武汉地铁三号线土层盾构开挖引起的地表沉降研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为分析隧道盾构开挖引起的地表沉降规律,本文以武汉地铁三号线为工程背景,采用现场监测和数值模拟计算相结合的方法,综合分析了土质地层盾构开挖时隧道的纵向、横向地表沉降特征,探讨了不同注浆半径条件下地表沉降变化规律,结果表明:数值计算结果与现场监测数据相吻合;开挖过程中盾首上方地表沉降迅速,盾构穿过后沉降减缓,注浆后回弹,最终趋于平稳;隧道拱顶沉降值最大,平均沉降值约40 mm,离隧道轴线越远沉降值越小,形成沉陷槽,沉陷槽宽度约30 m;注浆半径越大,沉降值越小,施工时可根据技术要求和经济条件选择最优注浆半径。
In order to analyzes the characteristics of ground settlement caused by shield tunnel excavation,based on the engineering background of the Wuhan Metro line 3,this paper adopts the method of combining field monitoring and numerical simulation,compares and analyzes the law of surface subsidence in vertical and horizontal directions with shield excavation and discussed the rule of surface subsidence under the different conditions of different radius of grouting. The results indicate that the numerical calculation is in accordance with the field monitoring data. In the process of excavating,the settling velocity of ground above the front of shield is rapid. After the sedimentation of tunnel shield,the speed slows down. The surface rebounds after grouting,then the surface is in a constant state. The sedimentation number of the tunnel vault remains the biggest,and the average sedimentation number is about 40 mm. The farther the tunnel vault stays away from the tunnel axis,the smaller the sedimentation number reaches. Then the subsidence trough is formed,with a width remaining about 30 m. The smaller the radius of grouting is,the bigger the sedimentation number achieves. The optimal radius of grouting is chosen during the construction on the basis of technical requirements and economic conditions.
引文
[1]Peck R B.Deep excavations and tunneling in soft ground State of the Art Volume[C]//Proc.of the int.Conf.on soil Mechanics and Foundation Engineering,Mexico City,1969:225-290.
    [2]姚爱军,赵强,管江,等.基于北京地层地铁隧道施工的Peck公式的改进[J].地下空间与工程学报,2010,6(4):789-793.[YAO A J,ZHAO Q,GUAN J,et al.Improvement of Peck Formula in Subway Construction in Beijing[J].Chinese Journal of Underground Space and Engineering,2010,6(4):789-793.(in Chinese)]
    [3]宋克志,王梦恕,孙谋.基于Peck公式的盾构隧道地表沉降的可靠性分析[J].北方交通大学学报,2004,28(4):30-33.[SONG K Z,WANG M S,SUN M.Reliability Analysis of Ground Settlement with Shield Tunnel Construction Based on Peck Formula[J].Journal of Northern Jiaotong University,2004,28(4):30-33.(in Chinese)]
    [4]杨清源,麻凤海,胡国栋,等.大连地铁隧道施工的Peck公式改进[J].辽宁工程技术大学学报(自然科学版),2012,31(2):159-162.[YANG Q Y,MA F S,HU G D,et al.Improvement of Peck formula in subway construction under typical geological conditions[J].Journal of Liaoning Technical University(Natural Science),2012,31(2):159-162(in Chinese)]
    [5]郭延华,吴龙海.南京地层地铁隧道施工的Peck公式修正[J].河北工程大学学报(自然科学版),2013,30(1):41-44.[GUO Y H,WU L H.The correction of Peck formula in subway tunnel under Nanjing stratum[J].Journal of Hebei University of Engineering(Natural Science Edition),2013,30(1):41-44.(in Chinese)]
    [6]Finno R,Clough G W.Evaluation of soil response to EPB shield tunneling[J].Journal of Geotechnical Engineering,1985,111(2):157-173.
    [7]Ito T,Hisatake M.Three Dimensional Surface Subsidence Caused by Tunnel Driving[C]//Processings of the Fourth International Conference on Numerical Methods in Geomethaincals.Rotterdam,1982:551-559.
    [8]Rowe R K,Lo K Y,Kack G J.A method of estimating surface settlement above shallow tunnels in soft soil[J].Canadian Geotechnical Journal,1983,20(1):11-22.
    [9]刘厚祥,方风华,李宁,等.地铁隧道施工诱发桩基变形数值仿真分析[J].中南大学学报(自然科学版),2007,38(4):771-777.[LIU H X,FANG F H,LI N,et al.Numerical simulation analysis of deformation of pile foundation due to urban metro tunneling construction[J].Cent.South Univ.(Science and Technology),2007,38(4):771-777.(in Chinese)]
    [10]谢新宇,吴勇华,姜玮东,等.跨越地铁隧道超高层建筑桩筏基础数值模拟及优化设[J].中南大学学报(自然科学版),2011,42(10):3182-3188.[XIE X Y,WU Y H,JIANG W D,et al.Numerical simulation and optimized design of piled raft foundation of super-tall building crossing metro tunnel[J].Cent.South Univ.(Science and Technology),2007,38(4):771-777.(in Chinese)]
    [11]刘妮娜,门玉明,彭建兵,等.地震荷载作用下地铁盾构隧道动力响应分析[J].水文地质工程地质,2010,37(4):58-62.[LIU N N,MEN Y M,PENG J B,et al.Dynamic response of shield metro tunnel in earth quake load[J].Hydrogeology&Engineering Geology,2010,37(4):58-62.(in Chinese)]
    [12]苏永华,何新亮,罗正东.基于强度折减法的隧道围岩稳定性研究[J].水文地质工程地质,2014,41(1):48-53.[SU Y H,HE X L,LUO Z D.Research on the stability of surrounding rocks based on the strength reduction method[J].Hydrogeology&Engineering Geology,2014,41(1):48-53.(in Chinese)]
    [13]Shinichiro Imamura,Toshiyuki Hagiwara,Kenji Mito,et al.Settlement through above a Model shield observed in a centrifuge[C]//Centrifuge 98,Tokyo,1998:713-719.
    [14]Wu B R,Chiou S Y,Lee C J,et al.soil movements around Parallel tunnels in soft ground[C]//Centrifuge 98,Tokyo,1988:739-744.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心