基于层次分析综合指数法的大坝震后震损破坏综合评价
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
近年来西南地区地震频繁发生,对该地区大坝造成不同程度的震损破坏,为了探究地震对水库、大坝等水利工程产生的风险及其破坏规律,需要对大坝的震损破坏进行评价分析。选取"汶川5·12"地震后岷江上游的14座大坝为评价研究对象,同时考虑水利工程设计、运行管理、地震特性和震损特征4个方面的影响因素,筛选与大坝震损破坏紧密相关的11项指标,构建大坝震损破坏综合评价指标体系,进而运用层次分析综合指数法建立了综合评价模型。根据该模型对14座大坝工程的震损状态进行实算综合评价,并对各个影响因素的重要性程度分析辨别,评价结果与现场调查情况基本相符,说明综合评价指标选择及其权重确定的合理性,以及层次评价方法的可行性。本次评价结果能为大中型水电工程科学防震提供重要依据。
In recent years,earthquakes occurred frequently in the Southwest of China,damaging dams in the region to different extents. Assessment on the seismic damage is necessary to exploring the risk and damage regularity for reservoirs and dams. Fourteen dams in the upstream of Minjiang River after "5·12 Wenchuan earthquake"are selected as evaluation objects. Moreover,impact factors inclusive of project design,operation and management,seismic properties and earthquake damage characteristics are considered,and 11 indexes are selected to form an index system and their weights are determined as well based on the criterion layer. Furthermore,synthetic index method of analytic hierarchy process is used to establish a model of comprehensive assessment. The model is applied to calculate the seismic damage status of 14 dams and discriminate the importance degree of each impact factor. The assessment result is almost consistent with the site investigation,which confirms that the evaluation indexes and their weights are reasonably determined. The result is an important basis for relieving earthquake damage scientifically for large or medium-sized hydropower projects.
引文
[1]陈学忠.四川地区7级以上地震危险性分析[J].国际地震动态,2002,(12):5-8.(CHEN Xue-zhong.Seismic Risk Analysis of Earthquakes of M≥7.0 in Sichuan Province,China[J].Recent Developments in World Seismology,2002,(12):5-8.(in Chinese))
    [2]鄢毅,岳昌桐.四川地质灾害特征及防治对策探讨[J].中国地质灾害与防治学报,2004,(15):123-127.(YAN Yi,YUE Chang-tong.Discussion on the Characteristics and Countermeasures for the Geological Hazard in Sichuan Province[J].The Chinese Journal of Geological Hazard and Control,2004,(15):123-127.(in Chinese))
    [3]赵振东,崔迪,余世州,等.汶川地震人员伤亡评估[J].世界地震工程,2012,28(2):20-25.(ZHAO Zhen-dong,CUI Di,YU Shi-zhou,et al.Seismic Casualty Assessment for Wenchuan Earthquake[J].World Earthquake Engineering,2012,28(2):20-25.(in Chinese))
    [4]代思波,张林,李佳奕,等.汶川地震震损水库情况调研及震害分析[J].四川水利发电,2009,28(5):73-75.(DAI Si-bo,ZHANG Lin,LI Jia-yi,et al.Investigation of Reservoirs Subjected to Wenchuan Earthquake and Their Seismic Damage Analysis[J].Sichuan Water Power,2009,28(5):73-75.(in Chinese))
    [5]李笃权.水工大坝的抗震减灾[J].西北水资源与水工程,1994,5(3):40-51.(LI Du-quan.Anti-seismic Engineering Measures for Hydraulic Dams[J].Water Resources and Water Engineering,1994,5(3):40-51.(in Chinese))
    [6]陈在铁,任青文.大坝抗震安全性研究进展[J].世界地震工程,2005,21(4):66-70.(CHEN Zai-tie,REN Qing-wen.Progress on Seismic Safety Research of Large Dams[J].World Earthquake Engineering,2005,21(4):66-70.(in Chinese))
    [7]李琳.材料力学法在大坝抗震复核中的应用[J].中国水能及电气化,2010,(9):45-50.(LI Lin.Application of Material Mechanics Method on Dam Anti-seismic Checking[J].China Water Power and Electrification,2010,(9):45-50.(in Chinese))
    [8]陈容,赵明.汶川地震对碧口等三座大坝的震损及修复工作综述[J].大坝与安全,2012,(3):6-10.(CHEN Rong,ZHAO Ming.Influence of Wenchuan Earthquake on Three Dams and Rehabilitations[J].Dam and Safety,2012,(3):6-10.(in Chinese))
    [9]梁海安,景立平,李永强,等.汶川地震震损水坝特征及震害影响因素分析[J].水电能源科学,2012,30(1):28-31.(LIANG Hai-an,JING Li-ping,LI Yong-qiang,et al.Characteristics of Damaged Dams and Influencing Factors in Wenchuan Earthquake[J].Water Resources and Power,2012,30(1):28-31.(in Chinese))
    [10]王士军,倪小荣,谷艳昌,等.汶川地震对四川水库大坝影响及其规律探讨[J].水利水运工程学报,2012,(6):1-6.(WANG Shi-jun,NI Xiao-rong,GU Yanchang,et al.Statistical Analysis of Wenchuan Earthquake-damaged Reservoir Dams in Sichuan Province[J].Hydro-science and engineering,2012,(6):1-6.(in Chinese))
    [11]郭明珠,任凤华,滕海文,等.大坝强震震害特征分析[J].土木工程学报,2003,36(11):106-109.(GUO Ming-zhu,REN Feng-hua,TENG Hai-wen,et al.The Characteristic Analysis of Dam Strong Earthquake Disaster[J].China Civil Engineering Journal,2003,36(11):106-109.(in Chinese))
    [12]晏志勇,王斌,周建平.汶川地震灾区大中型水电工程震损调查与分析[M].北京:中国水利水电出版社,2009:35-39.(YAN Zhi-yong,WANG Bin,ZHOU Jian-ping.Seismic Damage Investigation on Large and Medium Sized Hydropower Projects in Wenchuan Earthquake Area[M].Beijing:China Water Power Press,2009:35-39.(in Chinese))
    [13]赵焕臣,徐树柏.层次分析法[M].北京:科技出版社,1989:1-3.(ZHAO Huan-chen,XU Shu-bai.Synthetic Assessment[M].Beijing:Technology Press,1989:1-3.(in Chinese))
    [14]向望,华明,白志勇.基于层次分析的综合指数法对滑坡危险性评价[J].路基工程,2008,(5):197-199.(XIANG Wang,HUA Ming,BAI Zhi-yong.Comprehensive Evaluation of Landslide Hazard Based on Synthetic Assessment[J].Subgrade Engineering,2008,(5):197-199.(in Chinese))
    [15]黄润秋,李为乐.汶川大地震触发地质灾害的断层效应分析[J].工程地质学报,2009,17(1):19-28.(HUANG Run-qiu,LI Wei-le.Fault Effect Analysis of Geo-hazard Triggered by Wenchuan Earthquake[J].Journal of Engineering Geology,2009,17(1):19-28.(in Chinese))
    [16]石岩.浅析抗震设防烈度与震级[J].山西建筑,2008,34(12):102-103.(SHI Yan.Analysis on the Steel Structure Fireproof Structure Response and the Affecting Factors[J].Shanxi Architecture,2008,34(12):102-103.(in Chinese))
    [17]程心怒,刘国明,苏燕.高等水工建筑物[M].北京:中国水利水电出版社,2011.(CHENG Xin-nu,LIU Guo-ming,SU Yan.Advanced Hydraulic Structures[M].Beijing:China Water Power Press,2011.(in Chinese))
    [18]SL252—2000,水利水电工程等级划分及洪水标准[S].(SL252—2000,Standard for Classification and Flood Control of Water Resources and Hydroelectric Project[S].(in Chinese))
    [19]欧武涛,王伟.层次分析法在危岩稳定性评价中的应用:以重庆市渝北区老岩危岩为例[J].重庆交通大学学报,2011,20(增刊1):650-651,696.(OU Wutao,WANG Wei.Application of AHP in the Stability Evaluation of Perilous Rock:A Case Study of Old and Perilous Rock in Yubei District in Chongqing[J].Journal of Chongqing Jiaotong University,2011,20(Sup.1):650-651,696.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心