J].岩土力学,2009,30(8):2 483-2 488.(JIANG Quan,FENG Xiating,XIANG Tianbing.Discussion on method for calculating general safety factor of underground caverns based on strength reduction theory[J].Rock and Soil Mechanics,2009,30(8):2 483-2 488.(in Chinese))
[10]聂卫平,徐卫亚,周先齐,等.向家坝水电站地下厂房围岩稳定的黏弹塑性有限元分析[J].岩土力学,2010,31(4):1 276-1 282.(NIE Weiping,XU Weiya,ZHOU Xianqi,et al.Viscoelasto-plastic finite element analysis of stability of surrounding rock for underground powerhouse of Xiangjiaba hydropower station[J].Rock and Soil Mechanics,2010,31(4):1 276-1 282.(in Chinese))
[11]谢和平,刘夕才,王金安.关于21世纪岩石力学发展战略的思考[J].岩土工程学报,1996,18(4):98-102.(XIE Heping,LIU Xicai,WANG Jin'an.Strategic prospect of rock mechanics'development in 21st century[J].Chinese Journal of Geotechnical Engineering,1996,18(4):98-102.(in Chinese))
[12]王思敬.中国岩石力学与工程的世纪成就与历史使命[J].岩石力学与工程学报,2003,22(6):867-871.(WANG Sijing.Century achievements and new historical mission of rock mechanics and engineering in China[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(6):867-871.(in Chinese))
[13]伍法权.我国岩土与工程研究的现状与展望——第三届全国岩土与工程大会学术总结[J].工程地质学报,2009,17(4):463-468.(WU Faquan.The state of the art and expectation of geoengineering in China—a summary for the 3th China national geoengineering conference[J].Journal of Engineering Geology,2009,17(4):463-468.(in Chinese))
[14]孙钧,刘保国.岩石力学问题的若干进展[J].岩土力学,1997,18(增):1-5.(SUN Jun,LIU Baoguo.Several developments in rock mechanics[J].Rock and Soil Mechanics,1997,18(Supp).:1-5.(in Chinese))
[15]卓加寿,邵国建,陈振雷.工程稳定问题中确定滑坍面、滑向与安全度的干扰能量法[J].水利学报,1997,(8):80-84.(ZHUO Jiashou,SHAO Guojian,CHEN Zhenlei.Disturbing energy method for determining the sliding face and direction and the safety coefficient of engineering stability[J].Journal of Hydraulic Engineering,1997,(8):80-84.(in Chinese))
[16]杨强,薛利军,王仁坤,等.岩体变形加固理论及非平衡态弹塑性力学[J].岩石力学与工程学报,2005,24(20):3 704-3 712.(YANG Qiang,XUE Lijun,WANG Renkun,et al.Reinforcement theory considering deformation mechanism of rock mass and non-equilibrium elastoplastic mechanics[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3 704-3 712.(in Chinese))
[17]苏国韶,冯夏庭,江权.高地应力下地下工程稳定性分析与优化的局部能量释放率新指标研究[J].岩石力学与工程学报,2006,25(12):1 741-1 756.(SU Guoshao,FENG Xiating,JIANG Quan.Study on new index of local energy release rate of stability analysis and optimal design of underground rock mass engineering with high geostress[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(12):1 741-1 756.(in Chinese))
[18]张传庆,周辉,冯夏庭.基于破坏接近度的岩土工程稳定性评价[J].岩土力学,2007,28(5):888-894.(ZHANG Chuanqing,ZHOU Hui,FENG Xiating.Stability assessment of rock mass engineering based on failure approach index[J].Rock and Soil Mechanics,2007,28(5):888-894.(in Chinese))
[19]孙钧.岩土力学与地下工程结构分析计算的若干进展[J].力学季刊,2005,26(3):330-339.(SUN Jun.Recent development on the computation techniques of geomechanics and underground structures[J].Chinese Quarterly of Mechanics,2005,26(3):330-339.(in Chinese))
[20]任建喜,葛修润.单轴压缩岩石损伤演化细观机制及其本构模型研究[J].岩石力学与工程学报,2001,20(4):425-431.(REN Jianxi,GE Xiuren.Study of rock meso-damage evolution law and its constitutive model under uniaxial compression loading[J].Chinese Journal of Rock Mechanics and Engineering,2001,20(4):425-431.(in Chinese))
[21]冯夏庭,江权,向天兵,等.大型洞室群智能动态设计方法[J].岩石力学与工程学报,2011,30(3):433-448.(FENG Xiating,JIANG Quan,XIANG Tianbing,et al.Intelligent and dynamic design methodology of large cavern group and its practice[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(3):433-448.(in Chinese))
[22]王思敬.论岩石的地质本质性及其岩石力学演绎[J].岩石力学与工程学报,2009,28(3):433-450.(WANG Sijing.Geological nature of rock and its deduction for rock mechanics[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(3):433-450.(in Chinese))
[23]HAJIABDOLMAJID V,KAISER P K.Brittleness of rock and stability assessment in hard rock tunneling[J].Tunnelling and Underground Space Technology,2003,18(1):35-48.
[24]尤明庆,苏承东,徐涛.岩石试样的加载卸载过程及杨氏模量[J].岩土工程学报,2001,23(5):588-592.(YOU Mingqing,SU Chengdong,XU Tao.Loading or unloading process in axial direction and Young's modulus of rock specimen[J].Chinese Journal of Geotechnical Engineering,2001,23(5):588-592.(in Chinese))
[25]江权,冯夏庭,陈国庆.考虑高地应力下围岩劣化的硬岩本构模型研究[J].岩石力学与工程学报,2008,27(1):144-152.(JIANG Quan,FENG Xiating,CHEN Guoqing.Study on constitutive model of hard rock considering surrounding rock deterioration under high geostress[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(1):144-152.(in Chinese))
[26]江权.高地应力下硬岩弹脆塑性劣化模型与大型地下洞室群围岩稳定性研究[博士学位论文][D].武汉:中国科学院武汉岩土力学研究所,2007.(JIANG Quan.Study on model and stability of surrounding rock of large underground caverns under high geo-stress condition[Ph.D.Thesis][D].Wuhan:Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,2007.(in Chinese))
[27]江权,冯夏庭,陈建林,等.锦屏二级水电站厂址区域三维地应力场非线性反演[J].岩土力学,2008,29(11):3 003-3 010.(JIANG Quan,FENG Xiating,CHEN Jianlin,et al.Nonlinear inversion of 3D initial geostress field in Jinping II hydropower station region[J].Rock and Soil Mechanics,2008,29(11):3 003-3 010.(in Chinese))
[28]杨志法,熊顺成,王存玉,等.关于位移反分析的某些考虑[J].岩石力学与工程学报,1995,14(1):11-16.(YANG Zhifa,XIONG Shuncheng,WANG Cunyu,et al.Some consideration of the back analysis from displacements[J].Chinese Journal of Rock Mechanics and Engineering,1995,14(1):11-16.(in Chinese))
[29]冯夏庭.智能岩石力学[M].北京:科学出版社,2000.(FENG Xiating.Introductin to intellinget rock mechanics[M].Beijing:Science Press,2000.(in Chinese))
[30]杨林德,颜建平,王悦照,等.围岩变形的时效特征与预测[J].岩石力学与工程学报,2005,24(1):212-216.(YANG Linde,YAN Jianping,WANG Yuezhao,et al.Study on time-dependent properties and deformation prediction of surrounding rock[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(1):212-216.(in Chinese))
[31]朱维申,李术才,陈卫忠.节理岩体破坏机制和锚固效应及工程应用[M].北京:科学出版社,2002.(ZHU Weishen,LI Shucai,CHEN Weizhong.Failure mechanical and anchoring effect of joint rock and application in engineering[M].Beijing:Science Press,2002.(in Chinese))
[32]FENG X T,KATSUYAMA K,WANG Y J,et al.A new direction:intelligent rock mechanics and rock engineering[J].International Journal of Rock Mechanics and Mining Sciences,1997,34(1):135-141.
[33]潘家铮.岩石力学与反馈设计[J].水电站设计,1994,10(3):3-10.(PAN Jiazheng.Rock mechanics and feedback design[J].Design of Hydroelectric Power Station,1994,10(3):3-10.(in Chinese))
[34]江权,冯夏庭,陈国庆,等.高地应力条件下大型地下洞室群稳定性综合研究[J].岩石力学与工程学报,2008,27(增2):3 768-3 777.(JIANG Quan,FENG Xiating,CHEN Guoqing,et al.Stability study of large underground caverns under high geostress[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(Supp.2):3 768-3 777.(in Chinese))
[35]HALLBAUER D K,WAGNER H,COOK N G W.Some observations concerning the microscopic and mechanical behavior of quartzite specimens in stiff[J].International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1973,10(1):37-86.
[36]ALEJANO L R,ALONSO E.Considerations of the dilatancy angle in rocks and rock masses[J].International Journal of Rock Mechanics and Mining Sciences,2005,42(4):481-507.
[37]程良奎.岩石加固实用技术[M].北京:地震出版社,1994.(CHENG Liangkui.Practical reinforcement technique of rock[M].Beijing:Earthquake Press,1994.(in Chinese))
[38]江权,冯夏庭,苏国韶,等.高地应力下拉西瓦水电站地下洞室群稳定性分析[J].水力发电学报,2010,29(5):132-140.(JIANG Quan,FENG Xiating,SU Guoshao,et al.Stability analysis of Laxiwa hydropower station's large underground caverns under high geostress condition[J].Journal of Hydroelectric Engineering,2010,29(5):132-140.(in Chinese))
[39]魏进兵,邓建辉,王俤剀,等.锦屏一级水电站地下厂房围岩变形与破坏特征分析[J].岩石力学与工程学报,2010,29(6):1 198-1 207.(WEI Jinbing,DENG Jianhui,WANG Dikai,et al.Characterization of deformation and fracture for rock mass in underground powerhouse of Jinping I hydropower station[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1 198-1 207.(in Chinese))
[40]卢应发,孙慧,李建林,等.水-岩石相互作用力学参数的探讨[J].岩石力学与工程学报,2009,28(10):1 995-2 005.(LU Yingfa,SUN Hui,LI Jianlin,et al.Investigation on mechanical parameters of water-rock interaction[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(10):1 995-2 005.(in Chinese))
[41]曹平,样慧,江学良,等.水岩作用下岩石亚临界裂纹的扩展规律[J].中南大学学报(自然科学版),2010,41(2):649-654.(CAO Ping,YANG Hui,JIANG Xueliang,et al.Subcritical crack growth of rock during water-rock interaction[J].Journal of Central South University(Science and Technology),2010,41(2):649-654.(in Chinese))