燃煤电厂原煤仓防堵煤设计研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on the Prevention of Coal Blocking in Power Plant Raw Coal Bunker
  • 作者:徐金苗 ; 吴阿峰 ; 李伟科 ; 樊晓茹 ; 奉林
  • 英文作者:XU Jinmiao;WU Afeng;LI Weike;FAN Xiaoru;FENG Lin;Guangdong Electric Design Institute;Vinh Tan 1 Power Company Limited;
  • 关键词:堵煤 ; 旋转清堵机 ; 原煤仓 ; 落煤管 ; 双曲线煤斗
  • 英文关键词:coal blocking;;rotary blockage clearing machine;;coal bunker;;coal dropping pipe;;hyperbolic coal hopper
  • 中文刊名:NYNF
  • 英文刊名:Southern Energy Construction
  • 机构:中国能源建设集团广东省电力设计研究院有限公司;越南永新一期电力有限公司;
  • 出版日期:2019-03-25
  • 出版单位:南方能源建设
  • 年:2019
  • 期:v.6;No.22
  • 基金:中国能建广东院科技项目“输煤除灰专业国际标准对标”(EX02561W)
  • 语种:中文;
  • 页:NYNF201901017
  • 页数:6
  • CN:01
  • ISSN:44-1715/TK
  • 分类号:98-103
摘要
[目的]燃煤电厂制粉系统堵煤是一个行业难题,特别是原煤仓堵煤。目前市场上防堵煤技术种类众多,但使用效果众说纷纭,文章旨在找到一个合适的防堵煤技术。[方法]分析了燃煤电厂制粉系统堵煤的原因;研究了双曲线型煤斗、不锈钢煤斗或内衬不锈钢设计、液压对开插板门、落煤管合理设计等防堵措施;重点针对旋转清堵机技术进行了调研。[结果]研究表明:旋转清堵机技术对于解决原煤仓堵煤有明显效果,但动静结合处均存在不同程度的润滑油泄露问题,需要对其密封型式、密封件等进行重点监控。[结论]各种防堵煤技术中旋转清堵机技术具有明显优势,值得推广使用。制粉系统防堵煤是一个综合工程,无论采用何种技术,都必须加强煤源、煤场的科学管理,实现入炉煤水分、粘度等指标的合理控制。
        [Introduction]Coal blocking of pulverizing system is a big problem in power plant, especially for coal bunker. At present, there are many types of anti-blocking coal technologies on the market, but there are different opinions on the use effect. This paper aims to find a useful technology to prevent the coal anti-blocking. [Method]The paper studied the coal blocking reasons and same anti-blocking technologies, such as hyperbolic coal hopper, stainless steel hopper, hydraulic split board damper, reasonable design of falling coal pipe etc. The research focused on the technology of rotary blockage clearing machine. [Result]The results show that the technology has obvious effect on solving the problem of coal plugging in the coal bunker. But there are lubricating oil leakage at the joints between the static and dynamic parts, which shall be paid more attention on sealing selection. [Conclusion]The rotary blockage clearing machine technology in various anti-blocking coal technologies has obvious advantages and is worthy of popularization.The prevention of coal plugging in the pulverizing system is a comprehensive project. Regardless of the technology used, it is necessary to strengthen the scientific management of the coal source and coal yard to achieve the control of the moisture and viscosity of the coal into the furnace.
引文
[1] 孔艳丽. 电厂原煤仓堵煤机理试验研究 [D]. 杭州:浙江大学,2013. KONG Y L. Experiment study on coal blockage mechanism of raw coal bunker in power plant [D]. Hangzhou:Zhejiang University,2013.
    [2] 贾源. 锅炉原煤仓堵煤原因分析及应对措施 [J]. 华电技术,2010,32(增刊1):35-36. JIA Y. Cause analysis of coal bunker blockage and countermeasures [J]. Huadian Technology,2010,32(Supp.1):35-36.
    [3] 耿正玮. 锅炉制粉系统煤斗堵煤解决方案探讨 [J]. 云南电力技术,2008,36(5):71-72. GENG Z W. Discussion on coal bunker blockage solution of boiler pulverizing system [J]. Yunnan Electric Power,2008,36(5):71-72.
    [4] 李德永,袁树彬,张铁铸,等. 华能伊敏电厂原煤仓堵煤原因分析及解决方案 [J]. 中国科技纵横杂志,2015,226(22):155-156. LI D Y, YUAN S B, ZHANG T Z,et al. Cause analysis and solution of raw coal bunker blockage in Yimin Huaneng Power Plant [J]. China Science & Technology Overview,2015,226(22):155-156.