用户名: 密码: 验证码:
High Pressure Reinforcement Grouting of Surrounding Rock of High Pressure Tunnel under Complex Hydrogeological Condition
详细信息   
摘要
The fault developed in high pressure tunnel of Huizhou pumped storage power station is mainly tensional fault and shear fault with strong permeability.The fault along NE direction and NW/NNW direction forms a complex network with good permeability and complex hydrogeological condition.The excavation diameter of high pressure tunnel is 10 m,the hydrostatic pressure of internal water is 172~627 m.The tunnel adopts advanced design concept with thin lining of crack prevention reinforced concrete and lining thickness is 60 cm.Prevention of major water leakage from high pressure tunnel is the key factor of successful project engineering.The project operates well under systematic high pressure reinforcement grouting,aided with chemical grouting and water filling in main fault and fracture zone.This project set a successful example of using thin lining of crack prevention reinforced concrete in high pressure tunnel under complex hydrogeological condition.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700