引文
[1]田振农,孟祥栋,王国欣.城区隧道电子雷管起爆错相减震机理分析[J].振动与冲击,2012,31(21):108-111.TIAN Zhen-nong,MENG Xiang-dong,WANG Guo-xin.Mechanism analysis of fault-phase vibration reduction for tunnel blasting initiated by electronic detonators in city area[J].Journal of Vibration and Shock,2012,31(21):108-111.
[2]高文学,颜鹏程,李志星,等.浅埋隧道爆破开挖及其振动效应研究[J].岩石力学与工程学报,2011,30(S2):4154-4157.GAO Wen-xue,YAN Pen-cheng,LI ZHI-xing,et al.Blasting excavation and vibration effects of shallow tunnel excavation[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(S2):4154-4157.
[3]周春锋.城市浅埋隧道开挖减震控制爆破技术[J].工程爆破,2001,7(1):57-61.ZHOU Chun-feng.Vibration-rrducing controlled blasting technology for excavation of urban shallow tunnel[J].Engineering blasting,2001,7(1):57-61.
[4]朱泽兵,张永兴,刘新荣,等.特大断面车站隧道爆破开挖对地表建筑物的影响[J].重庆大学学报,2010,33(2):110-116.ZHU Ze-bing,ZHANG Yong-xing,LIU Xin-rong,et al.Influence of blasting vibration on adjacent buildings of station tunnel[J].Journal of Chongqing university,2010,33(2):110-116.
[5]龚建伍,夏才初,郑志东,等.鹤上三车道小净距隧道爆破振动测试与分析[J].岩石力学与工程学报,2007,26(9):1882-1887.GONG Jian-wu,XIA Cai-chu,ZHENG Zhi-dong,et al.Measurement and analysis of blasting vibration in Heshang three-lane tunnels with small clear-space[J].Chinese Journal of Mechanics and Engineering,2007,26(9):1882-1887.
[6]陈庆,王宏图,胡国忠,等.隧道开挖施工的爆破振动监测与控制技术[J].岩土力学,2005,26(6):964-967.CHEN Qing,WANG Hong-tu,HU Guo-zhong,et al.Monitoring and controlling technology for blasting vibration induced by tunnel excavation[J].Rock and Soil Mechanics,2005,26(6):964-967.
[7]凌同华,李夕兵.基于小波变换的时能分布确定微差爆破的实际延迟时间[J].岩石力学与工程学报,2004,23(13):2266-2270.LING Tong-hua,LI Xi-bing.Time-energy analysis based wavelet transform for identifying real delay time in millisecond blasting[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(13):2266-2270.
[8]徐振洋,杨军,陈占扬.高精度雷管逐孔起爆地震信号的精确时频分析[J].煤炭学报,2013,38(S2):331-335.XU Zhen-yang,YANG Jun,CHEN Zhan-yang.Precise timefrequency analysis on seismic signal by hole initiation using high-precision detonators[J].Journal of China Coal Society,2013,38(S2):331-335.
[9]范作鹏,钱守一,李启月.微差爆破实际延迟时间识别方法比较与优选[J].矿冶工程,2012,32(3):4-8.FAN Zuo-peng,QIAN Shou-yi,LI Qi-yue.Comparison and optimization of methods for real delay time identification in millisecond blasting[J].Mining and Metallurgical Engineering,2012,32(3):4-8.
[10]Huang N E,Shen Z,Long S R.A new view of nonlinear water waves-Hilbert spectrum[J].Ann Ren Fluid Mech,1999,31:417-457.
[11]钱守一,李启月.微差爆破实际延迟时间的HHT瞬时能量识别法[J].矿业研究与开发,2012,32(2):113-116.QIAN Shou-yi,LI Qi-yue.HHT instantaneous energy method to identify of delay time in millisecond blasting[J].Mining Research and Development,2012,32(2):113-116.
[12]张义平,李夕兵,赵国彦.爆破微差延时的EMD识别法[J].地下空间与工程学报,2006,3(2):488-490.ZHANG Yi-ping,LI Xi-bing,ZHAO Guo-yan.The method of using EMD to identify time of delay in millisecond blasting[J].Chinese Journal of Underground Space and Engineering,2006,3(2):488-490.
[13]凌同华,李夕兵.爆破振动信号不同频带的能量分布规律[J].中南大学学报(自然科学版),2004,35(2):310-315.LING Tong-hua,LI Xi-bing.Laws of energy distribution in different frequency bands for blast vibration signals[J].J.Cent.South Univ.(Natural Science),2004,35(2):310-315.
[14]李夕兵,凌同华.单段与多段微差爆破地震的反应谱特征分析[J].岩石力学与工程学报,2005,24(14):2409-2413.LI Xi-bing,LING Tong-hua.Response spectrum analysis of ground vibration induced by single deck and multi-deck blasting[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(14):2409-2413.
[15]赵明生,梁开水,李本伟.段药量对爆破振动信号时频特性的影响研究[J].振动与冲击,2012,31(7):85-88.ZHAO Ming-sheng,LIANG Kai-shui,LI Ben-wei.Influence of deck charge on time-frequency characteristics of a blasting vibration signal[J].Journal of Vibration and Shock,2012,31(7):85-88.