引文
[1]Hubbert M K,Willis D G..Mechanics of hydraulicfracturing[J].Trans.AIME,1957,210(2):153-166.
[2]Haimson B C.The hydrofracturing stress measuringmethod and recent results[J].Int.J.Rock Mech.Sci.&Geomeh.Abstr.1978,15(2):167-178.
[3]李方全.谈谈水压致裂法[J].地震战线,1980,2(6):14-21.(Li Fangquan.Discussion of hydrofractur-ing method[J].Earthquake Front,1980,2(6):14-21.(in Chinese))
[4]ISRM.Suggested methods for rock stress determination.Int[J].Rock Mech.Min.Sci.&Geomech.Abstr.,1987,24(1):65-73.
[5]王建军.应用水压致裂法测量三维地应力存在的几个问题[J].岩石力学与工程学报,2000,19(2):229-233.(Wang Jianjun.Several problems in applica-tion of hydraulic fracturing method to in-situ 3-D stressmeasurement[J].Chinese Journal of Rock Mechanicsand Engineering,2000,19(2):229-233.(in Chi-nese))
[6]刘允芳,刘元坤.单钻孔中水压致裂法三维地应力测量的新进展[J].岩石力学与工程学报,2006,25(2):3 816-3 822.(Liu Yunfang,Liu Yuankun.Newadvanced in 3D geostress measurement by hydraulicfracturing technique in one borehole[J].Chinese Jour-nal of Rock Mechanics and Engineering,2006,25(2):3 816-3 822.(in Chinese))
[7]尹健民,刘元坤,艾凯,等.香港排污隧道工程水压致裂法地应力测量研究[J].地下空间与工程学报,2006,2(6):891-894.(Yin Jianmin;Liu Yuankun;AiKai,et al.Hydrofracturing in-situ stress measurementand analysis for drainage tunnel project in Hong KongIsland[J].Chinese Journal of Underground Space andEngineering,2006,2(6):891-894.(in Chinese))
[8]唐安春,赵文.岩石破裂全过程分析软件系统RF-PA2D[J].岩石力学与工程学报,1997,16(5):507-508.(Tang Chunan,Zhao Wen.RFPA2D system forrock failure process analysis[J].Chinese Journal ofRock Mechanics and Engineering,1997,16(5):507-508.(in Chinese))
[9]王元汉,苗雨,李银平.预制裂纹岩石压剪试验的数值模拟分析[J].岩石力学与工程学报,2004,23(18):3 113-3 116.(Wang Yuanhan,Miao Yu,LiYinping.Numerical simulation of the experiment onrock with preexisted cracks under compression andshearing[J].Chinese Journal of Rock Mechanics andEngineering,2004,23(18):3 113-3 116.(in Chi-nese))
[10]杨天鸿,于庆磊,王善勇,等.荷载和水压力作用下岩石裂纹贯通过程的数值模拟研究[J].岩石力学与工程学报,2005,24(1):5026-5030.(YangTianhong,Yu Qinglei,Wang Shanyong,et al.Study oncrack coalescence process under loading and hydraulicpressures[J].Chinese Journal of Rock Mechanics andEngineering,2005,24(1):5 026-5 030.(in Chi-nese))
[11]杨天鸿,唐春安,刘红元,等.水压致裂过程分析的数值试验方法[J].力学与实践,2001,23(5):51-54.(Yang Tianhong,Tang Chunan,Liu Hongyuan,etal.Numerical tests of progressive failure in hydraulicfracturing[J].Mechanics in Engineering,2001,23(5):51-54.(in Chinese))
[12]李连崇,杨天鸿,唐春安,等.岩石水压致裂过程的耦合分析[J].岩石力学与工程学报,2003,22(7):1 060-1 066.(Li Lianchong,Yang Tianhong,TangChunan,et al.Coupling analysis on hydraulic fracturingprocess of rock[J].Chinese Journal of Rock Mechanicsand Engineering,2003,22(7):1 060-1 066.(in Chi-nese))
[13]冷雪峰,唐春安,杨天鸿,等.岩石水压致裂过程的数值模拟分析[J].东北大学学报,2002,23(11):1 104-1 107.(Leng Xuefeng,Tang Chunan,YangTianhong,et al.Numerical simulation and analysis onheterogeneous and permeable rocks under hydraulic frac-turing[J].Journal of Northeastern University(NaturalScience)2001,23(11):1 104-1 107.(in Chinese))
[14]李根,唐春安,李连崇,等.水压致裂过程的三维数值模拟研究[J].岩土工程学报,2010,32(12):1 875-1 881.(Li Gen,Tang Chunan,Li Lianchong,etal.Numerical simulation of 3D hydraulic fracturingprocess[J].Chinese Journal of Geotechnical Engineer-ing,2010,32(12):1 875-1 881.(in Chinese))
[15]石亦平,周玉蓉.ABAQUS有限元分析实例详解[M].北京:机械工业出版社,2006.(Shi Yiping,Zhou Yurong.Some 4xamples analyzing based onABAQUS[M].Beijing:China Machine Press,2006.(in Chinese))
[16]曹金凤,石亦平.ABAQUS有限元分析-常见问题解答[M].北京:机械工业出版社,2009.(Cao Jinfeng,Shi Yiping.ABAQUS finite analysis-frequently askedquestions and answers[M].Beijing:China MachinePress,2009.(in Chinese))
[17]贺嘉,陈国兴.基于ABAQUS软件的大直径桩承载力-变形分析[J].地下空间与工程学报,2007,3(2):306-310.(He Jia;Chen Guoxing.Analysis ofbearing capacity-deformation of the large diameter pileby The ABAQUS Software[J].Chinese Journal of Un-derground Space and Engineering,2007,3(2):306-310.(in Chinese))