Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies
详细信息   
摘要
Purpose This paper explores the potential to simplify the life cycle assessment (LCA) process for a hydropower (HP) system, without significantly compromising the accurate representation of environmental burdens. Taking five HP case studies, two questions were addressed: (i) Does a 1 % materiality threshold capture at least 95 % of the key environmental burdens from cradle-to-operation? (ii) What is the effect of applying a materiality threshold based on the global warming potential (GWP) indicator for capturing other environmental impacts?