专题首页
中图分类法(9)
马克思主义、列宁主义、毛泽东思想、邓小平理论(1)
社会科学总论(3)
军事(3)
天文学、地球科学(2)
在“
自然资源管理
”中,
命中:
9
条,耗时:小于0.01 秒
1.
A dual-interval fixed-mix stochastic programming method for water resources management under uncertainty
作者:
J. Liu1
;
zyljing@126.com" class="auth_mail
;
Y.P. Li
;
yongping
.li@iseis.
org
" class="auth_mail
;
G.H. Huang2
;
gordon.huang@uregina.ca" class="auth_mail
;
X.T. Zeng1
;
zxt1231@sina.com" class="auth_mail
关键词:
Stochastic program
;
Vertex analysis
;
Planning
;
Water resources
;
Agricultural development
;
Uncertainty
刊名:Resources, Conservation and Recycling
年:41821
2.
A type-2 fuzzy interval programming approach for conjunctive use of surface water and groundwater under uncertainty
作者:
C.X. Wanga
;
chunxiao20083366@163.com" class="auth_mail" title="E-mail the corresponding author
;
Y.P. Lia
;
b
;
yongping
.li@iseis.
org
" class="auth_mail" title="E-mail the corresponding author
;
G.H. Huanga
;
b
;
1
;
gordon.huang@uregina.ca" class="auth_mail" title="E-mail the corresponding author
;
J.L. Zhanga
;
zjunlong0801@163.com" class="auth_mail" title="E-mail the corresponding author
关键词:
Agricultural irrigation
;
Conjunctive use
;
Optimization
;
Type-2 fuzzy intervals
;
Uncertainty
;
Water resources
刊名:Information Sciences
年:2016
3.
Inexact mixed-integer programming with interval-valued membership function for sustainable power-generation capacity planning
作者:
S.W. Jina
;
1
;
jinshuwei2014@126.com" class="auth_mail" title="E-mail the corresponding author
;
Y.P. Lia
;
b
;
yongping
.li@iseis.
org
" class="auth_mail" title="E-mail the corresponding author
;
G.H. Huanga
;
c
;
2
;
gordon.huang@uregina.ca" class="auth_mail" title="E-mail the corresponding author
;
K. Zhanga
;
3
;
zhangkaibetter@126.com" class="auth_mail" title="E-mail the corresponding author
关键词:
Capacity planning
;
Decision
;
Electric power system
;
Fuzzy programming
;
Sustainable
;
Uncertainty
刊名:Journal of Cleaner Production
年:2016
4.
Development of an optimization model for water resources systemsplanning
作者:
D.Y. Miaoa
;
1
;
asdaga_2006@163.com
;
Y.P. Lib
;
yongping
.li@iseis.
org
;
G.H. Huangb
;
2
;
gordon.huang@uregina.ca
;
Z.F. Yanga
;
3
;
zfyang@bnu.edu.cn
关键词:
De Novo programming
;
Fuzzy sets
;
Functional interval
;
Multiobjective
;
Uncertainty
;
Water resources
刊名:Engineering Applications of Artificial Intelligence
年:2013
5.
A queue-based interval-fuzzy programming approach for electric-power systems planning
作者:
F. Zhao1
;
zhaofeifir@163.com
;
Y.P. Li
;
yongping
.li@iseis.
org
;
G.H. Huang2
;
gordon.huang@uregina.ca
关键词:
Decision making
;
Fuzzy queuing
;
Interval parameter
;
Electric-power systems
;
Optimization
;
Uncertainty
刊名:International Journal of Electrical Power and Energy Systems
年:2013
6.
A robust optimization method for planning regional-scale electric power systems and managing carbon dioxide
作者:
C. Chen1
;
chencong0420@126.com
;
Y.P. Li
;
yongping
.li@iseis.
org
;
G.H. Huang2
;
huang@iseis.
org
;
Y.F. Li3
;
liyanfeng622@vip.qq.com
关键词:
Energy systems
;
CO2 trading
;
Planning
;
Robust optimization
;
Uncertainty
刊名:International Journal of Electrical Power and Energy Systems
年:2012
7.
Planning municipal-scale energy systems under functional interval uncertainties
作者:
Y. Zhu1
;
a ;
;
ying-zhu@hotmail.com
;
Y.P. Li
;
a ;
;
yongping
.li@iseis.
org
;
G.H. Huang2
;
a ;
;
gordon.huang@uregina.ca
关键词:
Decision making
;
Energy systems
;
Functional interval
;
Renewable energy
;
Risk analysis
;
Uncertainty
刊名:Renewable Energy
年:2012
8.
Optimization of the irrigation water resources for agricultural sustainability in Tarim River Basin, China
作者:
Y. Huanga
;
1
;
hy800821@163.com
;
Y.P. Lib
;
yongping
.li@iseis.
org
;
X. Chenc
;
2
;
chenxi@ms.xjb.ac.cn
;
Y.G. Mad
;
3
;
thank51@163.com
关键词:
Agriculture sustainability
;
Optimization
;
Tarim River Basin
;
Two-stage
;
Uncertainty
;
Water management
刊名:Agricultural Water Management
年:2012
9.
An interval full-infinite mixed-integer programming method for planning municipal energy systems – A case study of Beijing
作者:
Y. Zhua
;
1
;
ying-zhu@hotmail.com
;
G.H. Huanga
;
2
;
gordon.huang@uregina.ca
;
Y.P. Lia
;
yongping
.li@iseis.
org
;
L. Hea
;
3
;
li.he@ryerson.ca
;
X.X. Zhangb
;
4
;
zhangxiaoxuan@sgeri.sgcc.com.cn
关键词:
Decision making
;
Energy systems
;
Functional interval
;
Planning
;
Mixed-integer
;
Uncertainty
刊名:Applied Energy
年:2011
1
按检索点细分(9)
作者(9)
按年细分(9)
2031年及以后(1)
2016年(2)
2013年(2)
2012年(3)
2011年(1)
按来源细分(9)
Elsevier(9)
按类型细分(9)
期刊(9)