引文
[1]维琦托莫夫编.土建工程冬季施工法[M].纪延龄,何文森,张宇辉,译.沈阳:东北工业出版社,1951:57-59.
[2]С.А米罗诺夫.混凝土冬季施工理论与方法[M].孙延珉,赵荣中,译.北京:中国建筑工程出版社,1958:204-235.
[3]P.B.威格涅儿著.混凝土和钢筋混凝土电热法[M].欧乃成,译.北京:重工业出版社,1954:34-37.
[4]建筑工程部混凝土施工工艺会议编.混凝土施工工艺[M].北京:建筑工程出版社,1959:290-299.
[5]白金铭.混凝土楼板蓄热法冬季施工及其热工计算[J].建筑技术,1957,1(13):13-15.
[6]姚春和.扩大蓄热法冬季施工的几点意见[J].建筑技术,1957,10(61):12-18.
[7]郑棣芳.混凝土工程蓄热法施工中热工计算的几个问题[J].建筑,1957,12(24):21-24.
[8]孟眧伯.对“8cm钢筋混凝土楼板蓄热法冬季施工”一文的意见[J].建筑技术,1958,3(69):35-37.
[9]刘道宜.混凝土蓄热法施工[M].北京:人民铁道出版社,1960:41-48.
[10]涂逢祥、张铁铮.混凝土工程蓄热法冬季施工热工计算的基本假设和数据选择[J].哈尔滨建筑工程学院学报,1964,12(4):43-53.
[11]吴震东.混凝土冬季蓄热法施工计算理论的研究[R].长沙:湖南大学科研处,1964:1-20.
[12]吴震东.非大体积混凝土蓄热冷却计算理论的研究[R].长沙:湖南大学科处,1979:1-23.
[13]STRAUS M W,LESHIE N.Mcclellam.Colling of concrete dams[M].Washing.Burea of Reclamation of United State Depart-ment of Interior Perss.,1934:36-39.
[14]WURSE R W.Steam curing of concrete[J].Magazing of concrete research.,1949,12(10):32-38.
[15]SSUL A G.Principles underlying the steam curing of concrete at atmospheric pressure[J].Magazing of concrete research.,1951,2(6):74-79.
[16]BERGRSTROM G S.Curing temperature,age and strength of concrete[J].Magazing of concrete research research.,1953,5(14):87-90.
[17]董季兰.高蘋感应加热原理及加热线圈的设计[J].太原工学院学报,1964,6(3):51-72.
[18]COPELAND L E,KANTRO D L,GEORGE.Between strength of hydration of portland cement[C]∥Proceeding of the Forth In-ternational Symposium.Proceeding of hydration of Portland cement.Washington:1960:45-49.
[19]COPELAND L E,KANTRO D L.Hydration of Portland cement[C]∥Tokyo.Proceeding of the Fifth International Symposium onthe Chemistry of Cement.Tokyo:The Cement Association of Japan.1968:378-399.
[20]CHRISTOPHER K Y,LEUNG,THANAKORN PHEERAPHAN.Very high early strength of microwave cured concrete[J].ce-ment and concrete rsearch.,1995,25(1):136-146.
[21]PAVLIK J,TYDLITAT V,CEMY R,KLECKA T,BOUSKA P,RVNANIKOVA P.Application of a microwave impulse techniqueto the measurement of free water content in early hydration stages of cement paste[J].Cement and concrete Research.,2003,33(5):93-102.
[22]WITTMANN F H,SCHLUDE F.Microwave absorption of hardened cement paste[J].Cem.Concr.Res.,1982,12(12):447-454.
[23]CORUR K,SMIT M K,WITTMANN F H.Microwave study of hydration cement paste at early age[J].Cem.Concr.Res.,1982,12(12):447-454.
[24]WU X,DONG J,TANG.Microwave Curing Technique in Concrete Manufacture[J].Cement and Concrete Research[J].,1987,1(17):205-210.
[25]LEUNG C K Y,PHEERAPHAN.Microwave Curing of Concrete of Experimental Results and Feasibility for Practical Applications[J].Construction and Building Material.,1994,24(6):102-107.
[26]ZHANG X,DING X Z,LIM T H,ONG C K,TAN B T G,YANG J.Microwave study of hydration of slag cement blends in earlyperiod[J].Cem.Concr.Res.,1995,25(7):1086-1094.
[27]ZHANG X,YANG Y,ONG C K.Study of early hydeation of OPC-HAC blends by microwave and calorimetry rechnique[J].Cem.concr.Res.,1997,27(5):1419-1428.
[28]铁道部丰台桥梁厂,铁道部科学研究院铁道建筑研究所.混凝土蒸汽养护[M].北京:中国建筑工业出版社,1979.36-49.
[29]邵德生.工频涡流加热法养护混凝土新工艺[J].低温建筑技术,1983,9(3):3-5.
[30]涂逢祥.欧美国家混凝土冷天施工[M].北京:中国建筑工业出版社,1980:54-59.
[31]许如源,陈梅赞.混凝土养护节能技术[M].北京:中国铁道出版社,1988:19-33.
[32]PIMACH A M.The construction and application of numerical models to the study of cloud dynamics and the structure of winterfrontal rainbands[J].Atmospheric Research.,1998,12(6):47–48 355–376.
[33]С.А米罗诺夫.混凝土冬季施工理论与方法[M]第3版.项玉璞等,译.北京:中国建筑工程出版社,1958,204-235.
[34]Л.Н.ЗИКЕЕВ.КанлидаттехническихнаукЛАГОИДААлександрВасильевич[M].ТЕХНОЛОГИИВЕТОНАСНРОТИВСМОРОЗНЫМИДОВАВКАМИ:АнторефератдиссертациинасоясканяеученоястелениМоеква.1987:22-23.
[35]侯缜冰,向绍杰,李恕先.固体热传导[M].编著.上海:上海科学技术出版社,1978:40-41.
[36]KIMA K H,JEONB S E,YANG S.An experimental study on thermal conductivity of concrete[J].Cement and Concrete Re-search 2003,33(4):363-371.
[37]MORABITO P.Measurement of the thermal properties of different concrete[M].High temp-Hight Press,1989:51-59.
[38]DCCHAENE R,SCHUTTER J D,TAERWE L,F.Van de WEEUM,L.Van DAMME.Thermal cracking in hardening concretearmour units[J].Pianc Bulletin.,82(1994)61-69.
[39]BENSTED J.Some applications of conduction calorimetry to cement hydration,concrete armour units[J].Pianc Bulletin.,1994,82(8):61-69.
[40]REINHARDT H W,BLAUWENDRAAD J,JONGENDIJK J.Temperature development in concrete strures taking accounts of statedependent properties[J].Paris:International Conference on Concrete at Early Ages.RILEM.,1982,211-218.
[41]TANABE T,MIZOBUCHI T.Analysis of cooling effect of pipe cooling system in massive concrete and determination of the coeffi-cient of thermal conxection at the surface of cooling pipe[R].Trans JCI,1983.77-82.
[42]KAWARABA H,KANOKOGI T,TANABE T.Development of the FEM program for the analysis of pipe cooling effects on thethermal stress of massive concrete[R].Trans JCI,1986.125-30.
[43]MACHIDA N,UEHARA K.Nonlinear thermal stress analysis of a massive concrete structure[J].Comput Struct.,1987,26(5):287-96.
[44]SAKACHI H A.study on thermal stress analysis of a mass concrete[R].Technical report no.33,Taikoku Corp,1983.35-49.
[45]Geert De Schutter.Hydration and temperature development of concrete made with blast-furnace slag cement[J].Cement andConcrete Research.,1999,29(10):143-149.
[46]LANCIANI A,MORABITO P.Measurement of the thermo-physical properties of structural materials in laborary and in Aitemethods of strumentation[J].High Temp-High Press.,1989,21(9):391-400.
[47]KIM J K,KIM K H,YANG J K.Thermal analysis of hydration heat in concrete structures with pipe-cooling system[J].Com-puters and sStructures.,2001,79(5):163-171.
[48]CERVERA M,FARIA R,OLIVER J,PRATO T.Numerical modelling of concrete curing,regarding.Hydration and temperaturephenomena[J].Computer and structures.,2002,80(4):1511-1521.
[49]TORRENTI JM,GHENOT I,LAPLANTE P,ACKER P,LARRAND F.Numerical simulation of temperatures and stresses in con-crete at early ages[C]∥LNBAZANT Z P,CAROL I,editors.Preceedings of the International Conference on Computational Mod-elling of Concrete Structures.Swansea:Pineridge Press,1944:59-68.
[50]BONDAREY V A.Variational method for solving non-linear problems of unsteady-state heat conduction[J].Int.J.HeatMass Transfer.,1997,1(14):3487-3495.
[51]朱伯芳,丁宝英,等.水工混凝土结构的温度应力与温度控制[M].北京:水力电力出版社,1976.34-36.
[52]MORABITO P,Measurement of the thermal properties of different concretes[J].High Temp and High Press.,1989,21(5):51-59
[53]JCI.Committee on the thermal stress[C]∥The state of the art report of thermal stress evaluation in massive concrete.NewYork:RILEM,1985.5-9.
[54]ABDALLAH I,MALKAWI H,SAAD A.Mutasher,and Tony J.Qiu,Charles Marketing.Thermal-structural modeling and tem-perature control of roller compacted concrete gravity dam[J].Journalof performance of constructed facilittes asce.,2003,32(9):177-187.
[55]MCCARTERA W J,BEN-SALEH A M.Inluence of practical curing methods on evaporation of water from freshly placed con-crete in hot climates[J].Building and Environment.,2001,36(12):919–924.
[56]LURAA P,BREUGELA K,MARUYAMAB I.Effect of curing temperature and type of cement on early-age shrinkage of high-performance concrete[J].Cement and Concrete Research.,2001,31(10):1867–1872.
[57]NMAI K.Cold Weather Concreting Admixtures[J].Cement and Concrete.,Landon:Composites 20 Printed in Great Britain.1998,17(4):I21-128.
[58]TASDEMIR C.Combined effects of mineral admixtures and curing conditions on the sorptivity coefficient of concrete[J].Cementand Concrete Research.,2003,33(12):1637–1642.
[59]WHITTINGTON,MECARTER H W,FORDE W J.M C The conduction of electricity through concrete[J].Mag.Concr.Res.,1981,33(114):48-60.
[60]WILSON J G,CUPTA N K.Equipment for the investigation of the accelerated curingof concrete using direct electrical conduction[J].Measurement.,2004,35(10):243-250.
[61]WOELFL W R.L.,SPANGLER M B.The electrical resistivity of concrete with the emphasis on the use of electrical resistancefor measuring moisture content[J].Cement Concr.Aggreg.,1980,23(9):64-67.
[62]JAPAN CONCRETE INSTIUTE.The measuring metheds of conductivity,diffusivity and specific hest of concrete and their applica-tion[R],Coner Div,1982.11-14.
[63]KIM K,SHIM j,YANG S.A Study on the Control Method of hydration Heat in double-T Beam Concrete Bridge[R].Res.Rep.,Korea Highway,Korea,1998,50-67.
[64]JAPAN CONCR.Inst.Repor.Thermal Stress in Mass ncrete[R],Tokyo:JCI State-of-the art report,1985.56-61.
[65]CHOI K S,YANG J K.Field measurement of hydration heat and field application of pipe-cooling system[R].Conf Kor:ConcInst,1994.381-6.
[66]ACI COMMITTEE 207 MASS CONCRETE.Aci Manual of Concrete practice[R],Detroit:American Concrete institute,1994,57-86.
[67]С.Г.Головнев,А.б.О.Вальт.лрименииразличныхтиловолалубоклризимнембетонировании[J].ЛРОМЫШЛЕННОЕСТРОИТЕЛЪСТВ,1978,31(12):28-29.
[68]郝屏祯.关于混凝土冬季施工综合蓄热法[C]∥黑龙江土木建筑学会,黑龙江低温建筑科学研究所主编.混凝土冬季施工理论与方法.哈尔滨:1983:50-59.
[69]郝屏祯.混凝土蓄热冷却的热工计算[J].低温建筑技术,1983,12(4):12-16.
[70]В.И.ЗУВКОВ.РАСЧЕТЗИМНЕГОБЕТОНИРОВАНЭЯКОНСТРУКЦИЙСВЫДЕРЖИВАНИЕМПОСПОСОЛУТЕРМОСА[J].ГИДРОТЕХНИЧЕСКОЕСТРОИТЕЛЗСТВО,1983,76-81.
[71]В.И.зубков.теоретическиеосновыметодоврасчетарежимоввыдерживаниябетоназимнихуоловиях[J].октябръ.1990,17(8):70-77.
[72]WINTER CONSTRUCTION COMMITTEE.Rilem Recommendations for Winter Concreting[C].1963 and 1984.43-46.
[73]洪悦郎,桑原隆司.寒中コンクり一ト施工指針の付錄PartⅡ[M].センメト.コンクり一ト.,1991,2(527):51-58.
[74]吴震东.非大体积混凝土蓄热冷却计算理论的研究[J].建筑技术,1981,10(10):37-41.
[75]吴震东.非大体积混凝土蓄热冷却时间的计算与施工要求[J].建筑技术,1983,10(10):37-41.
[76]吴震东.非大体积混凝土蓄热冷却时间的计算和计算表格[J].建筑技术,1987,10(10):11-16.
[77]国家技术监督局,中华人民共和国建设部.GB50204-92混凝土结构工程施工及验收规范[S].沈阳:辽宁科学技术出版社,1992.
[78]中华人民共和国建设部.JGJ104-97建筑工程冬期施工规程[S],北京:中国建筑工业出版社,1998.
[79]王异主编.混凝土冬期施工手册[M].哈尔滨:黑龙江科学技术出版社,1985.114-130.
[80]孙无二.大模和现浇框架混凝土蓄热冷却计算的探讨和应用[J].低温建筑技术,1987,6(2):12-17.
[81]杨崇永,张忠,雷明.钢筋混凝土工程[M].编著北京:中国建筑工业出版社,1988.407-413.
[82]项玉璞主编.冬期施工手册[M].北京,中国建筑工业出版社,1988:200-201;259-269.
[83]李发千.预制混凝土辞典[M].主编长春:长春出版社,1991:298-299.
[84]邓寿昌,徐光辉,余开华.非大体积混凝土蓄热冷却时间的计算和计算表格的应用[J].建筑技术,1989,10(10):12-15.
[85]余宗明.考虑室外温度周期性变化条件下混凝土蓄热法计算[J].低温建筑技术,1991,9(3):5-7.
[86]邓寿昌、徐光辉.非大体积混凝土蓄热计算公式中和取值的研讨[J].建筑技术,1991.10(10):23-26.
[87]舍宗明.蓄热法计算公式的几个应用问题[J].低温建筑技术,1992,3(1):2-5.
[88]舍宗明.蓄热法计算公式有关问题的研究[J].低温建筑技术,1992,9(3):6-9.
[89]徐光辉,邓寿昌.非大体积混凝土蓄热冷却计算理论研究的现状及其分析[J].建筑技术,1992,10(10):593-596.
[90]舍宗明.蓄热法计算公式初探[J].施工技术,1992,10(10):7-8.
[91]邓寿昌.吴震东蓄热微分方程与Б.Г斯克拉姆塔耶夫公式的理论分析与计算精度的比较[J].工业建筑,1992,12(12):31-39.
[92]邓寿昌,解其良,邓铁军.吴震东公式简化计算理论的研究[J].湖南大学学报,1993,4(2):95-102.
[93]邓寿昌.非大体积混凝土蓄热冷却计算和计算表格的补充[J].建筑技术,1993,10(10):603-605.
[94]THE ENGINEERING INDEX MONTHLY.The Index to the World`s engineering delopments[M],Novermber 1993 volume 31No.11 Published by:Engineering information Inc,Castlepoint on the Hudson Hoboken,NJ 07030,USA.1993.12.
[95]和宏明.建筑工程手册[M].第3卷.北京:地震出版社,1993:2298-2306;2362-2363.
[96]邓寿昌,徐光辉.非大体积混凝土蓄热冷却计算理论现状的分析[J].低温建筑技术,1994,3(1):6-7.
[97]纽长仁,马文海,李加和.对吴震东公式及计算方法的研讨[J].低温建筑技术,1994,9(3):22-23.
[98]余宗明.电热法养护混凝土升降温控制[J].低温建筑技术,1994,9(3):13-15.
[99]朱卫中,马文海,纽长仁.扩大综合蓄热法冬施技术基本概念探讨[C]∥哈尔滨:中国寒冷地区冬季施工技术交流网,1994:33-38.
[100]邓寿昌.非大体积混凝土蓄热冷却计算和计算表格的补充(续)[J].建筑技术,1994,10(10):583-587.
[101]舍宗明,刘秉浩.冬期施工人员技术手册[M].北京:冶金工业出版社,1994.5-6;59-66;91-92.
[102]李加和,纽长仁,王素梅.中国寒冷地区混凝土工程冬期施工发展状况[J].低温建筑技术,1994,12(4):2-4.
[103]邓寿昌.吴震东公式纳于GB50204—92的增补说明[J].低温建筑技术,1995,3(1):14-16.
[104]马文海,扬玉东,纽长仁.掺防冻剂水泥水化热的实验研究[J],低温建筑技术,1995,3(1):17-18.
[105]朱卫中,尚晓琳.中国建筑工程冬施基本方法问题(上)[J].低温建筑技术,1995,6(2):6-8.
[106]朱卫中,尚晓琳.中国建筑工程冬施基本方法问题(下)[J].低温建筑技术,1995,9(3):13-15.
[107]孙无二.混凝土综合蓄热法若干应用问题的探讨[J].低温建筑技术,1995,9(3):2-3.
[108]邓寿昌.混凝土电气加热蓄热冷却计算理论的研究[J].建筑技术,1995.10(10):597-600.
[109]舍宗明.“防冻剂标准”与“混凝土规范”中冬期施工的几个问题[J].施工技术,1995,10(10):45-46.
[110]邓铁军,邓寿昌,罗麒麟.高层建筑混凝土主体结构施工[M].编著.长沙:湖南科学技术出版社,1995,10:349-418.
[111]邓寿昌.吴震东电热热平衡微分方程式建立的理论研究[C]∥湖南省第二届青年学术年会论文集(工科下册).长沙:湖南科学技术出版社,1995:349-418.
[112]谢尊渊.建筑施工[M].北京:中国建筑工业出版社,1995.123-128.
[113]朱卫中,尚晓琳.冬施中混凝土抗冻临界强度若干概念的理解与实践[J].施工技术,1995,10(10):30-33.
[114]朱卫中,尹冬梅,尚晓琳,纽长仁.广义综合蓄热法混凝土蓄热冷却热工计算理论研究(上)[J].建筑技术,1995,10(10):595-597.
[115]朱卫中,尹冬梅,尚晓琳,等.广义综合蓄热法混凝土蓄热冷却热工计算理论研究(下)[J].建筑技术,1995,12(12):765-768.
[116]朱卫中,赖晓峰,李莉.混凝土抗冻临界强度取值与实践[J].低温建筑技术,1995,12(4):35-38.
[117]舍宗明.混凝土早期强度推算法及实用分析[J].低温建筑技术,1996,6(2):40-41.
[118]朱卫中,李莉,王新顺.对广义吴震东公式计算方法的研讨[J].低温建筑技术,1996,6(2):40-41.
[119]舍宗明.我国冬施技术十几年来的成就低[J].温建筑技术,1996,9(3):2–4.
[120]邓寿昌.吴震东公式纳于国标GB50204—92的应用说明[J].低温建筑技术,1996,9(3):2–4.
[121]朱卫中,金玉时,宋国军.冬施防冻剂混凝土保温蓄热计算方程临界线的确定[J].低温建筑技术,1996,9(3):20-21.
[122]邓寿昌,解其良.吴震东公式几个理论问题的研究[J].施工技术,1996,10(10):34-36.
[123]邓寿昌.吴震东方程考虑外源热不稳定传热的理论研究[J].建筑技术,1996,12(12):823-827.
[124]桥梁建筑材料、施工、试验与观测、安全,公路运输文摘,1997.
[125]孙无二.混凝土冬期施工方法选择及规范简化公式的应用[J].低温建筑技术,1997,9(3):2-5.
[126]梁德金,赵阳,郭兴军.负温高强混凝土配合比设计实例[J].低温建筑技术,1998,3(1):12-13.
[127]王恩奎,李春和,阎迎春,等.免震自密实负温混凝土冬期施工[J].低温建筑技术,1998,3(1):30-31.
[128]孙彦福,辛海虹.设计对冬施混凝土抗冻临界强度考虑[J].低温建筑技术,1998,6(2):14-15.
[129]舍宗明,刘秉浩.冬期施工人员技术手册[M].第2版北京:冶金工业出版社,1998.5-6;59-66;91-92.
[130]李晓伟,刘东椿.吴震东公式图算法[J].低温建筑技术,1998,9(3):13-14.
[131]朱卫中,刘延敏,纽长仁.广义综合蓄热法混凝土蓄热冷却计算理论的简化与应用(上)[J].低温建筑技术,1998,9(3):5-7.
[132]朱卫中,纽长仁.广义综合蓄热法混凝土蓄热冷却计算理论的简化与应用(下)[J].低温建筑技术,1998,12(4):5-8.
[133]邓寿昌.掺化学防冻剂混凝土蓄热冷却计算理论的研究[J].建筑技术,1998,10(10):622-675.
[134]舍宗明.吴震东公式与混凝土综合蓄热法[J].建筑技术开发,1998,12(6):3-5.
[135]张文渊.冬季施工中混凝土抗冻临界强度的试验研究[J].防渗技术,1999,2(2):24-26.
[136]刘东椿主编.图算法在高次方程和工程计算中的应用[J].上海:同济大学出版社,1992:89-112.
[137]江正荣,朱国梁.简明施工计算手册[M].第2版.北京:中国建筑工业出版社,1999.818-821.
[138]舍宗明.用数学分析法解决蓄热法温度计算式的实用问题[J].低温建筑技术,1999,9(3):26-28.
[139]邓寿昌,李克俭.吴震东公式简化计算研究(Ⅰ)[J].湖南农业大学学报,2000.2(1):67-71.
[140]邓寿昌,李克俭.吴震东公式简化计算研究(Ⅱ)[J].湖南农业大学学报,2000.4(2):142-146.
[141]邓寿昌.吴震东公式纳于国标GB50204-92的应用说明(续)[J].低温建筑技术,2000.6(2):3-8.
[142]邓寿昌,李克俭.对吴震东公式引入截面形状修正系数P的分析与讨论(上)[J].低温建筑技术,2000.9(3):6-8.
[143]邓寿昌,李克俭.对吴震东公式引入截面形状修正系数P的分析与讨论(下)[J].低温建筑技术,2000.12(4):6-8.
[144]邓寿昌.吴震东方程分析解的研究与混凝土电气加热法[J].建筑技术,2000,10(10):672-674.
[145]江正荣编著.建筑施工计算手册[M].北京:中国建筑工业出版社,2001:1003-1006.
[146]余宗明.电热法养护混凝土的温控与功率[J].低温建筑技术,2001,9(3):19-21.
[147]邓寿昌,李克俭.混凝土电极加热养护设计与施工要求[J].低温建筑技术,2001.9(3):21-23.
[148]马臣.冬期施工混凝土热工计算的应用[J].丹东纺专学报,2001,12(4):22-30.
[149]周水兴,何兆益,邹毅松等编著.路桥施工计算手册[M].北京:人民交通出版社,2002:307-308.
[150]项玉璞,王公山,朱卫中,姚吉元编著.冬期施工禁忌手册[M].北京:中国建筑工业出版社,2002:252-255.
[151]邓寿昌,李树丞.混凝土电阻系数的研究与分析[J].混凝土,2003,3(3):10-12;43-43.
[152]李树丞,郦伟,邓寿昌.导电混凝土材料电阻系数的研究与分析[J].湘潭大学学报,2003,9(3):5-9.
[153]王亮,余宗明.清华科技大厦冬期施工混凝土早期强度分析[J].北京建筑工程学院学报,2005.3(1):28-30.
[154]江正荣,朱国梁.简明施工计算手册[M].第3版北京:中国建筑工业出版社,2005:827-832.
[155]夏远斌,刘东春.再论吴震东公式图算法[J].低温建筑技术,2005,12(12):14-15.
[156]朱国梁等.混凝土结构工程施工禁忌手册[M].编著机械工业出版社,2006:78-79.
[157]邓寿昌,李哓目.土木工程施工[M].北京:北京大学出版社,2006:301-305.
[158]郭奇.浅谈混凝土冬期施工[J].西部探矿工程,2006,12(12):255-257.
[159]邓寿昌,张学兵,罗迎社.废弃混凝土再生利用的现状分析与研究展望[J].混凝土,2006,11(11):20-24.
[160]筑龙网.混凝土工程施工计算实例精选[G].组编.北京:人民交通出版社,2007.
[161]胡小舟,王兴利.高寒地区混凝土冬季施工技术[J].电力建设,2008,10(10):72-74.
[162]王勇.混凝土防冻的原理及使用[J].内蒙水利,2009,10(5):143-144.
[163]邓寿昌.混凝土和建筑外壁面温度场热学计算中的热交换系数的取值研究[J].惠州学院学报,2009,12(6):5-14.
[164]K.Kim,Y.H.Moon,and S.H.Eo.Compressive strength development of concrete with different curing time and temperature[J].Cement and Concrete Research,1998,28(12):1761–1773.
[165]项翥行.成熟度研究[J].混凝土,1990(6):1-5.
[166]Л.И.фнлнмонов.ТЕХНОЛОГИЯИНДУСТРИАЛЬНОГО[J].СТРОИТЕЛЪСТВАИЗМОНОЛИТНОГОБЕТОНА.,1989,33(12):201-208.
[167]Г.М.БАДЬИНАИА.В.МЕЩАНИНОВА,ТЕХНОЛОГИЯСТРОИТЕЛЬНОГОПРОИЗВОДСТВА.1987,21(7):45-49.
[168]项翥行.混凝土蓄热养护的试验研究与实际应用[J].建筑技术,1987,10(10):1-4.
[169]项翥行.蓄热法热工计算的试验与扩大应用[J].建筑技术,1987,10(10):18-23.
[169]孙无二.中央电视塔冬期施工技术[J].建筑技术,1990,10(10):10-13.
[170]北京市建筑工程公司编.北京地区混凝土综合蓄热法施工规程(试行)[G].北京:1990.
[171]张彭高.综合蓄热法在混凝土工程施工中的推广应用[J].包头钢铁学院学报,1995,6(2):93-97.
[172]徐育新,张兴昌,司红东.现浇框架硅冬期施工法有关措施[J].平原大学学报,1998,6(2):74-75.
[173]徐伟、骆艳斌、时春霞.主体结构工程施工计算[M].北京:中国建筑工业出版社,2008:174-184.
[174]莫鲁.混凝土结构工程施工及验收规范修订介绍[M].北京:中国建筑工业出版社,1992:2147-150.