摘要
文中对综采工作面过断层技术措施进行分析,并以山西某矿16402综采工作面为工程背景,对综采工作面过断层方案及矿压显现规律进行了研究,研究结果可以为其他矿井综采工作面过断层提供一定的借鉴。
In this paper, the technical measures of crossing faults in fully mechanized mining face are analyzed. Taking 16402 fully mechanized mining face of a mine in Shanxi as engineering background, the comprehensive fault face plan and the mining pressure appearance law of the fully mechanized mining face are studied. The research results can provide some reference for crossing faults in other fully mechanized mining faces.
引文