为研究在采煤沉陷水域进行漂浮建造的方法,运用三维数字化模拟,建立漂浮建造的规划布局和形态模型,提出漂浮建造方案:漂浮模块由上部结构、漂浮基座和系泊结构组成,单元式模块按需组合即可构成有机体系,并对此进行结构设计及计算方法研究.结果表明:上部结构和漂浮基座采用钢筋混凝土框架结构时,二者正投影面积比为1∶3,基座平面型式为正方形,由顶板、侧板和底板围合组成.采用桩基或者牵拉方式系泊固定:桩基系泊时,设置截面1.0m×1.0m和长度25.2m的钢筋混凝土抵抗柱;牵拉系泊时,在4个不同方向设置直径45mm的伸缩钢缆牵拉漂浮模块.
In order to study the construction method of the floating construction in mining subsidence water area,the planning layout and spatial model of the construction were designed with the aid of three-dimensional digital simulation.In the proposed design scheme,the floating module consist of superstructure,floating foundation and mooring structures;the unit module were assembled into the floating organic system as required.The related structure design and calculation method were investigated.The results show that the ratio of orthographic projection area is 1to 3when the reinforced concrete frame structure is adopted in the superstructure and the floating foundation.The plane of floating foundation is square,which is made up of the top,side and bottom plates.The pile foundation and traction mooring structures are designed to fix the floating modules to the underwater pile foundation.For the former mooring structure,the square resistance column is 25.2mlong and 1mon a side,and four stretchable steel cables with a diameter of 45 mm are designed to fix the floating module at four different directions.
引文
[1]付饶.周大地谈中国能源现状与突围途径[N].中国海洋石油报,2013-02-08(1).
[2]袁家柱.煤矿塌陷型水域水质控制因素研究[D].淮南:安徽理工大学地球与环境学院,2009:1.
[3]许士国,刘佳,张树军.采煤沉陷区水资源综合开发利用研究[J].东北水利水电,2010,318(8):29-31.XU Shiguo,LIU Jia,ZHANG Shujun.Study of comprehensive development and utilization of water resources in coal mining subsidence area[J].Water Resources&Hydropower of Northeast China,2010,318(8):29-31.
[4]刘书贤,魏晓刚,张弛,等.煤矿采动与地震耦合作用下建筑物灾变分析[J].中国矿业大学学报,2013,42(4):526-534.LIU Shuxian,WEI Xiaogang,ZHANG Chi,et al.Catastrophe analysis of buildings caused by the coupling effect of mining subsidence and earthquak[J].Journal of China University of Mining&Technology,2013,42(4):526-534.
[5]汤淏.基于平原高潜水位采煤塌陷区的生态环境景观恢复研究[D].南京:南京大学地理与海洋科学学院,2011:10-11.
[6]徐良骥.煤矿塌陷水域水质影响因素及其污染综合评价方法研究[D].淮南:安徽理工大学地球与环境学院,2009:2-5.
[7]姚章杰.资源与环境约束下的采煤塌陷区发展潜力评价与生态重建策略研究[D].上海:复旦大学环境科学与工程系,2010:4-6.
[8]渠俊峰,李钢,张绍良.基于平原高潜水位采煤塌陷土地复垦的水系修复规划[J].国土资源科技管理,2008,25(2):10-13.QU Junfeng,LI Gang,ZHANG Shaoliang.Restoration of water system based on land reclamation in subsided land of mining coal with higher level of underground water on plain[J].Scientific and Technological Management of Land and Resources,2008,25(2):10-13.
[9]鲁叶江,李树志,高均海,等.东部高潜水位采煤沉陷区破坏耕地生产力评价研究[J].安徽农业科学,2010,38(1):292-294.LU Yejiang,LI Shuzhi,GAO Junhai,et al.Study on damage farmland productivity evaluation in the eastern part of coal mining subsidence area with the high phreatic water level[J].Journal of Anhui Agricultural Sciences,2010,38(1):292-294.
[10]田洁.海上漂浮居住模式规划开发构想[D].济南:山东大学艺术学院,2011:8-16.
[11]褚冬竹.对水的另一种态度:荷兰建筑师欧道斯访谈及思考[J].中国园林,2011,27(10):53-57.CHU Dongzhu.Architecture on water:Interview with young Dutch Architect Koen Olthuis[J].Chinese Landscape Architecture,2011,27(10):53-57.
[12]STANLEY D B.Engineering earth[M].Netherlands:Springer,2011:184-206.
[13]ROGGEMA R.Adaptation to climate change:A spatial challenge[M].New York:Springer-Verlag New York Inc,2009:63-76.
[14]HAY W W.Experimenting on a small planet[M].Berlin:Springer-Verlag Berlin and Heidelberg GmbH&CoK,2013:113-137.
[15]FILHO W L.The economic,social and political elements of climate change[M].Berlin:Springer-Verlag Berlin and Heidelberg GmbH&CoK,2011:162-183.
[16]SINTUSINGHA S.Bangkok's urban evolution:Challenges and opportunities for urban sustainability[J].Megacities:Library for Sustainable Urban Regeneration,2011(10):133-161.
[17]WHITE J.Floating cities could redefine human existence[J].New Scientist,2012(9):26-27.
[18]NAKAJIMA T,KAWAGISHI U,SUGIMOTO H,et al.A concept for water-based community to sea level rise in the lower-lying land areas[A]//MTS.2012OCEANS[C].New York:Institute of Electrical and Electronics Engineers,2012:1-9.
[19]WANG C M,TAY Z Y.Very large floating structures:Applications,research and development[J].Procedia Engineering,2011,14(7):62-72.