基于二次刚度的新型桥墩快速修复加固方法研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为快速修复地震引起的损伤桥墩并提高其力学性能,对现有的修复加固方法,如增大截面法、粘钢加固法、纤维增强复合材料(FRP)加固法、预应力加固法、外包套管法、植筋加固法和以上几种方法的复合修复加固法进行了述评.提出基于二次刚度新型桥墩的快速修复加固方法,研究发现,所提修复加固方法比现有的修复加固方法更快、更贴近实际应用.指出结合实际震后工程的快速、可靠、简单的修复加固技术是未来的发展趋势之一.
To repair the earthquake-induced piers rapidly and improve the behaviors of such piers,this paper proposes a rapid repairing and reinforcement method for a novel bridge pier with post-yield stiffness after commenting on the existing repair and reinforcement techniques,i.e.increased cross-section reinforcement method,bonding steel reinforcement method,FRP reinforcement method,prestressed reinforcement method,jacket reinforcement method,additional bars reinforcement method and composite reinforcement method.It can be found that the proposed method is faster and more practical than the existing repair and reinforcement methods.And then it is pointed out that one of the trends of repair and reinforcement techniques will be rapid,reliable and simple technique for earthquake damaged bridge piers.
引文
[1]Mitchell D,Bruneau M,Williams M,et al.Performance of bridges in the 1994 Northridge earthquake[J].Canadian Journal ofCivil Engineering,1995,22(2):415-427.
    [2]Hashimoto S,Fujino Y,Abe M.Damage analysis of Hanshin expressway viaducts during 1995 Kobe earthquake.Ⅱ:damagemode of single reinforced concrete piers[J].Journal of Bridge Engineering,ASCE,2005,10(1):54-60.
    [3]Chang K C,Chang D W,Tsai M H,et al.Seismic performance of highway bridges[J].Earthquake Engineering and Engineer-ing Seismology,2000,2(1):55-77.
    [4]雷涛,李碧雄,曹鹏杰,等.汶川地震近断层附近桥梁震害浅析[J].重庆交通大学学报,2010,29(3):358-362.
    [5]雷俊卿,宋力勋.汶川百花大桥震害分析与抗震性能研究[J].北京交通大学学报,2012,36(1):1-5.
    [6]蒋劲松,庄卫林,刘振宇.汶川地震百花大桥震害调查分析[J].桥梁建设,2008,6(4):41-44.
    [7]Fukuyama K,Higashibata Y,Miyauchi Y.Studies on repair and strengthening methods of damaged reinforced concrete columns[J].Cement and Concrete Composites,2000,22(1):81-88
    [8]王轩.CFRP修复震后破坏GFRP管钢筋混凝土桥墩抗震性能试验研究[D].大连:大连理工大学,2011.
    [9]黄照南.CFRP修复震后严重破坏钢筋混凝土桥墩抗震性能试验研究[D].大连:大连理工大学,2010.
    [10]Lehman D E,Gookin S E,Nacamuli A M,et al.Repair of earthquake-damaged bridge columns[J].ACI Structural Jour-nal,2001,98(2):233-242
    [11]王清湘,王轩.碳纤维增强复合材料修复震后玻璃纤维增强复合材料管钢筋混凝土桥墩柱抗震性能试验[J].工业建筑,2011,41(10):6-9.
    [12]Youm K S,Lee H E,Choi S.Seismic performance of repaired RC columns[J].Magazine of Concrete Research,2006,58(5):267-276.
    [13]司炳君,孙治国,黄照南.钢筋混凝土桥墩地震弯剪破坏机理与震后快速修复技术研究[J].土木工程学报,2011,44(7):90-99.
    [14]张崇祥.新型混合配筋FRP管高铁墩柱抗震性能试验研究与数值分析[D].福州:福州大学,2012.
    [15]孙治国.钢筋混凝土桥墩震后修复技术研究综述[J].地震工程与工程振动,2009,29(5):128-132.
    [16]欧谨,刘伟庆.阪神地震后建筑物的修复方法与实例[J].工程抗震,1998(4):18-22.
    [17]孙利民,范立础.阪神地震后日本桥梁抗震设计规范的改订[J].同济大学学报,2001,29(1):60-64.
    [18]赵宏强.加大截面法加固混凝土构件的动力性能研究[D].西安:西安科技大学,2008.
    [19]赵明.增大截面法加固钢筋混凝土柱的受力性能研究[D].西安:西安科技大学,2009.
    [20]吴耀辉,魏志勇,吴庆安.钢筋混凝土梁粘钢加固的试验研究[J].四川建筑科学研究,1996(4):34-36.
    [21]梁丛中,李思明.钢筋混凝土梁粘钢加固的抗震性能研究[J].辽宁高职学报,1999,1(2):52-55.
    [22]刘敏,殷学纲.粘钢加固钢筋混凝土梁的有限元动力分析[J].重庆大学学报:自然科学版,2005,28(1):140-142.
    [23]郭光玲.柱截面形状对纤维布约束混凝土柱加固效果的影响[J].陕西理工学院学报,2006,4(22):24-26.
    [24]卓卫东,范立础.GFRP管-混凝土组合桥墩的概念及其抗震性能[J].福州大学学报:自然科学版,2005,33(1):73-79.
    [25]Mirmiran A,Shahawy M,Samaan M.Effect of column parameters on FRP confined concrete[J].Journal of Composites forConstruction,1998,2(4):175-185.
    [26]Ogata T,Osada K.Seismic retrofitting of expressway bridges in Japan[J].Cement and Concrete Composites,2000,22:17-27.
    [27]Saiidi M S,Cheng Zhi-yuan.Effectiveness of composites in earthquake damage repair of reinforced concrete flared columns[J].Journal of Composites for Construction,2004,8(4):306-314.
    [28]Ghosh K K.Seismic upgrade with carbon fiber-reinforced polymer of columns containing lap-spliced reinforcing bars[J].ACI Structural Journal,2007,104(2):227-236.
    [29]刘丽娜,王伟超,丁亚红.预应力加固法在土木工程中的研究应用[J].混凝土,2012(4):115-118.
    [30]Yarandi M,Saatcioglu M.Rapid seismic repair of damaged concrete bridge columns by transverse prestressing[C]//Proceed-ings of the 14th World Conference on Earthquake Engineering.Beijing:[s.n.],2008:1-8.
    [31]郭子雄,张杰,杨勇.设置外包预应力钢板箍RC短柱抗震性能研究[J].哈尔滨工业大学学报,2006,38(1):140-144.
    [32]Priestley M J N,Seible F,Calvi G M.Seismic design and retrofit of bridges[M].New York:John Wiley&Sons Inc,1996:585-680.
    [33]Kawashima K.Seismic design and retrofit of bridges[C]//Proceedings 12WCEE.Auckland:[s.n.],2000:329-348.
    [34]Youm K S,Lee H E,Choi S.Seismic performance of repaired RC columns[J].Magazine of Concrete Research,2006,58(5):267-276.
    [35]Aboutaha R S,Engelhardt M D,Jirsa J O,et al.Experimental investigation of seismic repair of lap splice failures in damagedconcrete columns[J].ACI Structural Journal,1999,96(2):394-405.
    [36]杨慎银.FRP筋布复合加固钢筋混凝土桥墩抗震性能试验研究[D].南京:东南大学,2012.
    [37]司炳君,孙治国,王清湘,等.钢筋混凝土延性桥墩震后快速修复技术研究[J].大连理工大学学报,2010,50(1):93-98.
    [38]Wu Yu-fei,Liu Tao,Wang Lei-ming.Experimental investigation on seismic retrofitting of square RC columns by carbonFRP sheet confinement combined with transverse short glass FRP bars in bored holes[J].Journal of Composites for Construc-tion,2008,12:53-60.
    [39]Cheng C T,Yang J C,Yeh Y K,et al.Seismic performance of repaired hollow-bridge piers[J].Construction and BuildingMaterials,2003,17(5):339-351..
    [40]Romualdi J P.Ferrocement for infrastructure rehabilitation[J].Concrete International:Design and Construction,1987,9(9):24-28.
    [41]Iorns M.Laminated ferrocement for better repair[J].Concrete International:Design and Construction,1987,9(9):34-38.
    [42]Mourad S M,Shannag M J.Repair and strengthening of reinforced concrete square columns using ferrocement jackets[J].Ce-ment and Concrete Composites,2012,34:288-294.
    [43]Francesca da Porto,Elena Stievanin,Carlo Pellegrino.Efficiency of RC square columns repaired with polymer-modified ce-mentitious mortars[J].Cement and Concrete Composites,2012,34:545-555.
    [44]Kawashima K.Enhancement of the seismic performance of bridge columns using an advanced material[C]//Proceedings of the3rd International Symposium on Advances in Urban Safety.Nanjing:[s.n.],2012:90-105.
    [45]GB 50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
    [46]Fukuyama K,Higashibata Y,Miyauchi Y.Studies on repair and strengthening methods of damaged reinforced concrete col-umns[J].Cement and Concrete Composites,2000,22(1):81-88.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心