天荒坪抽水蓄能电站上水库设计特点及技术发展
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:The Design Characteristics and Technological Development of Reservoir in Tianhuangping Pumped Storage Power Station
  • 作者:王樱畯 ; 李金荣
  • 英文作者:WANG Yingjun;LI Jinrong;Pumped Storage Engineering Branch Center of National Energy and Hydropower Engineering Technology Research Center;Power China Huadong Engineering Corporation Limited;
  • 关键词:上水库 ; 防渗 ; 沥青混凝土 ; 排水 ; 坝轴线
  • 英文关键词:upper reservoir;;impermeability;;asphalt concrete;;drainage;;dam axis of upper reservoir
  • 中文刊名:DBGC
  • 英文刊名:Hydropower and Pumped Storage
  • 机构:国家能源水电工程技术研发中心抽水蓄能工程技术研发分中心;中国电建集团华东勘测设计研究院有限公司;
  • 出版日期:2018-10-20
  • 出版单位:水电与抽水蓄能
  • 年:2018
  • 期:v.4;No.21
  • 语种:中文;
  • 页:DBGC201805009
  • 页数:6
  • CN:05
  • ISSN:32-1858/TV
  • 分类号:34-39
摘要
天荒坪抽水蓄能电站上水库库盆防渗型式系国内首次采用全库盆沥青混凝土护面防渗,防渗面积达28.5万m2,坝体分区充分考虑利用库盆开挖的土石混合料筑坝,主坝坝轴线布置成弧线。本文主要介绍上水库设计特点,以及目前抽水蓄能工程库盆防渗及筑坝技术发展情况。
        The anti-seepage type of reservoir basin on Tianhuangping pumped storage power station is the first time in China to adopt the anti-seepage surface of asphalt concrete in the reservoir basin, with an impermeable area of 285,000 m2; The dam area is fully considered to use the earth and stone mixture excavated from the reservoir to build the dam, and the axis of the main dam is arranged into an arc. This paper mainly introduces the design characteristics of the upper reservoir and the current development of reservoir impermeability and damming technology in the pumped storage project.
引文
[1]张春生,姜忠见,等.抽水蓄能电站设计[M].北京:中国电力出版社,2012.ZHANGChunsheng,JIANGZhongjian,etal.Designof Pumped Storage Power Station.Beijing:China Electric Power Press, 2012
    [2]张春生,张克钊.天荒坪抽水蓄能电站上水库沥青混凝土护面设计及裂缝处理[J].水力发电,2007(1):37-39.ZHANGChunsheng,ZHANGKezhao.Designand Treatment on Asphaltic Concrete Facing of Upper Reservoir in Tianhuangping Pumped Storage Power Station[J]. Water Power,2017(1):37-39.
    [3]韩瑞,夏世法,杨明成.沥青混凝土面板防渗技术在呼蓄上库的应用[J].西北水电,2015(6)28-31.HAN Rui, XIA Shifa, YANG Mingcheng. Application of Permeability Technology in Asphalt Concrete Face Slab of Upper Reservoir, Huhehaote Pumped Storage Power Plant[J]. Northwest Hydropower, 2015(6):28-31
    [4]何世海,吴毅谨,李洪林.土工膜防渗技术在泰安抽水蓄能电站上水库的应用[J].水利水电科技进展, 2009,29(6):78-82.HE Shihai, WU Yijin, LI Honglin. Application of Geomembrane in Seepage Control Technique in Upper Reservoir of Tai’An Pumped Storage Power Station[J]. Advances in Science and Technology of Water Resources, 2009,29(6):78-82.